Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹14.1 LAdmitted-Finance | L1 | Admitted-Finance | |
| 2 | L2₹14.2 L+₹1,416 (0.10%)Admitted-Finance | L2 | Admitted-Finance |
| Sl No | Description | Qty | Unit | M M Engineers L2 | M/s AADRIKA ASSOCIATES L1 |
|---|---|---|---|---|---|
| 1.01 | Transformer No.01 (JN13579/2). Disconnecting of HT supply from main panel after switching off 11 KV VCB discharging the supply. Complete drain out of transformer oil from transformer into empty oil drum by oil machine, dismantling of conservator tank and all protection relays, cable end boxes, vent pipes and other items as required. | 1 | Job | 31,800 ₹37,524 | 31,700 ₹37,406 Lowest |
| 1.02 | Cleaning of transformer oil tank and removing of sludge settled in the bottom with the help of vacuum pressure cleaning machine thoroughly, cleaning of core and winding of transformer with hot oil and proper safety precaution to prevent the winding damage as required, cutting of old overheated insulation of winding and reinsulation of weak point with the help of HT insulation material and proper taping etc. | 1 | Job | 2,09,000 ₹2,46,620 Lowest | 2,09,000 ₹2,46,620 Lowest |
| 1.03 | Replacement of HV bushing with the help of skilled and trained labor with all tools and tackles etc as per site requirement. | 1 | Set | 59,000 ₹69,620 Lowest | 59,000 ₹69,620 Lowest |
| 1.04 | Replacement of silica gel. | 1 | Job | 8,500 ₹10,030 Lowest | 8,500 ₹10,030 Lowest |
| 1.05 | Checking & matching of control wiring of all protection relays and calibration of bucchalz relay and protection relays testing the same. | 1 | Job | 43,500 ₹51,330 Lowest | 43,500 ₹51,330 Lowest |
| 1.06 | Complete assembling of transformer cleaning of complete transformer tightening of all connection of incoming and outgoing side and testing & checking of IR test with megger of winding & cable of both sides HI pot machine. Replacement of oil seals missing hardware to stop the oil leakage. | 1 | Job | 72,500 ₹85,550 | 72,000 ₹84,960 Lowest |
| 1.07 | Filling of transformer oil to up to top up level as required. Make - Transpower | 815 | Ltrs. | 1,05,950 ₹1,25,021 Lowest | 1,05,950 ₹1,25,021 Lowest |
| 1.08 | Repair of cooling fins for stopping the leakage. | 5 | Jobs | 41,825 ₹49,353.5 Lowest | 41,825 ₹49,353.5 Lowest |
| 1.09 | Dehydration & filtration of complete transformer oil and checking the die electric strength up to 50 KV at site. | 1 | Job | 35,000 ₹41,300 Lowest | 35,000 ₹41,300 Lowest |
| 1.10 | Complete cleaning and chemically washing of oily and muddy transformer body and painting of transformer with enamel paint. | 1 | Job | 35,000 ₹41,300 Lowest | 35,000 ₹41,300 Lowest |
Tender Value
Refer Docs
EMD Value
₹28,300
Closing Date
25 Jul 2025, 11:00 amClosed
Office of the Ex. Eng. (E and M) M-II
Pocket-A, Dilshad Garden, Delhi-110095
Renovation/servicing of VOLTAMP make 1250 KVA Transformer no.1 at Usmanpur BPS
2025_DJB_275741_7
NIT No. 08 (25-26)
Open Tender
Miscellaneous Works
Works
45 days
Usmanpur BPS
Please refer Tender documents.
3 documents required · 3 mandatory
₹500
Ac No. 50448339804
₹28,300
25 Sept 2025
19 Jul 2025
25 Jul 2025
19 Jul 2025
25 Jul 2025
19 Jul 2025
Transformer No.01 (JN13579/2). Disconnecting of HT supply from main panel after switching off 11 KV VCB discharging the supply. Complete drain out of transformer oil from transformer into empty oil drum by oil machine, dismantling of conservator tank and all protection relays, cable end boxes, vent pipes and other items as required.
Cleaning of transformer oil tank and removing of sludge settled in the bottom with the help of vacuum pressure cleaning machine thoroughly, cleaning of core and winding of transformer with hot oil and proper safety precaution to prevent the winding damage as required, cutting of old overheated insulation of winding and reinsulation of weak point with the help of HT insulation material and proper taping etc.
Replacement of HV bushing with the help of skilled and trained labor with all tools and tackles etc as per site requirement.
Replacement of silica gel.
Checking & matching of control wiring of all protection relays and calibration of bucchalz relay and protection relays testing the same.
Complete assembling of transformer cleaning of complete transformer tightening of all connection of incoming and outgoing side and testing & checking of IR test with megger of winding & cable of both sides HI pot machine. Replacement of oil seals missing hardware to stop the oil leakage.
Filling of transformer oil to up to top up level as required. Make - Transpower
Repair of cooling fins for stopping the leakage.
Dehydration & filtration of complete transformer oil and checking the die electric strength up to 50 KV at site.
Complete cleaning and chemically washing of oily and muddy transformer body and painting of transformer with enamel paint.
Transformer No.02 ( JN13579/1). Disconnecting of HT supply from main panel after switching off 11 KV VCB discharging the supply. Complete drain out of transformer oil from transformer into empty oil drum by oil machine, dismantling of conservator tank and all protection relays, cable end boxes, vent pipes and other items as required.
Cleaning of transformer oil tank and removing of sludge settled in the bottom with the help of vacuum pressure cleaning machine thoroughly, cleaning of core and winding of transformer with hot oil and proper safety precaution to prevent the winding damage as required, cutting of old overheated insulation of winding and reinsulation of weak point with the help of HT insulation material and proper taping etc.
Replacement of HV bushing with the help of skilled and trained labor with all tools and tackles etc as per site requirement.
Replacement of silica gel.
Checking & matching of control wiring of all protection relays and calibration of bucchalz relay and protection relays testing the same.
Complete assembling of transformer cleaning of complete transformer tightening of all connection of incoming and outgoing side and testing & checking of IR test with megger of winding & cable of both sides HI pot machine. Replacement of oil seals missing hardware to stop the oil leakage.
Filling of transformer oil to up to top up level as required. Make - Transpower
Repair of cooling fins for stopping the leakage.
Dehydration & filtration of complete transformer oil and checking the die electric strength up to 50 KV at site.
Complete cleaning and chemically washing of oily and muddy transformer body and painting of transformer with enamel paint.
M M Engineers (BID ID -1605464)
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .