Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹6.6 LAdmitted-Finance | -30.10% | ₹6.6 L | L1 | Admitted-Finance |
| 2 | L2₹6.8 LAdmitted-Finance | -28.33% | ₹6.8 L | L2 | Admitted-Finance |
| 3 | L3₹7.1 LAdmitted-Finance | -25.00% | ₹7.1 L | L3 | Admitted-Finance |
| 4 | L4₹7.7 LAdmitted-Finance | -18.50% | ₹7.7 L | L4 | Admitted-Finance |
| 5 | L5₹7.9 LAdmitted-Finance | -16.40% | ₹7.9 L | L5 | Admitted-Finance |
Tender Value
₹9.5 L
EMD Value
₹18,960
Closing Date
4 May 2026, 4:00 pmClosed
Executive Engineer PWD Division Poonch
Executive Engineer PWD Division Poonch
Construction of Boys Toilet 2.37 Lacs Sub.Division Mandi,Division Poonch Under PAB 2025-26 1.GMS Chella 2.GMS Rajpura Left 3.Primary School Lapara 4.Primary School Aartrang
2026_PWDJK_308410_4
e-NIT No.4/2026-27 dated 22-04-2026
Open Tender
Civil Works
30 days
Poonch
Please refer Tender documents.
3 documents required · 3 mandatory
₹600
Yes
Executive Engineer PWD Division Poonch
₹18,960
Yes
14 May 2026
22 Apr 2026
5 May 2026
22 Apr 2026
4 May 2026
22 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Earth work in excavation by mechanical means (hydraulic excavator) in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts,wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed, within a lead of 50 metres: All kinds of soil : | |||||
| 2Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering- All work upto plinth level.1:5:10 (1 cement: 5 coarse sand: 10 graded stone aggregate 40mm nominal size) | |||||
| 3Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering .All work up to plinth level with :1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) | |||||
| 4Brick work with common burnt clay (non-modular) bricks of class designation 7.5 in foundation/plinth & superstructure above plinth level upto floor five level including curing in : Cement mortar 1:6 ( 1 cement : 6 coarse sand) | |||||
| 5Reinforced cement concrete work in beams, suspended floors, roofs having slope upto 15°,landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases upto five level including curing but excluding the cost of centring, shuttering, finishing and reinforcement with. 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) | |||||
| 6Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete Thermo-Mechanically Treated bars of grade Fe-500D or more. | |||||
| 7Centering and shuttering including strutting, propping etc. and removal of form for: | |||||
| 7.01 | Foundations, footings, bases of columns etc. for mass concrete. | - | Sqm | - | - |
| 7.02 | Suspended floors, roofs, landings, balconies and access platforms. | - | Sqm | - | - |
| 7.03 | Edges of slabs and breaks in floors and walls
Under 20 cm wide | - | Meter | - | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.83 MB
Tendernotice_2.pdf
PDF • 0.89 MB
BOQ_999515.xls
BOQ • 0.36 MB
Download all tender documents and submit your bid