Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹2.8 LAdmitted-Fee/PreQual/Technical/Finance | -5.00% | ₹2.8 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹3.0 L+₹17,750.71 (6.32%)Admitted-Fee/PreQual/Technical/Finance | +1.00% | ₹3.0 L+₹17,750.71 (6.32%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | Not Admitted-Fee/PreQual/Technical/Finance | - | - | - | Not Admitted-Fee/PreQual/Technical/Finance Others-HALQA CERTIFICATE DIFFERENT THAN WORK PROPOSED |
| 4 | Not Admitted-Fee/PreQual/Technical/Finance | - | - | - | Not Admitted-Fee/PreQual/Technical/Finance Others-NIT & WORK NO NOT MENTIONED ON CDR |
| 5 | Not Admitted-Fee/PreQual/Technical/Finance | - | - | - | Not Admitted-Fee/PreQual/Technical/Finance Others-HALQA LEVEL CERTIFICATE DIFFERENT THAN WORK PROPOSED |
Tender Value
₹3.0 L
EMD Value
₹5,916
Closing Date
30 Jul 2026, 6:00 pmClosed
EXECUTIVE ENGINEER REW BANDIPORA
EXECUTIVE ENGINEER REW BANDIPORA
UPGRADATION OF PUBLIC PARK KAKA MOHALLA PHASE 2ND BWO EXTENSION OF FENCING
2026_RDPR_316884_5
NIT21
Open Tender
Civil Works
Percentage
EXECUTIVE ENGINEER REW BANDIPORA
Please refer Tender documents.
2 documents required · 2 mandatory
₹200
Rural Development and Panchayati Raj
₹5,916
9 Aug 2026
21 Jul 2026
31 Jul 2026
21 Jul 2026
30 Jul 2026
21 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by Manual means in trenches for foundations,drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed:all kinds of soil | 6.37 | CUM | 479.3 | ₹3,053.14 |
| 2 | Proving stone soling hand packed in excavated trench incl. Ramming ,levelling and incl all carraiges of material | 7.48 | CUM | 1,100 | ₹8,228 |
| 3 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with:
1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) | 20.39 | CUM | 5,733.6 | ₹1,16,908.1 |
| 4 | Centering and shuttering including strutting, propping etc. and removal of form for foundation 5.9.2 Walls (any thickness) including attached pilasters, buttresses, plinth and string courses etc. | 111.52 | Sqm | 286 | ₹31,894.72 |
| 5 | Banking excavated earth in layers not exceeding 20cm in depth, breaking clods, watering, and dressing up, in embankments for roads, flood banks, marginal banks, and guide banks etc., lead upto 50 m and lift upto 1.5 m in All kinds of soil. including all carriages by MT (without rolling) | 248.49 | CUM | 495 | ₹1,23,002.55 |
| 6 | Carriage of Sand and Aggregate by MT 20 KM | 28.75 | CUM | 409 | ₹11,758.75 |
| 7 | Add cost of of sign board and photograph | 1 | Nos | 1,000 | ₹1,000 |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.47 MB
BOQ_1035920.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .