| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.1 LAccepted-Finance | L1 | Accepted-Finance Lowest rate quated | |
| 2 | L2₹3.2 L+₹1,144.36 (0.36%)Rejected-Finance | L2 | Rejected-Finance Highest rate quated |
| Sl No | Description | Qty | Unit | R.RAJENDRAN CONTRACTOR L2 | V. Muthaiah L1 |
|---|---|---|---|---|---|
| 1.00Providing the BT road in Pillaiyar kovil west street at Karunakkamuthanpatti | |||||
| 1.01 | Providing and laying Tack coat over WBM surface(treated with primer) using 3Kg of bitumen emulsion RS-1 for 10sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., | 118.63 | cu.m | 24 ₹2,847.12 | 23 ₹2,728.49 Lowest |
| 1.02 | Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete. | 42.75 | cu.m | 2,417 ₹1,03,326.75 | 2,416 ₹1,03,284 Lowest |
| 1.03 | Providing and laying of prime coat using Emulsion at the rate of 7 Kg per ten square meter over the WMM surface preparatory to another bituminous construction over it. | 356.25 | cu.m | 86 ₹30,637.5 | 85 ₹30,281.25 Lowest |
| 1.04 | Providing and laying Tack coat over WBM surface(treated with primer) using 2.5Kg of bitumen emulsion RS-1 for 10sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., | 356.25 | cu.m | 35 ₹12,468.75 | 34 ₹12,112.5 Lowest |
| 1.05 | BITUMINOUS CONCRETE 25, 30/40 MM THICK USING cmp (Grade-II) Providing and laying Bituminious concrete to 40mm thick using 0.13cum of 19.00-9.50mm. 0.17cum of 9.5-2.36 and below with 50.3kgs of VG30/VG40 heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, carrying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonnes vibratory/phenumatic roller to the required density etc., including labour for attending to paver to site etc.including hire charges and fuel charges foe 20-30t CMP with bitumen boiler, tipper trucks,paver finisher/9m paver finisher,vibratory/phenumatic roller and all other tools and plants required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clauses 507 of MORTH Part-5 | 8.91 | cu.m | 11,730 ₹1,04,514.3 | 11,729 ₹1,04,505.39 Lowest |
| 1.06 | Collection and supply of gritty gravel from appd quarry including cost and conveyance of all materials to site including all labour charges for spreading and compaction with power roller etc.complete, for SHOULDERS | 11.4 | cu.m | 930 ₹10,602 | 925 ₹10,545 Lowest |
| 1.07 | Provision for steel Name board | 1 | cu.m | 3,030 ₹3,030 | 3,000 ₹3,000 Lowest |
| 2.00 | GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package} | 1 | GST Amount (in Rupees) | 48,136.76 ₹48,136.76 | 47,962.19 ₹47,962.19 Lowest |
Tender Value
₹3.2 L
EMD Value
₹3,200
Closing Date
9 Sept 2025, 3:30 pmClosed
Block Development Officer (BP)
Panchayat Union Office, Cumbum
Providing the BT road in Pillaiyar kovil west street at Karunakkamuthanpatti
2025_RDTN_600041_1
1596/2025/A2 Date 28.08.2025
Open Tender
Civil Works - Others
Item Rate
Cumbum
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹3,200
Yes
12 Sept 2025
3 Sept 2025
9 Sept 2025
3 Sept 2025
9 Sept 2025
3 Sept 2025
Amount
Providing the BT road in Pillaiyar kovil west street at Karunakkamuthanpatti
Providing and laying Tack coat over WBM surface(treated with primer) using 3Kg of bitumen emulsion RS-1 for 10sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc.,
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete.
Providing and laying of prime coat using Emulsion at the rate of 7 Kg per ten square meter over the WMM surface preparatory to another bituminous construction over it.
Providing and laying Tack coat over WBM surface(treated with primer) using 2.5Kg of bitumen emulsion RS-1 for 10sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc.,
BITUMINOUS CONCRETE 25, 30/40 MM THICK USING cmp (Grade-II) Providing and laying Bituminious concrete to 40mm thick using 0.13cum of 19.00-9.50mm. 0.17cum of 9.5-2.36 and below with 50.3kgs of VG30/VG40 heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, carrying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonnes vibratory/phenumatic roller to the required density etc., including labour for attending to paver to site etc.including hire charges and fuel charges foe 20-30t CMP with bitumen boiler, tipper trucks,paver finisher/9m paver finisher,vibratory/phenumatic roller and all other tools and plants required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clauses 507 of MORTH Part-5
Collection and supply of gritty gravel from appd quarry including cost and conveyance of all materials to site including all labour charges for spreading and compaction with power roller etc.complete, for SHOULDERS
Provision for steel Name board
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
R.RAJENDRAN CONTRACTOR (BID ID -1452712)
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .