Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹88.3 LAccepted-AOC VILL BASI PO BINA DISTT SONEBHADRA UP 231220 | BINA | SONEBHADRA | UTTAR PRADESH | 231220 | ₹88.3 L | L1 | Accepted-AOC L1 |
| 2 | L2₹92.5 L+₹4.2 L (4.80%)Rejected-Finance JME COLONY SHAKTINAGAR DIST SONEBHADRA UP | SHAKTINAGAR | SONEBHADRA | UTTAR PRADESH | ₹92.5 L+₹4.2 L (4.80%) | L2 | Rejected-Finance L2 |
| 3 | L3₹99.6 L+₹11.3 L (12.8%)Rejected-Finance | ₹99.6 L+₹11.3 L (12.8%) | L3 | Rejected-Finance L3 |
| 4 | L4₹1.1 Cr+₹25.9 L (29.4%)Rejected-Finance NEAR BRAHMA KUMARI ASHRAM WAIDHAN DIST SINGRAULI M P 486886 | SINGRAULI | MADHYA PRADESH | 486886 | ₹1.1 Cr+₹25.9 L (29.4%) | L4 | Rejected-Finance L4 |
| 5 | Rejected-Technical LAXMI MARKET JAYANT PO JAYANT DIST SINGRAULI M P 486890 | 486890 | - | - | Rejected-Technical Ineligible for opening of price bid |
Tender Value
₹1.2 Cr
EMD Value
₹1.5 L
Closing Date
28 Mar 2026, 11:00 amClosed
S.O.(CIVIL)
Khadia Area Dist.-Sonebhadra U.P.
Modification of nandan kanan park as Ecopark at Khadia Area
2026_NCL_356376_1
GM/KHD/C/25-26/ETN-110 Date 11/03/2026
Open Tender
Civil Works - Others
Percentage
150 days
Khadia Area Dist.-Sonebhadra U.P.
REFER NIT
5 documents required · 5 mandatory
₹1.5 L
29 Aug 2026
11 Mar 2026
30 Mar 2026
11 Mar 2026
28 Mar 2026
12 Mar 2026
11 Mar 2026 - 21 Mar 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 0.1 | Item Description/ Heading | - | - | - | - |
| 1CIVIL PART | |||||
| 2WATCH TOWER | |||||
| 3 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan) including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. All kinds of soil. | 46 | cum | 206.7 | ₹9,508.2 |
| 4 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level PCC 1:2:4 (1cement:2 sand:4 20 mm agreegate) | 4 | Cum | 6,036.15 | ₹24,144.6 |
| 5 | Structural steel work riveted, bolted or welded in built up sections, trusses and
framed work, including cutting, hoisting, fixing in position and applying a priming
coat of approved steel primer all complete. | 2,721 | Kg | 115.05 | ₹3,13,051.05 |
| 6 | Painting with synthetic enamel paint of approved brand and manufacture to give an
even shade :Two or more coats on new work | 1,124 | Sqm | 95.7 | ₹1,07,566.8 |
| 7Yoga Plateform | |||||
| 8 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan) including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. All kinds of soil. | 19 | cum | 206.7 | ₹3,927.3 |
| 9 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level PCC 1:3:6 (1cement:3 sand:6 20 mm agreegate) | 36 | Cum | 5,402.95 | ₹1,94,506.2 |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Tendernotice_1.pdf
PDF • 2.87 MB
BOQ_369217.xls
BOQ • 0.39 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .