| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹2.6 LAdmitted-Finance 14 SANTOSH ROY ROAD MAIL 7 SANTOSH ROY ROAD KOLKATA 700008 | KOLKATA | WEST BENGAL | 700008 | +0.00% | ₹2.6 L | L1 | Admitted-Finance |
| 2 | L2₹2.7 L+₹6,476 (2.50%)Admitted-Finance 102 1 PURBA FULL BAGAN KOL 700086 | KOLKATA | WEST BENGAL | 700086 | +2.50% | ₹2.7 L+₹6,476 (2.50%) | L2 | Admitted-Finance |
| 3 | L3₹2.7 L+₹10,335 (3.99%)Admitted-Finance 344 RAMKRISHNA NAGAR MUKHERJEE VILLAP O LASKARPUR KOLKATA 700153 | 24 PARAGANAS SOUTH | WEST BENGAL | 700153 | +3.99% | ₹2.7 L+₹10,335 (3.99%) | L3 | Admitted-Finance |
Tender Value
Refer Docs
EMD Value
₹5,200
Closing Date
21 Sept 2026, 5:00 pmClosed
EE-X
28, P.A SHAH ROAD, KOL-33
MAINTENANCE OF ASPHALTUM ROAD NEAR 11/9/1,60 GOBINDAPUR ROAD ETC IN WARD NO-093,BR-X.
2026_KMC_1041638_1
EEC/093/011/2026-2027
Open Tender
CIVIL WORKS
Percentage
90 days
WARD-093
Please refer Tender documents.
5 documents required · 5 mandatory
₹0
₹5,200
24 Sept 2026
11 Sept 2026
23 Sept 2026
11 Sept 2026
21 Sept 2026
11 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Box cutting or filling in Road embankment in all sorts of soil including spreading the spoils properly over the flank as necessary or on berm to approximate grade & camber and rolling the sub-grade with power roller to proper camber and grade as per direction and satisfaction of Engineer-in-charge including uprooting and removing plants and jungles when and where necessary. (a) Depth up to 150 mm. | 127.8 | SQM | 14.4 | ₹1,840.32 |
| 2 | Box cutting or filling in Road embankment in all sorts of soil including spreading the spoils properly over the flank as necessary or on berm to approximate grade & camber and rolling the sub-grade with power roller to proper camber and grade as per direction and satisfaction of Engineer-in-charge including uprooting and removing plants and jungles when and where necessary. (b) For each additional Depth of 150mm and part thereof. | 127.8 | SQM | 19 | ₹2,428.2 |
| 3 | Supplying, spreading and compacting Sand to required thickness, in layers not exceeding 150 mm to proper gradient and camber, inundating each layer by water and packing and ramming layer by layer to achieve desired compaction, including lighting, guarding, barricading and making adequate earthen bundh where necessary, curing with water as per direction, mending cracks and depressions by ramming wherever necessary. Note:- Add cost at site of the materials to arrive at the complete rate. The compaction factor for dry, clean sand may be taken as 0.835. (The payment is to be made on the basis of finished compacted volume). (c) For Silver Sand | 19.17 | M3 | 990.4 | ₹18,985.97 |
| 4 | Single Brick Flat Soling of picked jhama bricks including ramming and dressing bed to proper level and filling joints with local sand. | 127.8 | SQM | 358 | ₹45,752.4 |
| 5 | Water Bound Macadam Sub Base by consolidating Jhama metal / Laterite chelly or stone metal / shingles of specific size in hard crust to requisite thickness (measured after compaction) in layers including screening of metals etc. as necessary, hand packing, sweeping, watering and rolling in stages with power roller to proper line, grade and camber, lighting, guarding & barricading and making necessary earthen bundh of one metre width on each side where necessary to protect edges and preparing the bed by necessary cutting or filling and rolling all complete including the cost of all materials and hire and labour charges of all men and machineries and compacting to the required density, as per Clause 404 of Specifications for Road & Bridge Works of MoRT&H (5th Revision). (i) For Construction of Sub Base by consolidating Jhama metal / Laterite (63 mm to 45 mm) (Moorum replaced with course sand) (For compacted thickness 75mm) | 197.8 | SQM | 188.23 | ₹37,231.89 |
| 6 | Raising cover and frame of Catch Pit with CBW (1:4), 250 mm thick up to 100mm high with 20mm thick sand and cement plaster (1:4) including finishing with neat cement after cutting the asphaltum pavement taking out and re-fixing the existing cover and frame with cement concrete (1:1.5:3) with stone chips all round the frame surface including removal of surplus spoils. | 7 | EA | 1,323.07 | ₹9,261.49 |
| 7 | Picking up and removing old bituminous layer or sand sealing coat from old black topped surface and cleaning the exposed surface by scraping and stacking the material as directed. (a) By manual means : (i) From 25 mm to 50 mm thick. | 983.68 | SQM | 22.6 | ₹22,231.17 |
| 8 | Transportation and laying 40 mm thick hot asphaltum mixture from kmc plant to the work site including rolling but excluding the cost of tack coat (covered area- 1250 square meter per 100 mt hot-mixture) a) without paver finisher i) Day Time | 1,111.5 | SQM | 41 | ₹45,571.5 |
| 9 | Providing and applying tack coat with Cationic Bitumen Emulsion of approved grade conforming to IS: 8887-1978 on the prepared surface cleaned with Hydraulic broom, moistening the surface including cost and carriage of emulsion, hire charges of machinery and labour, cost of fuel and lubricants all complete as per Clause 503 of Specifications for Road & Bridge Works of MoRT&H (5th Revision). (ii) On Granular surfaces treated with primer. (Using Bitumen emulsion at the rate of 0.25 to 0.30 kg per sqm.) | 127.8 | SQM | 11.07 | ₹1,414.75 |
| 10 | Providing and applying tack coat with Cationic Bitumen Emulsion of approved grade conforming to IS: 8887-1978 on the prepared surface cleaned with Hydraulic broom, moistening the surface including cost and carriage of emulsion, hire charges of machinery and labour, cost of fuel and lubricants all complete as per Clause 503 of Specifications for Road & Bridge Works of MoRT&H (5th Revision). (i) On Bituminous Surface. (Using Bitumen Emulsion at the rate of 0.20 to 0.30 kg per sqm.) | 913.7 | SQM | 10.18 | ₹9,301.47 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.44 MB
BOQ_2557391.xls
BOQ • 0.27 MB
TF.pdf
Tender Documents • 0.59 MB
civil_new.pdf
Additional Documents • 4.88 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .