Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹18 CrAccepted-AOC 81 ARYA NAGAR ASSANDH ROAD PANIPAT HARYANA 132103 | PANIPAT | HARYANA | 132103 | ₹18 Cr Quoted ₹18.2 Cr | L1 | Accepted-AOC Tender is awarded to Sh. Rajesh Kadian Contractor |
| 2 | L2₹20.1 CrRejected-Finance 81 ARYA NAGAR ASSANDH ROAD PANIPAT HARYANA 132103 | PANIPAT | HARYANA | 132103 | ₹20.1 Cr | L2 | Rejected-Finance Rejected |
| 3 | Rejected-Technical VPO PANCH JATTAN SONEPAT 131001 | SONEPAT | SONIPAT | HARYANA | 131001 | - | - | Rejected-Technical Rejected in complainance of committee report |
| 4 | Rejected-Technical | - | - | Rejected-Technical Rejected in complainance of committee report |
Tender Value
₹17.4 Cr
EMD Value
₹34.9 L
Closing Date
3 Jan 2024, 3:00 pmClosed
AMIT KUMAR SANDILA
EE PHE Division No. 3 Palwal
Detailed project report for upgradation of existing supply scheme for village Banchari tehsil Hodal water Distt. Palwal Under Mahagram Yojna Detailed Project Report for providing Sewerage facilities and sewage treatment plant in village Banchari, D
2023_HRY_333201_1
20236314742F 4C7A 483C B8F4 4D0C08E8A44B561PUH
Open Tender
Civil Works
300 days
BANCHARI BANCHARI BANCHARI
Refer to the tender documents
3 documents required · 3 mandatory
₹20,000
₹34.9 L
Yes
MPHE Circle Palwal
16 Jan 2025
5 Dec 2023
3 Jan 2024
5 Dec 2023
3 Jan 2024
5 Dec 2023
14 Dec 2023
Amount
Provision for Scada system for all t/well to maintain properly complete in all respects
Provision for shifting of existing utility due to laying of sewer line and like water pipe, electricity pole, Telephone cables etc. as per site conditions
Provision for Canal/ Road Crossing by treanchless technology including all material and labour complete in all respect
Providing and fixing M.S GRATING OF SIZE 450mm x 450 mm including carriage loading unloading stacking handling re-handling etc. complete in all respects
Construction of HT/LT Panel room, PLC room, Centrifue house, blower room and Lab cum office building including doors, windows and fitting etc. at MPS and STP site covered area with RCC framed structure of brick work vitrified glazed tiles flooring, powder coated aluminium frame of size 100mm × 45mm of 10 guage for chowkhat, 75mm × 45mm of 10 guage for door frame, 45mm × 45mm of 10 guage for window frame with 5mm thick glass AIS/Saint Gobin/Modi Float.. Covered Area 400sqm).
Supplying, erection, testing and commissioning of horizontal motor pumping set for clear water having head 30.00 m as per the indicated requirements of discharge in LPM and power capacity in BHP as per IS marked. Discharge Capacity (LPM) 3500 Power Capacity (BHP) 40
Supplying and Fixing Led Street Light with all assoserieses
SEWAGE TREATMENT PLANT Design, construction, erection, testing and commissioning of 2.50 MLD capacity Sewage Treatment Plant based on Sequential Batch Reactor (SBR) Technology complete in all respect including Landscaping MCC Panel room and all other contingent Electrical, Mechanical, Electromagnetic Flow Measurement Device, Real Time Water Quality Monitoring with Data Collection System(Online analyzer), Piping and Instrumentation works. With PLC and SCADA Arrangement for STP and MPS along with Synchronizing it with each other including furniture and laboratory equipments as per detail given in the bid document and including following components including OandM of 5 Years after 12 months defect liability period after 3 months trail run period. 2 No. High Mast of 9 mtr GI Octagonal pole of 4 mm thickness (T=100 mm, B=200mm, Base Plate = 320 x 320 x 20 mm), Window at 500 mm from Base Plate with 6 No. LED energy outdoor suitable size reputed make efficient lamps on each pole, including 20 no. LED outdoor lights with GI poles 7 mtr high including all accessories along the road and path complete in all respect. Supply and installation of 1 No. Main Gate of (MS) 12 ft. wide main gate and 4 ft. wide wicket gate (total weight not less than 500 kg) at STP site. as per satisfaction of Engineer-in-charge. Providing and installing 2 No. centrifuges (1Working plus 1 Stand bye) including centrifuge feed pump, all fittings, instrumentations, electric panel board etc. as per design complete in all respect of the NIT, including packing dry sludge in 20Kg Bag and supplying the same Market Kisan Sewa Kendra or as directed by Engineer-in-charge within lead as posited as clause 4.4.5 of NIT including operation and maintenance of 5 Years after 12 months defect liability period after 3 months trail run period. Providing and installation of 2 nos. pumping sets of suitable size (1 working and 1 standby) with head 15 mtrs. in chlorination tank to disposed off the treated effluent including all fittings, instrumentations, electric panel board etc. as per design complete in all respect including operation and maintenance of 5 Years after 12 months defect liability period after 3 months trail run period. Supply, Installation, Testing, Commissioning, operation and Comprehensive Annual Maintenance of effluent quality monitoring system at 2.50 MLD STP for Online (Continuous) measuring of PH, total Suspended Solids (TSS) Chemical Oxygen Demand (COD), Biological Oxygen Demand (BOD) by single analyzer with various sensors (spectral measurement in the UV-VIS range 200-720mm) performing reagent and chemical free analysis with automatic cleaning of censor, signal cables and power cable, local data acquisition and display the data of continuous basis for up linking the data of CPCB, HSPCB and PHED, TUV Board approved complete in all respect as per Central Pollution Control Board (CPCB) guidelines for online continuous monitoring system for effluents and as contained in scope of work in the notice inviting tender:Multi-parameter measuring converter, for connecting up to 18 intelligent seniors Scope including 8 analog inputs/Outputs(4 Inputs and 4 outputs) (o/4-20Ma), wide range power supply optical COD/BOD and TSS probe with spectral processing of the UV-VIS range for measurement plant of 2.50 MLD STP with integrated with automatic cleaning.Robust digital pH/ORP sensor for pH/ORP electrodes, with built-in preamplifier and temperature sensor with Automatic Temperature Compensation (ATC) Cable length 100 Meter (minimum).Sensor adapter cable for all intelligent sensors, with IP68 water proof connection to intelligent sensors net system cable length 100 Meter (Minimum) Data Transfer to CPCB, HSPCB and PHED Servers during 1 year of OandM after commissioning after 3 months trail period (including 1 year of defect liability period). Providing GSM 3G, 4G Modem with mobilenetwork connectivity including network charges for 5 year of OandM after commissioning after 3 Months trail run (after 1 year defect liability period)
MAIN PUMPING STATIONS Design, construction, erection, testing and commissioning of MPS and following components including OandM for 5 years after 1 year defect liability period after 3 months trial run period. Panel room of 30 sqm. covered area and PLC room including toilet block of 20 Sqmtr. covered area with RCC framed structure of brick work vitrified glazed tiles flooring, Powder coated aluminium frame of size 100mm x 45mm of 10 gauge for chowkhat, 75mm x 45mm of 10 gauge for door frame, 45mm x 45mm of 10 gauge for window frame, 5mm thick glass AIS/Saint Gobin/Modi Float, The toilet block shell be with one half staff urinal and One European W/C, one wash hand basin as per approved drawings. RCC Inlet chamber, Screen Chamber, rectangular collecting tank suitable for 2.50 MLD average flow with peak factor of 3.00 land scaping of the campus complete in all respect. Providing and installing 1 No. Pumping Machinery of 3DWF, 2 Nos. of 1DWF and 2 Nos. 0.50 DWF with 15 Mtr Head each with suitable LT Panel equipped with all safety devices, automative capacitor bank and submersible cable from LT panel to pump set complete in all respect. K9 DI pipe of suitable dia at MPS Including welding and screwing of flanges, ISI marked D.I. fittings, Sluice valve, non return valves as per requirements even for bye-pass arrangements complete in all respect. 3 nos. CI Gear Operated Sluice Gate with SS Spindle (SS 410) and seats (SS 304) (2 nos. for screen and 1 no. for partition of collecting tank) as per design. Supply installation of 2 nos. mechanical course screens of minimum length 6 mtrs. for 2.50 MLD average flow with peak factor of 3.0.1. The connecting sewer of same diameter and material of construction, laid at adequate depth between existing sewers to newly constructed structures is included in scope of work. 2. All the infrastructure except construction of staff quarter, and path ways/ roads required to be executed at site to make the MPS functional is included in the scope of work for lump-sump job. 3. All the pumping machinery, panel board, Level sensor etc. shall be controlled by PLC and SCADA and shall be synchronized with PLC panels at MPS and STP site through broadband internet facility. 4. The size and quantities of all the above components will be as per approved structural /Hydraulic /Mechanical /Electric design to be approved by Department before actual execution of work including OandM of 5 Years after 12 months defect liability period after 3 months trail run period. ........
Providing and fixing 4” PVC Tee Complete in All respect
Providing and installation of 6 No. CCTV cameras including cost of Wiring DVR, cable, lens etc. complete in all respects.
Operation and Maintenance of water works for complete scope of work mentioned in the DNIT and of whole existing water supply scheme in the village Disinfection material supplied by the PHED as per schedule-IV for a period of 5 years after 12 months during defect liability period and 3 months trial run period. (will be charged to the A/mtc estimate). complete in all respects as per approved NIT. 1) Operation and maintenance during defect liability period after 3 month trial run period ( operation only)
1st year Operation and maintenance after defect liability period
2nd year Operation and maintenance
3rd year Operation and maintenance
4th year Operation and maintenance
5th year Operation and maintenance
Operation and Maintenance of Sewerage Network complete scope of work mentioned in the DNIT Disinfection material supplied by the PHED as per schedule-IV for a period of 5 years after 12 months during defect liability period and 3 months trial run period. (will be charged to the A/mtc estimate). complete in all respects as per approved NIT. 1) Operation and maintenance during defect liability period after 3 month trial run period ( operation only)
1st year Operation and maintenance after defect liability period
2nd year Operation and maintenance
3rd year Operation and maintenance
4th year Operation and maintenance
5th year Operation and maintenance
Bidder Name
Amount
RAJEEV KUMAR GOEL CONTRACTORS(GSTN-NA)--1001762
Rajesh Kadiyan Contractor(GSTN-NA)--1001351
RAJEEV KUMAR GOEL CONTRACTORS
RAJEEV KUMAR GOEL CONTRACTORS
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid