Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.1 LAccepted-AOC | ₹4.1 L Quoted ₹3.9 L | L1 | Accepted-AOC accepted |
| 2 | Rejected-Technical | - | - | Rejected-Technical L2 |
| Sl No | Description | Qty | Unit | M JEGAN L2 | ANUSHIA PAVER BLOCKS L1 |
|---|---|---|---|---|---|
| 1.00Name of Work: Desilting of Pillaiyar Kovil Oorani and Construction of Step at Kattunedunkulam Village and Panchayat | |||||
| 2.00 | Clearing light jungles and clearing away carefully and burning it including all labour charges etc. (Annexure III - A2) | 90 | sqm | 7 ₹630 | 6 ₹540 Lowest |
| 3.00 | Earth work in all soils except hard rock requiring blasting
and conveying for formation of bund with lead of 0 to 100
metre deploying earth moving machinery and tippers
including benching, formation of bunds, breaking clods,
sectioning etc., complete (pg no : 32) PWD Schedule of rates | 4,345 | cum | 53 ₹2,30,285 | 52 ₹2,25,940 Lowest |
| 4.00 | Earth work excavating and depositing on bank with an initial lead of 10M and initial lift of 2m in hard stiff clay stiff block cotton, hard red earth shale's, murrams, gravel, stoney earth and earth mixed with small size boulders and hard gravelly soil SS 20B for foundation | 15.6 | cum | 225 ₹3,510 | 224 ₹3,494.4 Lowest |
| 5.00 | Cement concrete 1:4:8 using 40mm HBGS jelly including all incidental charges such as bailing out water finishing curing complete complying with standard specification | 3.3 | cum | 5,620 ₹18,546 | 5,619 ₹18,542.7 Lowest |
| 6.00 | Providing Centering charges for C.C works including material all labour charges etc.,completed. | 31.88 | sqm | 477 ₹15,204.38 | 476 ₹15,172.5 Lowest |
| 7.00 | Cement concrete 1:3:6 using 40mm HBGS jelly including all incidental charges such as bailing out water finishing curing complete complying with standard specification | 7.02 | cum | 5,949 ₹41,761.98 | 5,948 ₹41,754.96 Lowest |
| 8.00 | Cement concrete 1:2:4 using 20mm HBGS jelly including all incidental charges such as bailing out water finishing curing complete complying with standard specification | 3.21 | cum | 6,985 ₹22,421.85 | 6,984 ₹22,418.64 Lowest |
| 9.00 | GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package} | 1 | GST Amount (in Rupees) | 59,825 ₹59,825 | 59,015 ₹59,015 Lowest |
Tender Value
₹4 L
EMD Value
₹4,000
Closing Date
8 Mar 2024, 3:00 pmClosed
Block Development Officer v.p SIVAGANGAI
UNION OFFICE SIVAGANGAI
Desilting of Pillaiyar Kovil Oorani and Construction of Step at Kattunedunkulam Village and Panchayat
2024_RDTN_439140_1
SVG-Desilting of Pillaiyar Kovil Oorani and Construction of Step at Kattunedunkulam Village and Pa
Open Tender
Civil Works
Item Rate
180 days
UNION OFFICE SIVAGANGAI
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹4,000
7 Sept 2026
5 Mar 2024
8 Mar 2024
5 Mar 2024
8 Mar 2024
5 Mar 2024
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .