| 1 | L1₹76.2 LAccepted-AOC | L1 | Accepted-AOC Lowest Eligible Bidder | |
| 2 | L2₹77.0 L+₹46,070 (0.60%)Rejected-Finance | L2 | Rejected-Finance L2 BIDDER | |
| 3 | L3₹78.4 L+₹1.9 L (2.48%)Rejected-Finance | L3 | Rejected-Finance L3 BIDDER | |
| 4 | L4₹79.0 L+₹2.5 L (3.22%)Rejected-Finance | L4 | Rejected-Finance L4 BIDDER | |
| 5 | L5₹81.4 L+₹4.9 L (6.42%)Rejected-Finance MIG 303 B 13 THAARINE NIVAS TNHB PHASE II NOLAMBUR CHENNAI 600 037 | THIRUVALLUR | TAMIL NADU | 600037 | L5 | Rejected-Finance L5 BIDDER |
Tender Value
₹92.2 L
EMD Value
₹61,660
Closing Date
11 Sept 2019, 10:00 amClosed
EXECUTIVE ENGINEER AND ESTATE OFFICER
ESTATE OFFICE, TNAU, COIMBATORE
As per BOQ
2019_TNAU_134873_1
EO/DB/(9)VVNR/CWALL/dt.9.8.19
Open Tender
Civil Works - Buildings
Lump-sum
120 days
Vazhavachanur, Thiruvannamalai District
Please refer Tender documents.
6 documents required · 6 mandatory
₹0
₹61,660
8 Jan 2020
21 Aug 2019
16 Sept 2019
21 Aug 2019
11 Sept 2019
21 Aug 2019
Amount
EARTHWORK EXCAVATION for foundation in all soils and sub soils and to full depth as may be directed except in rock requiring blasting but inclusive of shoring, strutting and bailing out water wherever necessary and refilling the sides of foundation with excavated earth in layers of not more than 15cm thick, well rammed and consolidated and depositing the surplus earth within the compound in places shown by the departmental officers with initial lead and lift etc., Complete complying with standard specifications and as directed by the departmental officers.
For depth upto 2m from Ground Level
Supplying and filling in foundation, basement and trenches with FILLING M.SAND in layers of not more than 15cm thick, well watered, rammed and consolidated etc., Complete complying with standard specification and as directed by the departmental officers.
PLAIN CEMENT CONCRETE 1:5:10 (One cement, five M.sand and ten aggregate) using 40mm gauge hand broken hard granite stone jelly for FOUNDATION and flooring including dewatering if found necessary and laid in layers of not more than 15cm thick, well rammed etc., complete complying with standard specification and as directed by the departmental officers
REINFORCED CEMENT CONCRETE 1:2:4 (One cement two M.sand and four aggregate) using machine crushed 20mm gauge hard broken granite stone jelly for all reinforced cement concrete works connected to this work excluding centering, strutting, cost of reinforcement grills placed in position, but including laying, vibrating, curing and finishing, fixing fan clamps in the RCC floor and roof slab works wherever necessary and bearing surfaces of the wall at the sides and bottom of the slab, beams etc., Complete complying with standard specification and as directed by the departmental officers.
Foundation and Basement
Supplying and erecting CENTERING including necessary supports for the plane surfaces such as RCC COLUMN FOOTING,PLINTH BEAM & SILL BEAMS etc., in all floors using mild steel sheets of size 90cm * 60cm and BG 10 stiffened with welded mild steel angles of size 25mm x 25mm x 3mm for boarding supported by Casuarina props of 10cm to 13cm dia spaced at suitable intervals etc., complete complying with standard specification and as directed by the departmental officers.
Plinth Beam
Column & Sunshade
Supplying, fabricating and placing in position mild steel / ribbed tor steel rods for all RCC works including cutting, bending to required shape and placing in position, and including cost of steel and binding wire and all labour charges, conveyance etc. in all floors complete complying with standard specification and as directed by the departmental officers.
BRICK WORK in cement mortar 1:5 (One cement and five M.sand) using best quality II class chamber burnt bricks of size 23x11x7cm (9" x 43/8" x 23/4") including curing etc., complete complying with standard specification and as directed by the departmental officers. (Masonry projections wherever necessary for obtaining required elevation shall be done without extra cost.)
Ground floor
Plastering with cement mortar 1:5 (one cement five P.sand) 12 mm., thick for walls in all floors including necessary scaffolding, curing, neat finishing etc., complete complying with standard specifications and as directed by the departmental officers
Supplying and fixing of MS fencing ANGLES of best & approved quality including necessary cutting, bending, welding, transportation and placing in position with proper alignment including one coat of red oxide primer etc., Complete as per Standard Specification and as directed by the departmental officers.
WHITE WASHING ONE COAT using best quality (KOTTAYAM) White cement in floors including cost of white cement and other materials, brushes, scaffolding charges etc., complete complying with standard specification and as directed by the departmental officers. (The rate is inclusive of cost of gum, best quality of blue powder etc.,).
PAINTING the wall surface with TWO COAT of Weather shield max exterior paint of the approved colour as per the specification including ONE COAT OF PRIMER to give an even shade at the external walls with necessary scrapping including cost of brushes and all other materials required and the scaffolding charges etc., complete complying with the standard specification and as directed by the departmental officers.(The paint to be used should be got approved by the departmental officers before us on work.)
PAINTING NEW IRON WORKS with two coats of Enamel paint of approved quality and colour OVER A PRIMING COAT with approved quality of red oxide primer. The rate is inclusive of coat of all materials and labour, brushes and scaffolding charges etc., complete complying with standard specification. (The paint to be used should be got approved by the Departmental officers. before use on work)
Supplying and fixing of barbed wire including necessary cutting,trying,bending,cost of binding wire etc.,Complete complying with the standard specification and as directed by the departmental officers.
KSR CONSTRUCTIONS
S KADIRVEL AND COMPANY
MSK CONSTRUCTION
Haarine Associates
Naveena decorators
stage.html
html • 0.06 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_162827.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .