| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.3 CrAdmitted-Finance | ₹4.3 Cr | L1 | Admitted-Finance |
| 2 | L2₹4.8 Cr+₹43.7 L (10.1%)Admitted-Finance 316 VIJAY NAGAR EXTENSION RANJHI MAIN ROAD JABALPUR MP | JABALPUR | MADHYA PRADESH | 482001 | ₹4.8 Cr+₹43.7 L (10.1%) | L2 | Admitted-Finance |
| 3 | L3₹5.6 Cr+₹1.3 Cr (30.1%)Admitted-Finance PARISHRAM MADAN MAHAL CHOWK NAGPUR ROAD JABALPUR 248001 | JABALPUR | DEHRADUN | UTTARAKHAND | 248001 | ₹5.6 Cr+₹1.3 Cr (30.1%) | L3 | Admitted-Finance |
| Sl No | Description | Qty | Unit | SATYA PRAKASH BUILDERS LTD L3 | M/s PARASRAM MULCHANDANI L2 | SATYA CONSTRUCTION L1 |
|---|---|---|---|---|---|---|
| 1.00SCHEDULE "A" Part-I (Building/Structures) (To be quoted by the tenderer) | ||||||
| 2.00 | Item No 01A : Design and construction of MT Garage bldg with apron, RCC framed structure for 5 vehicles complete all as spd in soil bearing capacity report, design basis report, drawing and tender documents and directed by Engineer In Charge | 1 | Lump sum | 37,30,000 ₹37,30,000 | 45,00,000 ₹45,00,000 | 34,00,000 ₹34,00,000 Lowest |
| 3.00 | Item No 01B : Design and construction of MT Garage bldg with apron, RCC framed structure for 7 vehicles complete all as spd in soil bearing capacity report, design basis report, drawing and tender documents and directed by Engineer In Charge | 1 | Lump sum | 94,50,000 ₹94,50,000 | 80,00,000 ₹80,00,000 | 38,00,000 ₹38,00,000 Lowest |
| 4.00 | Item No 01C : Design and construction of MT Garage bldg with apron, RCC framed structure for 6 vehicles complete all as spd in soil bearing capacity report, design basis report, drawing and tender documents and directed by Engineer In Charge | 1 | Lump sum | 86,70,000 ₹86,70,000 | 72,00,000 ₹72,00,000 | 37,00,000 ₹37,00,000 Lowest |
| 5.00 | Item No 01D : Design and construction of MT Garage bldg with apron, RCC framed structure for 2 vehicles complete all as spd in soil bearing capacity report, design basis report, drawing and tender documents and directed by Engineer In Charge | 1 | Lump sum | 33,37,000 ₹33,37,000 | 28,50,000 ₹28,50,000 | 19,00,000 ₹19,00,000 Lowest |
| 6.00 | Item No 01E : Design and construction of MT office Accn, storage Accn and Driver change room bldg RCC framed structure compete all as spd in soil bearing capacity report, design basis report, drawing and tender documents | 1 | Lump sum | 47,00,000 ₹47,00,000 | 64,00,000 ₹64,00,000 | 27,89,765 ₹27,89,765 Lowest |
| 7.00 | Item No 01F : Design and construction of repair bay incl RCC Inspection pit of size (1.80x5.50mtr) , and balance portion incl apron, RCC framed structure complete all as specified in soil bearing capacity report, design basis report, drawing and tender documents | 1 | Lump sum | 33,37,000 ₹33,37,000 | 8,00,000 ₹8,00,000 Lowest | 19,00,000 ₹19,00,000 |
| 8.00 | Item No 01G : Design and construction of petrol store of size (3.50 X 5.20) RCC framed structure complete all as specified in soil bearing capacity report, design basis report, drawing and tender documents | 1 | Lump sum | 4,47,000 ₹4,47,000 Lowest | 5,25,000 ₹5,25,000 | 17,50,000 ₹17,50,000 |
| 9.00 | Item No 01H : Construction of washing platform of size (11.00 X 8.00 Mtr) complete all as specified in soil bearing capacity report, drawing and tender documents (CE Chennai Zone :TD-597). | 2 | Lump sum | 17,97,000 ₹35,94,000 | 8,00,000 ₹16,00,000 Lowest | 9,50,000 ₹19,00,000 |
| 10.00 | Item No 01I : Design and construction of sentry post complete all as specified in soil bearing capacity report. . | 2 | Lump sum | 1,60,000 ₹3,20,000 Lowest | 5,00,000 ₹10,00,000 | 18,00,000 ₹36,00,000 |
Tender Value
₹4.4 Cr
EMD Value
₹5.1 L
Closing Date
4 Jul 2026, 6:00 pmClosed
Chief Engineer Jabalpur Zone
HQ Chief Engineer Jabalpur Zone Ridge Road Jabalpur Cantt 482001
PROVN OF COVERED ACCN MT GARRAGE SHED FOR 23 VEH WITH STORE AND ALLIED INFRA AT 506 ABW UNDER GE E JABALPUR
2026_MES_749932_1
753031
Open Tender
Civil Works
Lump-sum
365 days
JABALPUR
AS PER NIT
8 documents required · 8 mandatory
₹3,000
Yes
GE EAST JABALPUR
₹5.1 L
Yes
23 Jul 2026
24 Feb 2026
11 Jul 2026
24 Mar 2026
4 Jul 2026
13 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | SCHEDULE "A" Part-I (Building/Structures) (To be quoted by the tenderer) | - | - | - | - |
| 2 | Item No 01 : Design and construction building work complete all as specified in soil bearing capacity report, design basis report, drawings and tender documents. | 1 | Lump sum | - | - |
| 3 | Sch 'A' Part-II (External Electric supply) Lump sum price worked out by the contractor for (External Electric supply) as listed in Schedule 'A' Part-II against the lump sum price inserted by the MES. | 1 | Lump sum | - | - |
| 4 | Sch 'A' Part-III (External Water supply) Lump sum price worked out by the contractor for (External Water supply) as listed in Schedule 'A' Part-III against the lump sum price inserted by the MES. | 1 | Lump sum | - | - |
| 5 | Sch 'A' Part-IV (Road Path Culvert) Lump sum price worked out by the contractor for (Road Path Culvert) as listed in Schedule 'A' Part-IV against the lump sum price inserted by the MES. | 1 | Lump sum | - | - |
| 6 | Sch 'A' Part-V (Sewage Disposal) Lump sum price worked out by the contractor for (Sewage Disposal) as listed in Schedule 'A' Part-V against the lump sum price inserted by the MES. | 1 | Lump sum | - | - |
| 7 | Sch 'A' Part-VI (Area Drainage) Lump sum price worked out by the contractor for (Area Drainage) as listed in Schedule 'A' Part-VI against the lump sum price inserted by the MES. | 1 | Lump sum | - | - |
| 8 | Sch 'A' Part-VII (Summer and cooling applainces) Lump sum price worked out by the contractor for (Summer and cooling applainces) as listed in Schedule 'A' Part-VII against the lump sum price inserted by the MES. | 1 | Lump sum | - | - |
| 9 | Sch 'A' Part-VIII (Arboriculture) Lump sum price worked out by the contractor for (Arboriculture) as listed in Schedule 'A' Part-VIII against the lump sum price inserted by the MES. | 1 | Lump sum | - | - |
| 10 | Sch 'A' Part-IX (Fencing & Gate) Lump sum price worked out by the contractor for (Fencing & Gate) as listed in Schedule 'A' Part-IX against the lump sum price inserted by the MES. | 1 | Lump sum | - | - |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.82 MB
tender.pdf
Tender Documents • 4.90 MB
BOQ_844512.xls
BOQ • 7.62 MB
C16.pdf
PDF • 0.10 MB
C15.pdf
PDF • 10.33 MB
drwgsnew.rar
PDF • 3.68 MB
C14.pdf
PDF • 1.08 MB
C13.pdf
PDF • 1.73 MB
C12.pdf
PDF • 0.12 MB
C10.pdf
PDF • 0.38 MB
C9.pdf
PDF • 0.28 MB
C8.pdf
PDF • 0.29 MB
C7.pdf
PDF • 0.11 MB
C6.pdf
PDF • 0.11 MB
C5.pdf
PDF • 0.11 MB
C4.pdf
PDF • 0.11 MB
C3.pdf
PDF • 0.11 MB
C2.pdf
PDF • 0.11 MB
C1.pdf
PDF • 0.11 MB
C1D.rar
PDF • 3.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .