Loading…
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Tender Value
₹35 L
EMD Value
₹70,000
Closing Date
28 Nov 2025, 4:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Executive Engineer RnB Division Budgam
Engineering complex Budgam
Development of Road from Arigam to Shamasabad, Arigam to Yugbug Wiith Sedyar to Nagbal via Dajnar link at Arigam
2025_PWDJK_295713_3
NIT_No_56_DB_2025-26
Open Tender
Civil Works
Percentage
60 days
Arigam
Please refer Tender documents.
3 documents required · 3 mandatory
₹1,100
Executive Engineer RnB Division Budgam
₹70,000
28 Nov 2025
19 Nov 2025
29 Nov 2025
19 Nov 2025
28 Nov 2025
19 Nov 2025
Earth work in bulk excavation by mechanical means (hydraulic excavator) over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge. All kinds of soil
Earth work in surface excavation not exceeding 30 cm in depth but exceeding 1.5 m in width as well as10 sqm on plan including disposal of excavated earth, leadupto50meterand lift upto 1.5m, as directed by Engineer-in-Charge. All kinds of soil
Providing and laying of Nallah Muck/GSB including levelling ,watering and consolidation with power road roller of 8-10 tonne capacity to the required gradient and camber including all carriages complete.
Supply, Stacking, spreading and compacting of WBM Grade -II with specified graded stone aggregate at site of size range 63-45 mm broken quarry stone icluding stone screening and binding material including all carriages.
Providing and laying of RCC Spun pipes For cross drainages incl. excavation of trenches upto required depth and jointing of pipes with cement slurry incl. all carriages
Earth work in excavation by mechanical means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 min width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed:1 meter fromcutting edge All kinds of soil :
Providing and laying of stone soling hand packed tightly including watering ramming , Consolidation with hand rammer including all costs of material and All carriages, leads, lifts upto Site of work complete
Providing and laying in position cement concrete of specified grade 1:4:8 including curing but excluding the cost of centring and shuttering. All work upto plinth.
Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) incl weep hole pipes
Centering and shuttering including strutting, propping etc. and removal of form work for: Foundations, footings, bases for columns
Retaining walls. Return walls( any thickness)
Cement concrete flooring 50mm thick in 1:2:4 (1cement: 2 coarse sand: 4 graded stone aggregate) finished with a floating coat of neat cement including cement slurry and curing complete, but excluding the cost of nosing of steps.
Carriage of Sand by MT for an average lead of 20 Kms
Carriage of Stone Aggregate 20mm by MT for an average lead of 20 Kms
Carriage of Stone Aggregate 40mm by MT for an average lead of 20 Kms
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.23 MB
BOQ_957389.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .