Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹19.7 LAccepted-AOC | L1 | Accepted-AOC Award of Contract | |
| 2 | Rejected-Technical | - | Rejected-Technical Rejected | |
| 3 | Not Admitted-Fee/PreQual/Technical/Finance | - | Not Admitted-Fee/PreQual/Technical/Finance Others-Docs not recvd |
Tender Value
₹20 L
EMD Value
₹20,000
Closing Date
21 Apr 2023, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Block Development Officer(VP) Madhuranthagam Block
Block Development Office, Madhuranthagam Block
Basic Amenities to SC Habitations under Pradhan Mantri Adarsh Gram Yojana(PMAGY) Scheme for the Year 2021-22 in Kavadur Panchayat at Madhuranthagam Block
2023_RDTN_302536_1
Rc.No.2310/2021/A9, Dated 22.02.2023
Open Tender
Civil Works - Water Works
Lump-sum
120 days
Kavadur
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹20,000
Yes
5 Sept 2023
15 Apr 2023
21 Apr 2023
15 Apr 2023
21 Apr 2023
15 Apr 2023
Amount
Construction of Drainage (90 m ) in Kavadur Colony 1st Cross Street @ Kavadur Panchayat. Estimate Amount : Rs.3.00 Lakhs
Earth work excavation and deposting on bank with in initial lead and lift in all classes of soil etc as per SS 20 B
Cement concrete 1:4:8 Mix using 40mm ISS HBG metal including cost and conveyance of materials to site including cost and labour charges for compacting curing and all incidental charges etc. complete
Supplying & Erecting centering for sides & soffiots including necessary supports & strutting Including all charges
Cement concrete 1:3:6 Mix using 40mm ISS HBG metal including cost and conveyance of materials to site including cost and labour charges for compacting curing and all incidental charges etc. complete
Plastering with CM 1:4, 20mm thick including all charges
Construction of Drainage (150 m ) in Kavadur Colony 2nd Cross Street @ Kavadur Panchayat. Estimate Amount : Rs.4.50 Lakhs
Earth work excavation and deposting on bank with in initial lead and lift in all classes of soil etc as per SS 20 B
Cement concrete 1:4:8 Mix using 40mm ISS HBG metal including cost and conveyance of materials to site including cost and labour charges for compacting curing and all incidental charges etc. complete
Supplying & Erecting centering for sides & soffiots including necessary supports & strutting Including all charges
Cement concrete 1:3:6 Mix using 40mm ISS HBG metal including cost and conveyance of materials to site including cost and labour charges for compacting curing and all incidental charges etc. complete
Plastering with CM 1:4, 20mm thick including all charges
Construction of Drainage (75 m ) in Kavadur Colony Othavadai Street @ Kavadur Panchayat Estimate Amount : Rs.2.50 Lakhs
Earth work excavation and deposting on bank with in initial lead and lift in all classes of soil etc as per SS 20 B
Cement concrete 1:4:8 Mix using 40mm ISS HBG metal including cost and conveyance of materials to site including cost and labour charges for compacting curing and all incidental charges etc. complete
Supplying & Erecting centering for sides & soffiots including necessary supports & strutting Including all charges
Cement concrete 1:3:6 Mix using 40mm ISS HBG metal including cost and conveyance of materials to site including cost and labour charges for compacting curing and all incidental charges etc. complete
Plastering with CM 1:4, 20mm thick including all charges
Construction of Drainage (75 m )in Kavadur Colony Thatchur Road @ Kavadur Panchayat. Estimate Amount : Rs.2.50 Lakhs
Earth work excavation and deposting on bank with in initial lead and lift in all classes of soil etc as per SS 20 B
Cement concrete 1:4:8 Mix using 40mm ISS HBG metal including cost and conveyance of materials to site including cost and labour charges for compacting curing and all incidental charges etc. complete
Supplying & Erecting centering for sides & soffiots including necessary supports & strutting Including all charges
Cement concrete 1:3:6 Mix using 40mm ISS HBG metal including cost and conveyance of materials to site including cost and labour charges for compacting curing and all incidental charges etc. complete
Plastering with CM 1:4, 20mm thick including all charges
Construction of Culvert in Lakshmipuram Colony @ Kavadur Panchayat Estimate Amount : Rs.2.00 Lakhs
Earth Work excavation and depositing on bank with initial lead of 10m and initial lead of 2m in hard stiff black cotton soil hard red eath shales murram gravel stoney eathth and earth mixed with small size boulders etc..
Cement concrete1: 4 : 8 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.
Cement concrete1: 3:6 mix using 40mm metal hard broken stone for foundation inclusive of shorting strutting bailing our tof water ramming curing etc.. including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.
Supplying & Erecting centering for sides fpor all reinforced cement concrete works like drain sides revetment sides etc using mild steel sheets of size 90cm x 60cm and BG 10 stiffened with mild steel angels of size 25mmz25mmz3mm including removing the same after specified period without damaging RCC works etc
Supplying & Erecting centering for sides fpor all reinforced cement concrete works like drain sides revetment sides etc using mild steel sheets of size 90cm x 60cm and BG 10 stiffened with mild steel angels of size 25mmz25mmz3mm including removing the same after specified period without damaging RCC works etc Deck Slab Bottom
Supplying and Fabricating and placing in position MS steel or ribbed for steel for all reinforced cement 5 concrete works as per the design given jncluding cost of steel and binding wire in all floors ete, Complete complying with stanard specification.
Reinforcement Cement concrete 1:11/2:3 using 20mm ISS HBG metal for all RCC item of works excluding cost of Rein for cement and fabricating charges, centering and shuttering but including curing and providing fixtures like fan clamps in the RCC floor or roof slabs
Construction of Culvert in Kavadur Colony Othavadai Street @ Kavadur Panchayat Estimate Amount : Rs.2.00 Lakhs
Earth Work excavation and depositing on bank with initial lead of 10m and initial lead of 2m in hard stiff black cotton soil hard red eath shales murram gravel stoney eathth and earth mixed with small size boulders etc..
Cement concrete1: 4 : 8 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.
Cement concrete1: 3:6 mix using 40mm metal hard broken stone for foundation inclusive of shorting strutting bailing our tof water ramming curing etc.. including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.
Supplying & Erecting centering for sides fpor all reinforced cement concrete works like drain sides revetment sides etc using mild steel sheets of size 90cm x 60cm and BG 10 stiffened with mild steel angels of size 25mmz25mmz3mm including removing the same after specified period without damaging RCC works etc
Supplying & Erecting centering for sides fpor all reinforced cement concrete works like drain sides revetment sides etc using mild steel sheets of size 90cm x 60cm and BG 10 stiffened with mild steel angels of size 25mmz25mmz3mm including removing the same after specified period without damaging RCC works etc Deck Slab Bottom
Supplying and Fabricating and placing in position MS steel or ribbed for steel for all reinforced cement 5 concrete works as per the design given jncluding cost of steel and binding wire in all floors ete, Complete complying with stanard specification.
Reinforcement Cement concrete 1:11/2:3 using 20mm ISS HBG metal for all RCC item of works excluding cost of Rein for cement and fabricating charges, centering and shuttering but including curing and providing fixtures like fan clamps in the RCC floor or roof slabs
Providing Pipe line in Lakshmipuram Colony @ Kavadur Panchayat Estimate Amount : Rs.2.00 Lakhs
Earth work excavation in all types of soil lead And lift ss 20 B etc complete Including All Labour Charges Including Cost and Conveyance etc Complete. .(1.00mx0.60mx1.05m)
Supply of unplasticised PVC rigid pipes as per BIS 4985/2000 with ISI Marking to site of works a. 90 mm OD PVC Pipe 6 KSC
Supply and Fixing of PVC Pipe Including Cost and Conveyance etc Completed a. 90 mm OD PVC Pipe 6 KSC
Refilling with excavated soil complying with standard specification in layers of 15 cm thick well rammed and consolidated after pipes and specials are laid and tested..(1.00mx0.60mx1.05m) a. 90 mm OD PVC Pipe 6 KSC
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
KRISHNAMOORTHY
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_358692.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .