Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹6.0 LAccepted-AOC 00 MUKUNDPUR PAHO DOMANPUR MUKUNDPUR PAHO MIRZAPUR UTTAR PRADESH 231306 | MIRZAPUR | UTTAR PRADESH | 231306 | L1 | Accepted-AOC Accepted as L1 as per NIT | |
| 2 | Rejected-Technical AT ARGADA DISTT RAMGARH JHARKHAND | - | Rejected-Technical Not accepted as per NIT | |
| 3 | Rejected-Technical KUJU DIST RAMGARH | KUJU | RAMGARH | - | Rejected-Technical Not accepted as per NIT |
Tender Value
₹5.5 L
EMD Value
₹7,000
Closing Date
7 Feb 2025, 4:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Colliery Manager (M), Manager(F), Project Engineer
Project Engineer (EnM), Kathara Colliery
(A) Repairing, Rewinding and maintenance of 01 no 180KW, 3.3KV, Make-Marathon, SI. No. Missing Induction motor of Kathara Colliery under Kathara area. (B) Repairing, Rewinding and maintenance of 01 No 125 KW, 3.3KV, Make- Marathon, SI.No. Missing Ind
2025_CCL_327043_1
KTC/PE/EnM/24-25/205 Date-27.01.2025
Open Tender
Electrical and Maintenance Works
Item Rate
15 days
Office of the Project Officer, PE (EnM), Kathara C
(A) Repairing, Rewinding and maintenance of 01 no 180KW, 3.3KV, Make-Marathon, SI. No. Missing Induction motor of Kathara Colliery under Kathara area. (B) Repairing, Rewinding and maintenance of 01 No 125 KW, 3.3KV, Make- Marathon, SI.No. Missing Ind
6 documents required · 6 mandatory
₹7,000
Yes
6 Mar 2025
27 Jan 2025
8 Feb 2025
28 Jan 2025
7 Feb 2025
28 Jan 2025
28 Jan 2025 - 4 Feb 2025
Amount
A. Repairing, Rewinding and maintenance of 01 no 180KW, 3.3KV, Make-Marathon, SI. No. Missing Induction motor of Kathara Colliery under Kathara area. (put zero against this row in rate column)
Cost of DGC Copper Strip 5x2 mm= 1016.94x2.40 kg = 2440.65
Cost of Moulding of one coil with Craption, nomax and mica
Insulation cost
Labour cost
Dala Housing Welding and machining to bearing size
Cost of Bushing with studs
B. Repairing, Rewinding and maintenance of 01 No 125 KW, 3.3KV, Make- Marathon, SI.No. Missing Induction motor of Kathara Colliery under Kathara Area. (put zero against this row in rate column)
Cost of DGC Copper Strip 5x2 mm= 1016.94x1.60 kg = 1627.10
Cost of Moulding of one coil with Craption, nomax and mica
Insulation cost
Labour charges
|Cost of bushing with studs
Total impact of GST for the purpose of CTC
technical_338983.pdf
PDF • 0.19 MB
techsummary_338983.pdf
PDF • 1.02 MB
finance_338983.pdf
PDF • 0.18 MB
BOQ Comparative Chart
xlsx • 0.01 MB
finsummary_338983.pdf
PDF • 0.83 MB
LOA_NIT_205.pdf
PDF • 0.71 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .