Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹32.0 LAdmitted-Finance | -0.30% | ₹32.0 L | L1 | Admitted-Finance |
| 2 | L2₹32.0 LAdmitted-Finance | -0.20% | ₹32.0 L | L2 | Admitted-Finance |
| 3 | L3₹32.1 LAdmitted-Finance | -0.10% | ₹32.1 L | L3 | Admitted-Finance |
Updated dates
Tender Value
₹32.1 L
EMD Value
₹3.2 L
Closing Date
30 Mar 2026, 11:00 amClosed
EO, NP KANTH
NAGAR PANCHAYAT KANTH, MORADABAD
WARD NO 08 ME SHISHUPAL KE GHAR SE PARIO KI PULIA TAK CC SADAK AND RCC NALI NIRMAN KARYE.
2026_DOLBU_1121863_15
874/N.P. KANTH/26 DATE 26.02.2026
Open Tender
Civil Works
120 days
KANTH (MORADABAD)
Please refer Tender documents.
2 documents required · 2 mandatory
₹4,109
EXECUTIVE OFFICER, NP KANTH
₹3.2 L
NAGAR PANCHAYAT KANTH, MORADABAD
2 Apr 2026
3 Mar 2026
30 Mar 2026
3 Mar 2026
30 Mar 2026
3 Mar 2026
9 Mar 2026
Excavating, supplying and filling of local earth (including royalty) by mechanical transport upto a lead of 5km also including ramming and watering of the earth in layers not exceeding 20 cm in trenches, plinth, sides of foundation etc. complete.DSR Item No-2.25(a)( Rate=700.50*0.749=524.67/cum)
Providing & Laying P.C.C. 1:5:10 (1 cement : 5 coarse sand (zone-III) derived from natural sources : 10 graded stone aggregate 40 mm nominal size derived from natural sources. DRS 2023 Item no -(4.1.10) Rate(6518.60*0.749=4882.43/Cum)
Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor five level, excluding cost of centering, shuttering, finishing and reinforcement : 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources). DRS Item No -5.2.2 (Rate=10852.95*0.749=8128.86/Cum)
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level.(Thermo-Mechanically Treated bars of grade Fe-500D or more) .DSR Item No-5.22.6 (Rate=107.10*0.749=80.22/Kg)
Providing & Laying P.C.C. 1:5:10 (1 cement : 5 coarse sand (zone-III) derived from natural sources : 10 graded stone aggregate 40 mm nominal size derived from natural sources. DRS 2023 Item no -(4.1.10) Rate(6518.60*0.749=4882.43/Cum)
1:2:4 (1 cement : 2 coarse sand (zone-lll) derived fromnatural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources) DSR Code 2023 - 4.1.3 (Rate - 7878.50x0.749 = 5901 /cu-m
Supply & Fixing inaguration stone/ information board in pair of brick work complete in all respect.
Add for say
Please Enable Macros to View BoQ information
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.76 MB
BOQ_2088076.xls
BOQ • 0.27 MB
T1_15.pdf
Tender Documents • 13.48 MB
Download all tender documents and submit your bid