| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹18.7 LAdmitted-Finance | -14.81% | ₹18.7 L | L1 | Admitted-Finance |
| 2 | L2₹19.1 L+₹40,392.73 (2.16%)Admitted-Finance | -12.97% | ₹19.1 L+₹40,392.73 (2.16%) | L2 | Admitted-Finance |
| 3 | L3₹19.8 L+₹1.1 L (6.10%)Admitted-Finance | -9.61% | ₹19.8 L+₹1.1 L (6.10%) | L3 | Admitted-Finance |
| 4 | L4₹20.1 L+₹1.4 L (7.35%)Admitted-Finance | -8.55% | ₹20.1 L+₹1.4 L (7.35%) | L4 | Admitted-Finance |
| 5 | L5₹20.5 L+₹1.8 L (9.75%)Admitted-Finance | -6.50% | ₹20.5 L+₹1.8 L (9.75%) | L5 | Admitted-Finance |
Tender Value
₹21.9 L
EMD Value
₹43,900
Closing Date
6 Aug 2026, 6:00 pmClosed
Executive officer
Nagar Palika Newai
Construction of Toilets in Community hall ward no 02, in Municipal area, Newai.
2026_DLB_580701_26
Nit-13/2026-27 Newai
Open Tender
Civil Works
Percentage
120 days
NEWAI
Referred Document
2 documents required · 2 mandatory
₹500
MDRISL/EO
₹43,900
Yes
13 Aug 2026
1 Aug 2026
7 Aug 2026
1 Aug 2026
6 Aug 2026
1 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1WORKS | |||||
| 1.01 | Earth work in excavation in foundation, trenches etc. including dressing of sides and ramming of bottoms, including getting out the excavated material, refilling after laying pipe/ foundation and disposal of surplus excavated material at a lead upto 50m suitable site as per direction of Engineer for following depths, below natural ground / Road top level.In all types soils/ saturated soil such as moorum, sand, sandy silt, clay, black cotton soil, kankar, etc.Depth upto 1.5 m | 40.35 | P.CUM | 229.5 | ₹9,260.33 |
| 1.02 | Earth filling with available surplus soil excavated from foundations and taken only from outside of building plinth in layers not exceeding 20cm in depth, consolidating each deposited layer including ramming and watering and consolidation with lead up to 50 m and lift upto 1.5 m. | 35 | P.CUM | 159 | ₹5,565 |
| 1.03 | Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering - All work upto plinth level : 1:4:8 (1 Cement : 4 fine/ coarse sand : 8 graded stone aggregate 40 mm nominal size). | 11.5 | P.CUM | 4,575 | ₹52,612.5 |
| 1.04 | Random rubble masonry with hard stone in foundation and plinth : Cement mortar 1:6 (1 cement : 6 coarse sand) | 40.5 | P.CUM | 4,860 | ₹1,96,830 |
| 1.05 | Reinforcement for R.C.C. work at all levels including straightening, cutting, bending, placing in position and binding all complete. Thermo-Mechanically Treated bars | 2,000 | P.KG | 83.3 | ₹1,66,600 |
| 1.06 | Centring and shuttering with plywood or steel sheet upto two stories or height upto 7.5 metre above plinth level including strutting, propping etc. and removal of form for : | 23.46 | P.SQM | 236.5 | ₹5,548.29 |
| 1.07 | Centring and shuttering upto two stories or height upto 7.5 metre above plinth level including strutting, propping etc. and removal of form for : Suspended floors, roofs, landings, balconies and access platform. | 60.2 | P.SQM | 456 | ₹27,451.2 |
| 1.08 | Centring and shuttering upto two stories or height upto 7.5 metre above plinth level including strutting, propping etc. and removal of form for : Lintels, beams, plinth beams, girders, bressumers and cantilevers. | 55 | P.SQM | 426 | ₹23,430 |
| 1.09 | Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. upto two stories excluding cost of centring, shuttering, finishing and reinforcement : 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) | 2.17 | P.CUM | 7,380 | ₹16,014.6 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 3.45 MB
BOQ_1031938.xls
BOQ • 0.48 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .