Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.8 LAdmitted-Finance 1008 A PREMIER ENGINEERING COMPANY PURVI RITHANI MEERUT DELHI ROAD MEERUT UTTAR PRADESH 250103 INDIA | MEERUT | UTTAR PRADESH | 250103 | L1 | Admitted-Finance | |
| 2 | L2₹5.1 L+₹31,175.60 (6.50%)Admitted-Finance PROP NO A 80 FIRST FLOOR FLAT NO 3 CHATTAR PUR ENCLAVE PHASE 2 NEW DELHI SOUTH WEST DELHI DELHI 110074 | SOUTH DELHI | DELHI | 110074 | L2 | Admitted-Finance |
| Sl No | Description | Qty | Unit | Premier Engineering Company L1 | M G Traders and Engineers L2 |
|---|---|---|---|---|---|
| 1.01 | Repairing/Servicing of LT panel having 1000 amp ACB 03 Nos. make L&T 415V & other allied works at Kondli Gharoli SPS by Carrying out following works, including all the required safety measures as per the guide lines issued by NHRC/NGT etc.:- Dismantling & taking out ACB L&T MAKE from LT panel removing of defective parts of ACB, removing of all incoming & outgoing connection. | 3 | Jobs | 10,500 ₹12,390 Lowest | 12,000 ₹14,160 |
| 1.02 | Dismantling & taking out MCCB L&T MAKE from LT panel, removing of all incoming & outgoing connection. | 6 | Nos | 7,500 ₹8,850 Lowest | 8,100 ₹9,558 |
| 1.03 | Supply of MCCB 400Amp. TP 50 ka with spreader & Handle (PN3-400N). Make :L&T | 6 | Nos | 1,71,000 ₹2,01,780 Lowest | 1,80,000 ₹2,12,400 |
| 1.04 | Retrofitting of MCCB in place of existing in LT panel, fixing of base frame, making & connecting bus bar with MCCB & connection of cable etc. complete in all respect | 6 | Nos | 75,000 ₹88,500 Lowest | 81,000 ₹95,580 |
| 1.05 | Providing fixing of indicating lamps | 12 | Nos | 3,360 ₹3,964.8 Lowest | 3,480 ₹4,106.4 |
| 1.06 | Providing & fixing of Under voltage trip device (UVT) for above ACBs. Make: L&T | 2 | Nos | 8,500 ₹10,030 Lowest | 9,000 ₹10,620 |
| 1.07 | Providing & fixing of Amp meter digital with selector switch with control wiring | 6 | Jobs | 25,500 ₹30,090 Lowest | 27,000 ₹31,860 |
| 1.08 | Providing & fixing of volt meter digital with selector switch with control wiring | 2 | Jobs | 8,500 ₹10,030 Lowest | 9,000 ₹10,620 |
| 1.09 | Cleaning of incoming & outgoing bus bar & complete panel horizontal bus bar Aluminum & insulation with heat shrinkable PVC sleeve/PVC tape throughout in red, yellow & blue color to identify three phases & black for neutral. The bus-bar support insulator made of non-deteriorating, vermin proof, non-hygroscopic materials such as SMC/DMC. | 1 | Job | 32,500 ₹38,350 Lowest | 35,500 ₹41,890 |
| 1.10 | Cleaning, overhauling of the complete ACB in panel, removal of old grease and re-greasing of all movable parts with recommended grease, setting of tripping mechanism, re-wiring of under voltage coil, complete servicing of ACB with making all incoming & out going cable connection with thimbling. | 3 | 3 Jobs | 51,600 ₹60,888 Lowest | 54,300 ₹64,074 |
Tender Value
Refer Docs
EMD Value
₹9,800
Closing Date
18 Feb 2026, 3:00 pmClosed
Executive Engineer (SDW)-IV STP Kondli, Delhi-96
Executive Engineer (SDW)-IV STP Kondli, Delhi-96
Repairing Servicing of LT panel 415 V and other allied works at Kondli Gharoli SPS
2026_DJB_286622_1
NIT- 15 (2025-26) EE(SDW)-IV
Open Tender
Miscellaneous Works
Item Rate
60 days
Executive Engineer (SDW)-IV STP Kondli, Delhi-96
Please refer Tender documents.
3 documents required · 3 mandatory
₹500
A/C No. 50448339804
₹9,800
28 Feb 2026
10 Feb 2026
18 Feb 2026
10 Feb 2026
18 Feb 2026
10 Feb 2026
Repairing/Servicing of LT panel having 1000 amp ACB 03 Nos. make L&T 415V & other allied works at Kondli Gharoli SPS by Carrying out following works, including all the required safety measures as per the guide lines issued by NHRC/NGT etc.:- Dismantling & taking out ACB L&T MAKE from LT panel removing of defective parts of ACB, removing of all incoming & outgoing connection.
Dismantling & taking out MCCB L&T MAKE from LT panel, removing of all incoming & outgoing connection.
Supply of MCCB 400Amp. TP 50 ka with spreader & Handle (PN3-400N). Make :L&T
Retrofitting of MCCB in place of existing in LT panel, fixing of base frame, making & connecting bus bar with MCCB & connection of cable etc. complete in all respect
Providing fixing of indicating lamps
Providing & fixing of Under voltage trip device (UVT) for above ACBs. Make: L&T
Cleaning of incoming & outgoing bus bar & complete panel horizontal bus bar Aluminum & insulation with heat shrinkable PVC sleeve/PVC tape throughout in red, yellow & blue color to identify three phases & black for neutral. The bus-bar support insulator made of non-deteriorating, vermin proof, non-hygroscopic materials such as SMC/DMC.
Cleaning, overhauling of the complete ACB in panel, removal of old grease and re-greasing of all movable parts with recommended grease, setting of tripping mechanism, re-wiring of under voltage coil, complete servicing of ACB with making all incoming & out going cable connection with thimbling.
Testing & commissioning of installed components as per required parameters with relevant IS testing of the panel prior to switching on as Continuity and earth testing, Meggaring of all equipment’s for phase to phase, neutral to body, neutral to earth and phase to earth.
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.24 MB
Tendernotice_2.pdf
PDF • 0.70 MB
BOQ_379474.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .