Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹13.8 LAdmitted-Finance | -20.10% | ₹13.8 L | L1 | Admitted-Finance |
| 2 | L2₹14.0 L+₹20,552.18 (1.49%)Admitted-Finance | -18.91% | ₹14.0 L+₹20,552.18 (1.49%) | L2 | Admitted-Finance |
| 3 | L3₹14.1 L+₹29,187.56 (2.12%)Admitted-Finance | -18.41% | ₹14.1 L+₹29,187.56 (2.12%) | L3 | Admitted-Finance |
| 4 | L4₹14.2 L+₹36,095.85 (2.62%)Admitted-Finance | -18.01% | ₹14.2 L+₹36,095.85 (2.62%) | L4 | Admitted-Finance |
| 5 | L5₹14.2 L+₹39,031.88 (2.83%)Admitted-Finance | -17.84% | ₹14.2 L+₹39,031.88 (2.83%) | L5 | Admitted-Finance |
Tender Value
₹17.3 L
EMD Value
₹34,500
Closing Date
28 Jul 2026, 6:00 pmClosed
The Executive Engineer PWD Dn. Barmer
The Executive Engineer PWD Dn. Barmer
Construction work of 2 new volleyball fencing courts at Adarsh Stadium Barmer
2026_CEPWD_575900_2
EE PWD BMR NIT 05/2025-26
Open Tender
Civil Works
Percentage
150 days
BARMER
Please refer tender Documents
5 documents required · 5 mandatory
₹500
The Executive Engineer PWD Dn. Barmer
₹34,500
Yes
1 Aug 2026
19 Jul 2026
29 Jul 2026
19 Jul 2026
28 Jul 2026
19 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (Hydraulic Excavator)/ manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan) including dressing of sides and ramming of bottoms, lift upto 1.5 m, including taking out the excavated soil and depositing and refilling of jhiri with watering & ramming and disposal of surplus excavated soil as directed with in a lead of 50 meter. All kinds of soils | 132.65 | Cum | 178 | ₹23,611.7 |
| 2 | Filling available excavated earth (excluding rock) in trenches, plinth side of foundation etc. in layers not exceeding 20 cm. in depth, consolidating each deposited layer by ramming and watering including lead up to 50 meter and with all lift. | 684.32 | Cum | 64 | ₹43,796.48 |
| 3 | Providing and laying in position cement concrete including curing, compaction etc. complete in specified grade excluding the cost of centering and shuttering - All work up to plinth level.M10 grade Nominal Mix 1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size). | 22.11 | Cum | 3,302 | ₹73,007.22 |
| 4 | Random Rubble stone masonry for with hard stone in
foundation and plinth in Cement Sand mortar above 30 CM thick wall in Cement Mortar 1:4 ( 1-Cement : 4-Sand). | 88.44 | Cum | 3,182 | ₹2,81,416.08 |
| 5 | Random Rubble stone masonry with hard stone in superstructure above plinth level and upto five level above 30cm. thick walls in :Cement Mortar 1:4 ( 1-Cement : 4-Sand). | 66.33 | Cum | 3,824 | ₹2,53,645.92 |
| 6 | Add extra for facing as per design and detailed specifications including additional cost of stones Course rubble facing Second sort. | 260.12 | Sqm | 491 | ₹1,27,718.92 |
| 7 | Pointing on stone masonry in cement sand mortar 1:3 (1 cement : 3 sand) : Deep groove pointing | 156.07 | Sqm | 220 | ₹34,335.4 |
| 8 | Plaster on new surface on walls in cement sand mortar 1:6 including racking of joint etc. complete fine finish : 20mm thick | 416.19 | Sqm | 190 | ₹79,076.1 |
| 9 | Providing corrugated G.S. sheet roofing including vertical / curved surface fixed with polymer coated J or L hooks, bolts and nuts 8 mm diameter with bitumen and G.I. limpet washers or with G.I. limpet washers filled with white lead and including a coat of approved steel primer and two coats of approved paint on overlapping of sheets complete (upto any pitch in horizontal/ vertical or curved surfaces) excluding the cost of purlins, rafters and trusses and including cutting to size and shape whenever required. 0.80 mm thick with zinc coating not less than 275 gm/m2 | 93.64 | Sqm | 765 | ₹71,634.6 |
| 10 | Steel work in built up tubular trusses including cutting, hoisting ( height upto 10 m)fixing in position and applying a priming coat of approved steel primer, welded and bolted including special shaped washers etc. complete. Hot finished seamless type tubes. | 1,390 | Kg | 109 | ₹1,51,510 |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.34 MB
Tendernotice_2.pdf
PDF • 0.40 MB
Tendernotice_3.pdf
PDF • 1.71 MB
Tendernotice_4.pdf
PDF • 8.73 MB
BOQ_1024030.xls
BOQ • 0.35 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .