Superintending Engineer TEDC Tuticorin
131, 132, Ettayapuram Road, Tuticorin
Execution of works under RDSS scheme for Agriculture Feeder Segregation (FY 2022 -2023) in 11KV Sivanthipatti feeder of 33/11KV Srivaikundam SS in Seidunganallur section of Rural / Tuticorin division of Tuticorin Electricity Distribution Circle
2022_EB_233036_2
WC-003/2022-2023 SIVNTHIPATTI FEEDER SDNR
Open Tender
Electrical Works
Item Rate
120 days
Tuticorin
Refer tender document
2 documents required · 2 mandatory
₹0
₹46,500
Yes
9 Jun 2022
27 May 2022
4 Jun 2022
27 May 2022
3 Jun 2022
27 May 2022
27 May 2022 - 3 Jun 2022
Amount
Excavation of Stay pit 4.5' to 5' depth by using JCB or manual
Excavation of pole pit upto 8 mtr PSC poles by using JCB or manual
Excavation of pole pit upto 9.14 mtr Pole by using JCB or manual
Excavation of RSJ pole pit above 36' by using JCB or manual
Erection of 8 mtr PSC poles by using JCB or maual
Erection of 9 mtr PSC poles by using JCB or maual
Erection of RSJ Rail, fabricated poles above 36'-0' by using JCB or maual
Erection of stay set complete
Fixing of 3.6" "V" cross arms(all types) / channel cross arms/ guarding Cross arms
Tapping X arm
Fixing of LT 3 phase cross arms
Fixing of LT Single phase cross arms
Fixing of HT/LT TI Fittings
Fixing of pin Insulators with Pin 11 KV
Fixing of 11 KV strain disc.
Fixing of LT pin Insulator with pin
Fixing of LT shackle
Fixing of Aluminium Knob
Earthing of pole with pin including burying looping and binding
Paving of Conductor, stringing, binding Jumpering etc., complete with 7/4.09ACSR for both HT/LT lines with LC work.
Paving of Conductor, stringing, binding Jumpering etc., complete with 7/4.09ACSR for both HT/LT lines without LC work.
Paving of Conductor, stringing, binding Jumpering etc., complete with7/3.35 mm ACSR for both HT/LT lines with LC work.
Paving of Conductor, stringing, binding Jumpering etc., complete with7/3.35 mm ACSR for both HT/LT lines without LC work.
Paving of Conductor, stringing, binding Jumpering etc., complete with7/2.59 mm ACSR for both HT/LT lines with LC work.
Paving of Conductor, stringing, binding Jumpering etc., complete with7/2.59 mm ACSR for both HT/LT lines without LC work.
Concreting of Poles as per Board standards (2*2*5). The material such as sand, jelly, etc., have to be supplied by contractor including Cement supplied by Contractor (Cement concrete mix 1:4:8 using 40mm hard broken stone including cost of labour Charges for placing Transporting of Sand, jally, from box and water curing etc,. complete as per field Engineer's instructions.
Erection of Single Pole Transformer structure complete in all respects with wiring Earthing, fixing of open type fuse units, HT/LT/LAS and jumpering 3 Nos. Earth pits with tubs including painting of metal parts, structure poles, fixing of top channel seating channel, belting angle (Except erection of Transformer)
Erection of Single Pole Transformer structure complete in all respects with wiring Earthing, fixing of open type fuse units, HT/LT/LAS and jumpering 3 Nos. Earth pits with tubs including painting of metal parts, structure poles, fixing of top channel seating channel, belting angle (Except erection of Transformer)
Flat guarding arrangement 4wire
Transport of poles/Materials/ conductors and other materials from store to site ( for Hired Vehicle) beyond 20KM
Loading/Unloading of poles upto 8 mtr PSC poles
Loading/Unloading of poles upto 9 mtr PSC poles & RCC Square Pole
Loading/Unloading of poles above 42'-0' RSJ pole
Transporting of 8mt poles from road site to pole pit including loading and unloading of poles by using JCB or manual
Transporting of 9.0mt poles & 9.0mt RCC Square Pole from road site to pole pit including loading and unloading of poles by using JCB or manual
Transporting of poles above 42'-0' RSJ polefrom road site to pole pit including loading and unloading of poles by using JCB or manual
Transporting of Distribution Transformer beyond 20 KM
Loading or unloading of Transformer upto 63 KVA for each
Loading or unloading of Transformer upto 25 KVA for each
Erection of New Transformer upto 63 KVA
Erection of New Transformer upto 25 KVA
Erection of D.P. structure with AB switch top channel, cross bracing, HG fuse set, earthing, painting, providing stay and pole concreting as per field Engineer's instructions.
Alteration of Back clamp
Painting & Numbering of poles
Aluminium painting including labour,materials,lead,lift etc., for all types of x arm/channel/clamps/Bolt & Nut Etc., for above works
E.P.F. @13 % should be Entered by the Bidder
E.S.I. @3.25 % should be Entered by the Bidder
G.S.T. @18% should be Entered by the Bidder
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .