Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.9 LAccepted-AOC | L1 | Accepted-AOC low price | |
| 2 | L2₹2.9 L+₹243.91 (0.09%)Rejected-Finance | L2 | Rejected-Finance high price |
| Sl No | Description | Qty | Unit | Nisathkhan L1 | M. HAPEEP RAHMAN L2 |
|---|---|---|---|---|---|
| 1.00Construction of Rcc Pipe Drainage at Ammapattinam Vadakku Theru Kadarkarai Nattamai Veethi to Vari in Ammapattinam Panchayat | |||||
| 2.00 | Earth work exacavation and depositing on bank with initial lead and lift in cll clauses of soils such as as per S.S.20B for narrow foundation etc. complete. | 71.6 | Cum | 263 ₹18,830.8 Lowest | 263.78 ₹18,886.65 |
| 3.00 | Supplying and Filling with M.Sand including cost and conveyance of all materials to site including all labour charges for filling etc complete. | 9.85 | Cum | 2,325 ₹22,901.25 Lowest | 2,325.99 ₹22,911 |
| 4.00 | Cement Concrete 1:4:8 mix using 40mm ISS HBG metal including cost and conveyance of all materials to site etc complete. | 0.85 | Cum | 6,135 ₹5,214.75 Lowest | 6,135.63 ₹5,215.29 |
| 5.00 | Supply and Delivery of Rcc NP3 Pipe 300mm dia including cost and Conveyance of all materials to site and all labour Charges etc | 80 | Rm | 1,076 ₹86,080 Lowest | 1,076.2 ₹86,096 |
| 6.00 | Lowering RCC pipes into the trenches and laying to proper grade and alignment etc ointing RCC pipes with cement using necessary collars including the cost of jointing materials | 40 | Nos | 62 ₹2,480 Lowest | 62.3 ₹2,492 |
| 7.00 | Supplying and errecting centering charges for sides and soffits of all R.c.c works including all labour charges etc complete | 56.07 | Sqm | 1,094 ₹61,340.58 Lowest | 1,095 ₹61,396.65 |
| 8.00 | Cement Concrete 1:2:4 mix using 20mm HBG metal including cost and conveyance of all materials to site including all labour charges for filling etc complete. | 3.78 | Cum | 7,430 ₹28,085.4 Lowest | 7,430.26 ₹28,086.38 |
| 9.00 | Supplying and fabrication of steel including cost and conveyance of steel to site and all labour charges for straightening, cutting to length,bending to shape and tying in position and forming grills for all R.C.C works | 0.05 | Mt | 91,880 ₹4,777.76 Lowest | 91,880.6 ₹4,777.79 |
| 10.00 | Reinforced cement concrete 1:1.5:3 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc complete | 1.01 | Cum | 9,752 ₹9,849.52 Lowest | 9,752.4 ₹9,849.92 |
Tender Value
₹2.9 L
EMD Value
₹2,900
Closing Date
18 Nov 2025, 3:00 pmClosed
BDO
PT OFFICE AMMAPATTINAM
Construction of Rcc Pipe Drainage at Ammapattinam Vadakku Theru Kadarkarai Nattamai Veethi to Vari in Ammapattinam Panchayat
2025_RDTN_623062_1
Pt Fund No-01 Work Of Pipe Drainage In Ammapattinam Vadakku Theru Ammapattinam Panchayat
Open Tender
Civil Works - Others
Works
AMMAPATTIANAM
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹2,900
Yes
27 Dec 2025
13 Nov 2025
18 Nov 2025
13 Nov 2025
18 Nov 2025
13 Nov 2025
Amount
Construction of Rcc Pipe Drainage at Ammapattinam Vadakku Theru Kadarkarai Nattamai Veethi to Vari in Ammapattinam Panchayat
Earth work exacavation and depositing on bank with initial lead and lift in cll clauses of soils such as as per S.S.20B for narrow foundation etc. complete.
Supplying and Filling with M.Sand including cost and conveyance of all materials to site including all labour charges for filling etc complete.
Cement Concrete 1:4:8 mix using 40mm ISS HBG metal including cost and conveyance of all materials to site etc complete.
Supply and Delivery of Rcc NP3 Pipe 300mm dia including cost and Conveyance of all materials to site and all labour Charges etc
Lowering RCC pipes into the trenches and laying to proper grade and alignment etc ointing RCC pipes with cement using necessary collars including the cost of jointing materials
Supplying and errecting centering charges for sides and soffits of all R.c.c works including all labour charges etc complete
Cement Concrete 1:2:4 mix using 20mm HBG metal including cost and conveyance of all materials to site including all labour charges for filling etc complete.
Supplying and fabrication of steel including cost and conveyance of steel to site and all labour charges for straightening, cutting to length,bending to shape and tying in position and forming grills for all R.C.C works
Reinforced cement concrete 1:1.5:3 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc complete
Refilling with excavated earth including all labour charges etc complete
GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package}(Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD)
M. HAPEEP RAHMAN (BID ID -1513973)
stage.html
html • 0.04 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.26 MB
BOQ_745035.xls
BOQ • 0.24 MB
TECH_BIT.pdf
Tender Documents • 0.47 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .