Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹6.7 LAccepted-AOC | ₹6.7 L | L1 | Accepted-AOC AOC |
| 2 | L2₹6.7 LRejected-AOC | ₹6.7 L | L2 | Rejected-AOC AOC |
| 3 | L3₹6.8 LRejected-AOC | ₹6.8 L | L3 | Rejected-AOC AOC |
Tender Value
₹6.7 L
EMD Value
₹13,454
Closing Date
27 Jan 2026, 10:00 amClosed
BLOCK DEVEPMENT OFFICER
PHANSIDEWA,DARJEELING
CONSTRUCTION OF PAVER BLOCK AT BANURCHAT PRIMARY SCHOOL GROUND AT DHEMAL CHHAT WITHIN HETMURI SINGHIJHORA GP. Scheme/ Project(s) Id. No-APAS/01/027/116/0001, Job No-12
2026_DMD_990405_12
71 /BDO/PHD/APAS/HSGP/2025-26
Open Tender
CIVIL WORKS
30 days
HSGP
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹13,454
Yes
17 Feb 2026
19 Jan 2026
29 Jan 2026
19 Jan 2026
27 Jan 2026
19 Jan 2026
Earth work in excavation of foundation trenches or drains, in all sorts of soil (including mixed soil but excluding laterite or sandstone) including removing, spreading or stacking the spoils within a lead of 75 m. as directed. The item includes necessary trimming the sides of trenches, levelling, dressing and ramming the bottom, bailing out water as required complete. (a) Depth of excavation not exceeding 1,500 mm
Labour for laying 150 mm to 200 mm boulder soling including rough dressing hand packing and ramming down small pieces in the interstics including rolling and preparing the bed to proper level and filling up all joints with sandy clay or earth.(with Deptt Boulder) without rolling but including ramming.
Ordinary Cement concrete (mix 1:3:6) with graded stone chips (30 mm bazree) excluding shuttering and reinforcement,if any, in ground floor as per relevant IS codes. (b) River bazree
(b) 50 mm thick interlocking designer concrete paver block M-30 grade for non-traffic zone,buiding premises, garden, parks, domestic drive as per IS: 15658-2006(over 20-30 mm medium sand bed on 200mm thk bound gnaular /granular base course including cost of sand for sand bed but excluding cost of base course & subgrade preparation.) i) Grey
Hire and labour charges for shuttering with centering and necessary staging upto 4 m using approved stout props and thick hard wood planks of approved thickness with required bracing for concrete slabs, beams and columns, lintels curved or straight including fitting, fixing and striking out after completion of works (upto roof of ground floor)
Display Board (1.5" MS Pipe 6 ft. long, 6mm GI Sheet 2.5 ft. x 1.5 ft.) including writing, fitting, fixing with carring all other charges completed. ( L.S.)
Add GST @ 18 % on Total of Sl. 1.00 to Sl. 04.00
Add Labour welfare cess @ 1 % on Total of Sl.1.00 to Sl. 5
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.92 MB
BOQ_2421013.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid