Loading…
Loading…
Tender Value
₹13.4 L
EMD Value
₹27,000
Closing Date
27 Jul 2026, 1:00 pm2d left
EXECUTIVE ENGINEER
Office of the Executive Engineer Saryu Nahar Khand-3 Bahraich
Construction Of Kulaba at (Km.0.240 LB, Km.0.680 LB, Km.0.800 LB , Km.0.240 RB, Km.0.680 RB , Km.0.800 RB) Barbhawa Bairihwa
2026_UPIDC_1171098_3
01/EE/2026-27
Open Tender
Civil Works - Canal
Item Rate
180 days
BHINGA SRAWASTI
Plz refer Tender Documents
3 documents required · 3 mandatory
₹766
₹27,000
Yes
21 Jul 2026
21 Jul 2026
27 Jul 2026
21 Jul 2026
27 Jul 2026
21 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | E/w in digging foundation in all type of soil including all lead, lift, royalty, back filling and disposal of surplus earth for proper completion of work. | 1,379.55 | M3 | - | - |
| 2 | Laying plain cement concrete in 1:3:6 with 20 to 40 mm size crushed kabrai stone ballast & hamirpur coarse sand having F.M not less than 2.0 including all taxes, cost of all material, labour & T&P etc.With manual compaction required for proper compaction of work. | 13.74 | M3 | - | - |
| 3 | Laying cement concrete in 1:2:4 with 10 to 20 mm size crushed kabrai stone ballast & hamirpur coarse sand having F.M not less than 2.0 including all taxes, cost of all material, labour & T&P etc.With manual compaction required for proper compaction of work. | 0.8 | M3 | - | - |
| 4 | Centering and shuttering for C.C. work including all taxes cost of all material, labour, T&P etc. | 48.84 | M3 | - | - |
| 5 | Laying RCC in 1:1.5:3 with 10 to 20 mm size crushed Kabrai stone ballast and Hamirpur coarse sand having FM not less than 2.00 including all taxes, cost of all material, labour & T&P etc. With manual compaction required for proper completion of work. | 36.45 | M3 | - | - |
| 6 | Centering & shuttering for R.C.C. work including cost of all material , labour and T&P etc. required for proper completion of work | 269.37 | M2 | - | - |
| 7 | Cutting, bending, binding & placing of steel reinforcement in proper position including cost of all taxes, binding wire, Steel, Labour and T&P etc. required for proper completion of work . Note- Reinforcement steel bars should be used only Steel Authority of India Limited ( SAIL)/ TATA TMT bars. | 1 | MT | - | - |
| 8 | Dewatering Hiring charges of 5 H.P. diesel pump/Gen set includingoperator and P.O.L for running hours as per SOR Chap.-I/1-B/2(j) | 1,253.28 | Kwh | - | - |
| 9 | Supply laying and fixing 150 MM dia Hume pipe of Approved make including cost of all labour, material, T&P etc. complete | 54 | RM. | - | - |
| 10 | E/W in embankment for making bundha in all type of soil including all leads, lifts with proper dressing & manual compaction for proper completion of work including all taxes but excluding G.S.T. | 375.31 | M3 | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.10 MB
Ten_Doc.pdf
Tender Documents • 1.76 MB
BOQ_2198163.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].