Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹2.5 LAccepted-AOC 39 39 THANGAMAPURI PATTINAM METTUR DAM 636402 | SALEM | TAMIL NADU | 636402 | ₹2.5 L Quoted ₹2.7 L | 1 | Accepted-AOC L1 |
| Sl No | Description | Qty | Unit | BHARATH ENGINEERING WORKS L1 |
|---|---|---|---|---|
| 1.00 | Charges for complete overhauling, replacement of brake coil, brake shoe, push buttons, etc…, load testing and certifying of the 5T capacity electrical hoist including the cost of spares. | 2 | Nos | 30,000 ₹60,000 |
| 2.00 | Charges for dismantling, overhauling assembling, load testing and certifying of 7.5 ton capacity mechanical chain pulley block. | 1 | No. | 14,900 ₹14,900 |
| 3.00 | Charges for complete overhauling load testing and certifying of 3 T max puller. | 1 | No. | 5,600 ₹5,600 |
| 4.00 | Charges for dismantling and bring down the 7.5 ton capacity trolley above the mill to mill floor, overhauling including cleaning and checking the bearing and gears in the trolleys replacement of worn out parts such as gears and bearings and assembling back for free movement of 7.5 ton capacity overhead movable trolleys with beams above mill floor at 8 mtr level. | 8 | Nos | 23,300 ₹1.9 L |
| 5.00 | Charges for consumables and T&Ps | 1 | LS | 2,700 ₹2,700 |
Tender Value
Refer Docs
EMD Value
₹2,600
Closing Date
6 Aug 2025, 2:00 pmClosed
Superintending Engineer /Mechanical-I/MTPS-I
Office of the Superintending Engineer / Mechanical -I Mettur Thermal Power Station- I Mettur Dam-636406
MTPS I Mill Plant Unit IV Overhauling load testing and certifying of lifting tools and movable trolleys
2025_EB_584885_1
CE / MTPS-I / SE / M-I / MP /OT.159/ 2025-26
Open Tender
Power/Energy Projects/Products
20 days
Mettur Thermal Power Station-I / Mettur Dam
As per the Tender Specifications
4 documents required · 4 mandatory
₹0
₹2,600
Yes
26 May 2026
23 Jul 2025
7 Aug 2025
23 Jul 2025
6 Aug 2025
23 Jul 2025
Amount
Charges for complete overhauling, replacement of brake coil, brake shoe, push buttons, etc…, load testing and certifying of the 5T capacity electrical hoist including the cost of spares.
Charges for dismantling, overhauling assembling, load testing and certifying of 7.5 ton capacity mechanical chain pulley block.
Charges for complete overhauling load testing and certifying of 3 T max puller.
Charges for dismantling and bring down the 7.5 ton capacity trolley above the mill to mill floor, overhauling including cleaning and checking the bearing and gears in the trolleys replacement of worn out parts such as gears and bearings and assembling back for free movement of 7.5 ton capacity overhead movable trolleys with beams above mill floor at 8 mtr level.
Charges for consumables and T&Ps
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.PDF
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid