| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L2₹3.5 Cr+₹5.8 L (1.67%)Accepted-AOC | L2 | Accepted-AOC OK | |
| 2 | L1₹3.5 CrRejected-Finance | L1 | Rejected-Finance REJECTED | |
| 3 | Rejected-Technical | - | Rejected-Technical 4.1.1 | |
| 4 | Rejected-Technical | - | Rejected-Technical 4.4A(a), 4.6, 4.4B(b)(ii) | |
| 5 | Rejected-Technical AT NEAR GAYTRI MANDIR AKHARAGHAT NAZIPUR PO SHEKHPUR P S AHIYAPUR DISTT MUZAFFARPUR BIHAR 842001 | MUZAFFARPUR | BIHAR | 842001 | - | Rejected-Technical 4.1.1 |
| Sl No | Description | Qty | Unit | Md. Yasin Construction Pvt. Ltd L2 | Daisy World Infrastructure L1 |
|---|---|---|---|---|---|
| 1.00Details | |||||
| 2.00 | SUB HEAD : PREPARATORY WORKS ,SITE CLEARANCE , DISMANTLING Setting Out Pillars Providing & Fixing of Working benchmark Pillars 01 nos. per km & 04 Nos. of reference pillars required for 1 Km. as per drawings given and direction of E/I | 4 | km | 17,585.15 ₹70,340.6 | 17,409.3 ₹69,637.2 Lowest |
| 3.00 | Clearing and Grubbing Road Land ( By manual means) including uprooting wild vegetation , grass ,bushes ,shrubs , saplings and trees of girth upto 300mm , removals of stumps of such trees cut earlier & disposal of unserviceable materials & stacking of serviceable materials to be used or auctioned upto a lead of 1000 m including removal and disposal of top organic soil not exeeding 150mm in thickness as per technical specification - clause 201.1 and direction of E/I | 1.6 | HA | 41,943.45 ₹67,109.52 | 41,524.02 ₹66,438.43 Lowest |
| 4.00 | SUB HEAD : EARTHWORK Compacting original ground Compacting original ground supporting subgrade : Loosening of the ground upto level of 300mm below the subgrade level, watered, graded and compacted in layers to meet requirement of Table 300.1 and 300.2 for sub grade construction as per Technical Specification Clause 303.5.2 | 4,826.18 | m3 | 22.38 ₹1,08,009.91 | 22.16 ₹1,06,948.15 Lowest |
| 5.00 | SUB HEAD : EARTHWORK Excavation in Soil using Hydraulic Excavator and Tippers with disposal upto 1000 m Excavation in cutting in soil by manual means with lead upto 50m Excavation for roadway in soil using manual means for carrying of cut earth to embankment side with a left upto 1.5m and lead upto 50m as per Technical Specification clause 302.3. | 7,473.9 | m3 | 65.95 ₹4,92,903.71 | 65.29 ₹4,87,970.93 Lowest |
| 6.00 | SUB HEAD : EARTHWORK Construction of Embankment with Material Obtained from Borrow Pits Construction of embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 with a lead upto 250m as per Technical Specification Clause 301.5 (1) 20% of total Qty (Free Lead) | 3,890.49 | m3 | 122.34 ₹4,75,962.55 | 121.12 ₹4,71,216.15 Lowest |
| 7.00 | SUB HEAD : EARTHWORK Construction of Embankment with Material Obtained from Borrow Pits Construction of embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 with a lead upto 250m as per Technical Specification Clause 301.5 (2) 30% of total Qty (Lead upto 250m | 5,835.73 | m3 | 161.73 ₹9,43,812.61 | 160.11 ₹9,34,358.73 Lowest |
| 8.00 | Construction of Subgrade and Earthen Shoulders Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 as per Technical Specification Clause 303.1. (50% of qty) (Lead upto 750-1000m)) | 9,726.22 | cum | 279.91 ₹27,22,466.24 | 277.11 ₹26,95,232.82 Lowest |
| 9.00 | WATERPROOFING WITH NANOTECHNOLOGY : Waterproofing on top of the sub Grade soil base/Earthen Shoulder with Nano technology based "Terrasil" Organo silane nanotechnology & "Zycobond" nano acrylic co-polymer with water (<1000 ppm TDS) in the ratio of 1:1:200 @ 3 ltrs/sqm as per direction of the Engineer-in-charge. (IRC accreditation of Terrasil is : IRC-24(7)/2017 (ACC-224) and Zycobond is : IRC-24(7)/2017 (ACC-225)) | 27,953.87 | cum | 13.59 ₹3,79,893.09 | 13.45 ₹3,75,979.55 Lowest |
| 10.00 | Gravel/Soil-Aggregate Surface Course (Table 400.3) - Construction of granular surface course by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with three wheel 80-100 kN static roller capacity to achieve the desired density, complete as per Technical Specification Clause 402. | 796.4 | cum | 623.61 ₹4,96,643 | 617.37 ₹4,91,673.47 Lowest |
Tender Value
₹3.6 Cr
EMD Value
₹3.5 L
Closing Date
16 Dec 2021, 5:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
CHIEF ENGINEER, JSRRDA
3RD FLOOR FFP BUILDING DHURWA, RANCHI JHARKHAND 834004
Construction and Maintenance of Roads under PMGSY (RCPLWEA) Scheme
2021_CEJHR_114845_49
e-Tender No.- 01 /2021 RCPLWEA
Open Tender
Civil - Roads and Bridges
Item Rate
275 days
SIMDEGA
Please refer Tender documents.
4 documents required · 4 mandatory
₹10,000
₹3.5 L
30 Jun 2022
24 Nov 2021
17 Dec 2021
24 Nov 2021
16 Dec 2021
24 Nov 2021
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Details | - | - | - | - |
| 2 | SUB HEAD : PREPARATORY WORKS ,SITE CLEARANCE , DISMANTLING Setting Out Pillars Providing & Fixing of Working benchmark Pillars 01 nos. per km & 04 Nos. of reference pillars required for 1 Km. as per drawings given and direction of E/I | 4 | km | 17,585.15 | ₹70,340.6 |
| 3 | Clearing and Grubbing Road Land ( By manual means) including uprooting wild vegetation , grass ,bushes ,shrubs , saplings and trees of girth upto 300mm , removals of stumps of such trees cut earlier & disposal of unserviceable materials & stacking of serviceable materials to be used or auctioned upto a lead of 1000 m including removal and disposal of top organic soil not exeeding 150mm in thickness as per technical specification - clause 201.1 and direction of E/I | 1.6 | HA | 41,943.45 | ₹67,109.52 |
| 4 | SUB HEAD : EARTHWORK Compacting original ground Compacting original ground supporting subgrade : Loosening of the ground upto level of 300mm below the subgrade level, watered, graded and compacted in layers to meet requirement of Table 300.1 and 300.2 for sub grade construction as per Technical Specification Clause 303.5.2 | 4,826.18 | m3 | 22.38 | ₹1,08,009.91 |
| 5 | SUB HEAD : EARTHWORK Excavation in Soil using Hydraulic Excavator and Tippers with disposal upto 1000 m Excavation in cutting in soil by manual means with lead upto 50m Excavation for roadway in soil using manual means for carrying of cut earth to embankment side with a left upto 1.5m and lead upto 50m as per Technical Specification clause 302.3. | 7,473.9 | m3 | 65.95 | ₹4,92,903.71 |
| 6 | SUB HEAD : EARTHWORK Construction of Embankment with Material Obtained from Borrow Pits Construction of embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 with a lead upto 250m as per Technical Specification Clause 301.5 (1) 20% of total Qty (Free Lead) | 3,890.49 | m3 | 122.34 | ₹4,75,962.55 |
| 7 | SUB HEAD : EARTHWORK Construction of Embankment with Material Obtained from Borrow Pits Construction of embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 with a lead upto 250m as per Technical Specification Clause 301.5 (2) 30% of total Qty (Lead upto 250m | 5,835.73 | m3 | 161.73 | ₹9,43,812.61 |
| 8 | Construction of Subgrade and Earthen Shoulders Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 as per Technical Specification Clause 303.1. (50% of qty) (Lead upto 750-1000m)) | 9,726.22 | cum | 279.91 | ₹27,22,466.24 |
| 9 | WATERPROOFING WITH NANOTECHNOLOGY : Waterproofing on top of the sub Grade soil base/Earthen Shoulder with Nano technology based "Terrasil" Organo silane nanotechnology & "Zycobond" nano acrylic co-polymer with water (<1000 ppm TDS) in the ratio of 1:1:200 @ 3 ltrs/sqm as per direction of the Engineer-in-charge. (IRC accreditation of Terrasil is : IRC-24(7)/2017 (ACC-224) and Zycobond is : IRC-24(7)/2017 (ACC-225)) | 27,953.87 | cum | 13.59 | ₹3,79,893.09 |
| 10 | Gravel/Soil-Aggregate Surface Course (Table 400.3) - Construction of granular surface course by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with three wheel 80-100 kN static roller capacity to achieve the desired density, complete as per Technical Specification Clause 402. | 796.4 | cum | 623.61 | ₹4,96,643 |
stage.html
html • 0.07 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
Tender Document • 9.99 MB
CorrNIT01.PDF
Tender Document • 1.64 MB
ExtofDateNIT01.PDF
Tender Document • 1.64 MB
JH-LWE-SIM-02_21-22.pdf
Tender Document • 4.58 MB
BOQ_184628.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .