Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹31.0 LAccepted-AOC | ₹31.0 L | L1 | Accepted-AOC Accepted |
| 2 | L2₹33.3 L+₹2.3 L (7.38%)Rejected-AOC | ₹33.3 L+₹2.3 L (7.38%) | L2 | Rejected-AOC Rejected |
| 3 | L3₹33.7 L+₹2.6 L (8.44%)Rejected-AOC TAMIL NADU | PONDICHERRY | PUDUCHERRY | 605007 | ₹33.7 L+₹2.6 L (8.44%) | L3 | Rejected-AOC Rejected |
| 4 | L4₹34.2 L+₹3.2 L (10.1%)Rejected-AOC | ₹34.2 L+₹3.2 L (10.1%) | L4 | Rejected-AOC Rejected |
| 5 | L5₹34.6 L+₹3.6 L (11.5%)Rejected-AOC | ₹34.6 L+₹3.6 L (11.5%) | L5 | Rejected-AOC Rejected |
Tender Value
₹40.7 L
EMD Value
₹40,700
Closing Date
17 Jul 2026, 3:00 pmClosed
ZONAL OFFICER VIII
NO-36 B,PULLA AVENUE ,SHENOY NAGAR ,CHENNAI-600030
CONSTRUCTION OF STORM WATER DRAIN OF SIZE (900X900MM) ALONG AT KUNJUDHAM GURUSWAMY STREET FROM STREET ONE END TO OTHER END IN DIVISION-97,UNIT-21,ZONE-08. (MLA FUND)
2026_CoC_684256_1
Z.O.VIII.C.NO.E1/767/2026
Open Tender
Civil Works
Works
150 days
GREATER CHENNAI COPORATION ZONE-VIII
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹40,700
7 Aug 2026
6 Jul 2026
17 Jul 2026
6 Jul 2026
17 Jul 2026
6 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | SDR - (Not Requiring Blasting) Earth work excavati...rite, soft rock or kankar, not requiring blasting. | 333 | CUM | 196.44 | ₹65,414.52 |
| 2 | Cement Concrete 1:3:6 (One Cement, Three crushed s...artmental officers. - Mixing by mechanical means | 24 | CUM | 6,709.81 | ₹1,61,035.44 |
| 3 | Supplying and erecting centering for plane surface...ng shall be given after the concrete is laid).BEAM | 661 | SQM | 1,178.29 | ₹7,78,849.69 |
| 4 | Providing And Laying In Position, Standarded Concr... The Department For The Excess Usage of Materials) | 103 | CUM | 9,238.39 | ₹9,51,554.17 |
| 5 | Supplying, fabricating and placing in position Rib...nt and binding wire) Upto plinth / Basement level | 10,403 | KGS | 96.53 | ₹10,04,201.59 |
| 6 | Refilling with excavated soil (other than sand) co...cification for filling in foundation and basement. | 102 | CUM | 45.85 | ₹4,676.7 |
| 7 | Supplying and fixing in position best approved of ...tmental officers 160mm dia PVC Pipe for Two Floors | 75 | R/M | 693.57 | ₹52,017.75 |
| 8 | Providing Iron Barricading of size 2m width and 1 ... | 130 | R/M | 174.91 | ₹22,738.3 |
| 9 | Construction of cast -in- situ Silt Catch Pit With...m HBG metal with 200mmdia slotted pvc pipe 6kg/cm2 | 6 | EACH | 37,739.2 | ₹2,26,435.2 |
| 10 | Construction of cast -in- situ Silt Catch Pit of i...0mm) -10 MT -completing the finishing work etc. | 18 | EACH | 10,743.84 | ₹1,93,389.12 |
stage.html
html • 0.06 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.89 MB
BOQ_822532.xls
BOQ • 0.29 MB
TENDERDOCUMENT.pdf
Tender Documents • 0.95 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .