| 1 | L1₹905 CrAccepted-AOC | ₹905 Cr Quoted ₹905.8 Cr | L1 | Accepted-AOC L1 |
| 2 | L2₹944.3 CrRejected-Finance NCC HOUSE MADHAPUR HYDERABAD 500081 TELANGANA INDIA TELEPHONE 040 23268730 | ₹944.3 Cr | L2 | Rejected-Finance 2ND LOWEST BID |
| 3 | Rejected-Technical | - | - | Rejected-Technical Responsive and Disqualified |
Tender Value
₹711.3 Cr
EMD Value
₹1 L
Closing Date
11 Jan 2023, 6:05 pmClosed
DIRECTOR WORKS
7TH FLOOR MMRDA BKC 400051
CONSTRUCTION OF DEPOT INFRASTRUCTURES COMPRISING STABLING YARD, OPERATIONAL LAND
2023_MMRDA_865367_1
MMRDA/MMRP/CA-160
Open Tender
Civil Works
1095 days
THANE
Please refer Tender documents.
7 documents required · 7 mandatory
₹11,800
₹1 L
4 Jun 2024
6 Jan 2023
13 Jan 2023
6 Jan 2023
11 Jan 2023
6 Jan 2023
Amount
MMRDA/MMRP/CA-160
Schedule A consists of RCC, Architectural Finishing, plumbing works of depot Infrastructures comprising, approach bridge, stabling yard, Compound wall, OCC and Administrative building, Maintenance and Inspection workshop buildings, ASS, Design & built ETP & STP etc.
Schedule B consists of earth work, excavation, embankment, back filling with contractors own good earth, filling of blanket material, disposal topographical survey, Road works & SWD works, utility ducts etc., geotechnical investigation, tree cutting, transplantation, new plantation, Landscaping etc. complete
Schedule-C Design, Fabrication, Supply and Erection of Pre-Engineered Steel Buildings.
Schedule-D Construction of Staff Quarters with 1BHK, 2BHK,3BHK each Single tower and Community Centre Building.
Schedule-E Construction of Approach Road Bridge
Schedule-F Earth work, excavation, embankment, back filling with contractors own good earth, filling of blanket material, Road works & SWD works, utility ducts etc. for the additional land area.
Schedule-G is lumpsum provision for the contingency work items not covered under schedule items. The Amount given for iv. Schedule-G is lumpsum provision for the contingency work items not covered under schedule items. The Amount given for Schedule “G” in Indian Rupees is for the contingency works not covered under Schedule-A, Schedule-B, Schedule-C, Schedule-D, Schedule-E and Schedule-F. All works under Schedule “G” of BOQ shall be paid based on prevailing PWD SSR 2021-22 (Govt. of Maharashtra, PWD) (Rates including 5% Corporation tax, 0.5% Labour Insurance and 18% GST) . In case of non-availability of rates in PWD SSR 2021-22 rates, the rates of MCGM unified schedule (2018) (Rates including 18% GST) shall be paid. All Overhead, Underground and HT line shifting and electrical utility shifting works if any shall be paid based on the latest schedule of rates / cost data sheet of MSEDCL. In case of non-availability of rates in MSEDCL cost data sheet, the rates of latest PWD Electrical DSR shall be paid. All the items shall be operated based on site requirement and only after obtaining prior approval of Employers representative.