Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.7 LAccepted-Finance | ₹3.7 L | L1 | Accepted-Finance Lowest Bid Value |
| 2 | L2₹3.8 L+₹3,759.47 (1.01%)Rejected-Finance N A | ₹3.8 L+₹3,759.47 (1.01%) | L2 | Rejected-Finance Higher Bid Value |
| 3 | L3₹3.8 L+₹3,797.06 (1.02%)Rejected-Finance | ₹3.8 L+₹3,797.06 (1.02%) | L3 | Rejected-Finance Higher Bid Value |
| 4 | L3₹3.8 L+₹3,797.06 (1.02%)Rejected-Finance | ₹3.8 L+₹3,797.06 (1.02%) | L3 | Rejected-Finance Higher Bid Value |
Tender Value
₹3.8 L
EMD Value
₹7,519
Closing Date
16 Dec 2025, 12:20 pmClosed
EXECUTIVE OFFICER, TIA,DHUPGURI MUNICIPALITY
EXECUTIVE OFFICER, DHUPGURI MUNICIPALITY
Land Land Development and Floor Repairing of Uttar Boragari Spl. Carre Pry. School in ward no.- 09, Booth no- 191 in APAS, under Dhupguri Municipality. ( Sl no.-1)
2025_MAD_954385_1
WBMAD/DHUPGURI/65/2025-26
Open Tender
CIVIL WORKS
Percentage
45 days
DHUPGURI MUNICIPALITY
Please refer Tender documents.
3 documents required · 3 mandatory
₹1,000
₹7,519
21 May 2026
20 Nov 2025
18 Dec 2025
20 Nov 2025
16 Dec 2025
20 Nov 2025
Earth work in excavation of foundation trenches or drains in all sorts of soil (including mixed soil but excluding laterite or sandstone) including removing spreading or stacking the spoils within a lead of 75 m. as directed. The item includes necessary trimming the sides of trenches. levelling dressing and ramming the bottom. bailing out water as required complete. (a) Depth of excavation not exceeding 1500 mm.
Ordinary Cement concrete (mix 1:2:4) with graded stone chips (20 mm nominal size) excluding shuttering and reinforcement ,if any, in ground floor as per relevant IS codes. (b) River bazree.
Plaster (to wall, floor, celling etc.) with sand and cement mortar including rounding off or chamfe-ring corners as directed and raking out joints or roughening of concrete surface. Including throating. nosing and drip course where necessary (ground floor) (i) With (4:1) cement mortar a) 10mm.thick plaster
Neat cement punning about 1.5mm th in wall dado etc. window sills, floor, drain etc. Note : Cement 0.152 cu.m. per 100 Sq.m.
Add GST @18%
Add Labour Welfare Cess @1%
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 1.32 MB
Tendernotice_2.pdf
PDF • 0.20 MB
BOQ_2287133.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .