Rural Development and Panchayat Raj Department
Construction of Sri Kumarswamy temple at ward no 39 in Ballari City
269025
RDPR/2025-26/BD/WORK_INDENT23370/CALL-2
Open
Buildings
RDPR Division Office Ballari
₹640
₹51,000
3 Mar 2026
23 Feb 2026
26 Feb 2026
Construction of Sri Kumarswamy temple at ward no 39 in Ballari City
Earth work excavation by manual means for drains, canals, waste weir, draft, approach channels, key trenches, foundation of Buildings & bridges and such simillar works in all kinds of soils, as per dr...
Construction of Embankment by excavating the available approved Gravel/ Murrum deposited at a place or borrow pits during or prior excavation with all lifts and lead, transportation to site, spreading...
Providing and injecting chemical emulsion for Pre-constructional Anti-Termite Treatment, creating continuous chemical barrier under and around the column pits, walls, trenches, basement excavation, to...
Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes...
Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. T...
Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/tra...
Additonalities for Formwork, Centering & Scaffolding of Foundation 8percent
Additonalities for Formwork, Centering & Scaffolding of Plinth Beams of Building is 50percent
Additonalities for Formwork, Centering & Scaffolding of Columns is 70percent
Additonalities for Formwork, Centering & Scaffolding of RCC, Beam, Lintel is 60percent
Additonalities for Formwork, Centering & Scaffolding of RCC roof slab is 50percent
Additonalities for Formwork, Centering & Scaffolding of RCC roof slab is 50percent
Steel Fabrication: Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/w...