Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹14.6 CrAccepted-AOC PATHARGAMA GODDA | PATHARGAMA | GODDA | JHARKHAND | ₹14.6 Cr | L1 | Accepted-AOC L1 Letter No. 574(S)WE Date-07.02.2025 |
| 2 | L2₹16.3 Cr+₹1.7 Cr (11.7%)Rejected-Finance BEHIND HERO HONDA SHOWROOM DUDHANI BHAGALPUR ROAD DUMKA | DUMKA | JHARKHAND | 814101 | ₹16.3 Cr+₹1.7 Cr (11.7%) | L2 | Rejected-Finance L2 Letter No. 574(S)WE Date-07.02.2025 |
| 3 | Rejected-Technical 1734 SECTOR 21 PANCHKULA 134112 HARYANA | PANCHKULA | HARYANA | 134112 | - | - | Rejected-Technical Non Responsive |
| 4 | Rejected-Technical TARANGINI VILLA MAIN ROAD BHAGAT PARA PAKUR | - | - | Rejected-Technical Non Responsive |
| 5 | Rejected-Technical | - | - | Rejected-Technical Non Responsive |
Tender Value
₹15.5 Cr
EMD Value
₹15.5 L
Closing Date
4 Jul 2024, 12:00 pmClosed
Executive Engineer, RCD, Road Division, Sahibganj
Executive Engineer, RCD, Road Division, Sahibganj
Improvement of Riding Quality Work of Part A Jojodari to Mohabbatpur Road from KM 0.00 to 16.130 and Part B Barhait-Lalmatia via Bhognadih Road from KM 0.00 to 7.904 KM (Total Length-24.034 KM) under Road Division, Sahibganj
2024_CECOM_86416_1
RCD/SAHIBGANJ/423/2024-25
Open Tender
Civil Works
Item Rate
180 days
JOJODARI TO MOHABBATPUR AND BARHAIT LALMATIA
Please refer Tender documents.
3 documents required · 3 mandatory
₹10,000
₹15.5 L
25 Apr 2025
14 Jun 2024
5 Jul 2024
14 Jun 2024
4 Jul 2024
14 Jun 2024
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, sapling and tress girth upto 300 mm, removal of stumps of tree cut earlier and disposal of unserviceable materials and stacking of sericeable material to be used of auctioned, up to a lead of 1000 metres including removal and disposal of top organic soil not exceeding 150mm in thickness. By Mechanical means using dozer RCDSOR 2.03 (ii) A | - | Hect. | 88,499.5 | - |
| 2 | Scarifying the existing bituminous surface to a depth of 50 mm and disposal of scarified material within all the lifts and leads upto 1000 meters. RCDSOR 3.15 (1) | 1 | Sqm | 4.8 | ₹4.8 |
| 3 | Construction of sub-grade and earthen shoulders with approved material obtained from Borrow pits with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of Table 300-2. RCDSOR 3.18 | 1 | Cum | 131.3 | ₹131.29 |
| 4 | Dismantling of flexible pavements (Dismantling of flexible pavements and disposal of dismantled materials upto a lead of 1000 metres, stacking serviceable and unserviceable materials separately). RCDSOR 2.05 (ii) A | - | Cum | 234 | - |
| 5 | Dismantling flexible pavements (Dismantling of flexible pavements and disposal of dismantled materials upto a lead of 1000 meters, stacking serviceable and unservieable materials separately). RCDSOR 2.05 (i) B | - | Cum | 38.9 | - |
| 6 | Dismantling of cement concrete pavement by mechanical means using pnematictools, breaking to pieces not exceeding 0.02 cum in volume and stock pilling at designated locations and disposal of dismantled materials upto a lead of 1000 meters, stacking serviceable and un-servieable materials separately. RCDSOR 2.06 | 1 | Cum | 442.6 | ₹442.56 |
| 7 | Excavation for road work in soil with hydraulic excavator including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and transporting to the embankment locations within all lifts and leads upto 1000m. RCDSOR 3.06 | 1 | Cum | 62.4 | ₹62.39 |
| 8 | Construction of granular sub-base by providing close graded material, spreading in uniform layers with motor grader on prepapred surface, mixing by mix in place method with front end loader at OMC, and compacting with vibratory roller to achieve the desired density, complete as per clause 401. RCDSOR 4.01 G.S.B. V | 1 | Cum | 2,016.83 | ₹2,016.63 |
| 9 | (A) Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mix plant carriage of mixed material by tipper to site, laying in uniform layers with grader in sub-base/base course on well prepared surface and compacting with vibratory roller to achieve the desired density. RCDSOR 4.14 B | - | Cum | 2,258.16 | - |
| 10 | (B) Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in the mechanical mix plant carriage of mixed material by tipper to site, laying in uniform layers with grader in sub-base course on well prepared surface and compacting with vibratory roller to achieve the destined density. RCDSOR 4.14 B | - | Cum | 2,279.69 | - |
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
BOQ_116226.xls
BOQ Document • 0.31 MB
146284509.pdf
Tender Document • 0.47 MB
SBD423.pdf
Tender Document • 4.07 MB
146284513.html
Tender Document • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .