Loading…
India Infra Updates on WhatsApp
Join the Tenderkart WhatsApp channel for India Tender Updates
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹81,059.30Accepted-Finance | L1 | Accepted-Finance Accept | |
| 2 | L2₹90,744+₹9,684.70 (11.9%)Rejected-Finance | L2 | Rejected-Finance Reject |
Tender Value
₹1 L
EMD Value
₹1,000
Closing Date
28 Jul 2023, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Block Developemnt Officer (VP) S.S Kulam
Block Developemnt Office (VP) S.S Kulam
Construction Of P U Ele School Staff Toilet and Keeranataham H/O Keeranatham Panchayat
2023_RDTN_346345_1
82/2022/B2
Open Tender
Civil Works - Buildings
Works
180 days
Keeranatham Puthupalayam
Construction Of P U Ele School Staff Toilet and Keeranataham H/O Keeranatham Panchayat
4 documents required · 4 mandatory
₹0
₹1,000
Yes
28 Jul 2023
19 Jul 2023
28 Jul 2023
19 Jul 2023
28 Jul 2023
19 Jul 2023
Amount
1.Name of the work : Construction Of P.U.Ele.School Staff Toilet @ Keeranataham H/O Keeranatham Panchayat. SS Kulam union in Coimbatore District under AGAMT-II-2023-2024-Package No. TN 01-SSKM-11
Earthwork excavation and depositing on bank with an initial lead of 10m and lift of 2m in the following classification of soils.Hard stiff clay black cotton, hard red earth, shales, murram, ordinary gravel, stoney earth and earth mixed with small size boulders for foundation SS 20B.
Cement Concrete 1:4:8 (One cement, four sand and eight aggregates) using 40mm HBG stone for levelling course for foundation including the cost of mixing concrete, ramming, curing etc., complete..
Random Rubble Masonry in Cement Mortor 1:5 Mix with Simultaneous pointingincluding cost and conveyance of all materiuals to site and all labour etc completed
Precast hollow Block Bricks CM 1:5 Mix using including cost and conveyance of material and labour charges etc completed
Scratch proof ceramic tiles os size 305x305x6 mm Cost and Conveyance of all materials to sit and all labour charges etc completed
Plastering with cement mortar 1:5 mix to 12mm thick including cost and conveyance of all materials to site and all labour charges etc
Distenbering two coats with old wall in best approved distembering including cost and conveyance of all material to site and all labour charges etc competed
Painting two coats with Emulsion Paint over the one coat of Priming coat including cost and conveyance of all materials to site and all labour charges etc complete
Supplying and fixing in position best quality european Water Closet(EWC) including cost & Conveyance etc Completed.
Supply Of Steel Door of Size 0.75x1.80 M including cost and Conveyance etc Completed as per std Specification
Fixing of Steel Door of Size 0.75x1.80M Including cost and Conveyance etc Completed as per std Specification
Supply and Fixing Of RCC Jolly of size 0.45x0.30 m including cost and conveyance etc Completed as per std Specification
Painting two coats over New iron Works using ready mixed enamel paint including copst and conveyance of paint and all labour Charges etc completed,
Supply and erecting centering shuttering including necessary support including all charges etc Complleted
Supply and Fabrication of steel including cost and conveyance of steel to site and all labour charges for Straight ening ,cutting to length bending to shape and tying position and formimng grills for all RCC works
Reinforced Cement Concrete 1:1.5:3 (One cement, four sand and eight aggregates) using 20mm HBG stone for levelling course for foundation including the cost of mixing concrete, ramming, curing etc., complete..
Plastering with cement mortar 1:3 mix to 10mm thick including cost and conveyance of all materials to site and all labour charges etc
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .