Tender Value
₹33.5 L
EMD Value
₹33,500
Closing Date
28 May 2020, 4:00 pmClosed
Project Director
DRDA, Namakkal
1 road work at Namagiripet Block in Namakkal District under NABARD XXV Package 11
2020_RDTN_163486_10
1785/2020
Open Tender
Civil Works - Roads
Item Rate
180 days
Namagiripet Block
Class I
3 documents required · 3 mandatory
₹0
₹33,500
Yes
DRDA, Namakkal
1 Jun 2020
13 May 2020
28 May 2020
13 May 2020
28 May 2020
20 May 2020
20 May 2020
Amount
Strengthening the road from Managalapuram vanakarankuttai to annanagar 0/0-1/410 (R397)
Clearing Scrub Jungles and removing them by burrying or burning etc., completed as per Sl. No.2
Picking 5 cm to 10 cm old metalled surface and sectioning - 1 sq.m
Collection and Supply of Gritty Gravel with an Average Lead of 1K.M including Cost and conveyance and stacking Charges and Spreading with Power Roller including Compaction etc., complete.
Providing and laying W.B.M 75 mm Consolidated Thickness With Grade II Metal using 1.00 Cum of 90mm -22.40mm IRC HG Metal with 0.24Cum of Gritty Gravel for blindage including all charges etc.,
Providing and laying W.B.M 75 mm Consolidated Thickness With Grade III Metal using 1.00 Cum of 63mm -11.20 mm IRC HG Metal with 0.24Cum of Gritty Gravel for blindage including all charges etc.,
Providing and laying Tack coat over the W.B.M surface using 4Kgs. of Emulsion Bitumen for 10 Sqm area etc., complete.
Providing and laying Premix carpet with sealcoat Type A to 20 mm Consolitated etc., complete as per clause 509 of MOST Specification.
1.50 m Span Culvert
Earth work Excavation for structures upto 3m depth as per drawing and technical specification clause 1104 including setting out, construction of shoring and bracing, removal of stumps and other deleterious mattar, dressing of sides and bottom and back filling with approved material.
Cement concrete 1 : 4 : 8 mix using 40mm Metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete.
Cement concrete 1 : 3 : 6 mix using 40mm Metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete. Below sill
Supplying and Centering for all Works including cost and conveyance of all materials to site and all labour charges etc complete.
Below sill
Above sill
Deck Slab
Supplying and fabrication of steel including cost and conveyance
Cement concrete 1 : 2 : 4 mix using 20mm Metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete. Above sill
Cement concrete 1 : 1.5 : 3 mix using 20mm Metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete.
GST Amount for providing Service to Government Contract Works for the above Construction Works {GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
Sri Constructions
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .