| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹16.2 LAccepted-AOC BHAGIRATHIPUR DOMKAL MSD | DOMKAL | MURSHIDABAD | WEST BENGAL | 742101 | L1 | Accepted-AOC L1 | |
| 2 | L2₹17.6 L+₹1.3 L (8.21%)Rejected-Finance RUDRANAGAR P S SAGAR 24 PARGANAS SOUTH | L2 | Rejected-Finance L2 | |
| 3 | L3₹18.0 L+₹1.7 L (10.6%)Rejected-Finance PATRA MARKET KRISHANAGAR NADIA | KRISHANAGAR | NADIA | L3 | Rejected-Finance L3 |
Tender Value
Refer Docs
EMD Value
₹36,000
Closing Date
1 Nov 2019, 2:00 pmClosed
Executive Engineer SMD PHE Dte
Chetla, Kolkata- 700027
Illumination and water supply arrangement at Namkhana point in connection with Ganga Sagar Mela 2020
2019_PHED_246388_6
WBPHE/EE/SMD/NIeT- 09 of 2019-2020
Open Tender
Electrical Work/ Equipment
Item Rate
60 days
Namkhana
Please refer Tender documents.
4 documents required · 4 mandatory
₹36,000
Yes
14 Sept 2020
27 Sept 2019
6 Nov 2019
27 Sept 2019
1 Nov 2019
27 Sept 2019
Amount
Drawing L.T. distribution line (for 3 phase 4 wire and single phase system) on hire basis for medium pressure voltage as per I.E. Rules and ISS by 16 sq. mm. to 50 sq. mm PVC insulated single core wire including supplying binding wire etc. all complete as per direction of E.I.C.
Jetty – 1,2,3,4 & different feeder road towards Indira Maidan.
Village road & forest road (by 3 ph, 4 wire system)
New Bus Stand
Supply on the hire basis 4.88 M (16’-0”) feet long 100mm (4”) dia. bottom post and erecting indifferent places as per direction of E.I.C.
Supply on hire basis steel tubular pole(9mtr) height and erecting the same at different places of jetty ghat in any kind of soil with 2 mt. deep below ground level with proper piling and all protection to avoid accident and each pole should be properly earthed as per direction of E.I.C.
Making the arrangement of 9.18m (30 ft.) long 2.44 m (8 ft.) bottom of square type tower by means of salbollah and bamboo post for proper illumination of bus stand incl. supply of necessary materials to complete the tower on hire basis to provide sodium vapour fixture as per direction with all electrical connection and necessary protection as per direction of E.I.C
Drawing street light point on post with supply on hire basis 40 watt tube light with fixture complete for illumination incl. guarding the same from 06.01.2020 to 18.01.2020 = 13 days x 50 pts.
Drawing the ceiling light points from different feeder line as per direction incl. supplying on hire basis 100 watt bulb, bracket holder etc. and all other necessary materials reqd. to complete the work from 09.01.2020 to 18.01.2020 = 10 days x 800 pts.
Fitting fixing of Glow signboard/vernacular board /signage board/ LED Board/ Jetty signaling board on salbollah structure on different places includes electrical connection as per direction of E.I.C (Glow sign board, signage board, vernacular board will be supplied from dept. store).
Drawing flood light points on existing tubular pole from different feeder line as per direction incl. supplying on hire basis 400 W sodium vapour lamp and Holder with light fixture as required for the work incl. guarding from 03.01.2020 to 18.1.2020
a) 400 W sodium vapour – 16 days x 260 pts.
b) 400 sodium vapour on tubular pole /PCC pole = 16 days x 76 pts.
Drawing flood light point in jetty no. 1,2,3, 4 & 5 on existing PCC pole/tubular pole from different feeder line as directed with fitting fixing of 400 watt twin type SON-T flood light fixture and lamp with control gear bulb etc as required to complete the work on hire basis for the period from 10-01-2020 to 16-01-2020 = 7 days x 5pts = 35pts
Drawing chain light points from different feeder lines as per direction with supply on hire basis 60 W bulb holder etc. and all other required materials for illumination incl. guarding from 09.01.2020 to 18.01.2020= 10 days x 100 pts.
Carrying charges of 5 number panel board halogen fixture sodium vapour fixture, glow sign board, vernacular board etc from Namkhana store to working site and back to store after Mela incl. loading and unloading complete.
Carrying of 4 Nos. departmental power distribution panel board, cable from store to different controlling station and return to store including storage after mela as per direction of EIC.
Installation of power distribution panel boards for power supply from WBSEDCL in different substation including electrical inter connection from departmental Panel Board to WBSEDCL Panel Board for LT. Distribution line before 06.1.2016 including proper earthing arrangement complete as per direction of EIC.
Drawing the power line from generating station to controlling switch by necessary required length of PVC insulated aluminum wire including interconnection with earthing arrangement as per IE Rules i.e. generator to elec. accessories of the temporary Controlling station.
Temporary installation of controlling station with fitting of 63 amps. TPN main switch as per direction of E.I.C incl. supply of salbollah post, wooden plank on hire basis with supply of all req. materials complete incl. electrical connection as per direction of E.I.C before 05.01.2020
(a)Departmental Panel board
(b)Panel Board on hire basis of 100 Amps
Making electrical connection from WBSEB supply main switch to different panel board by supplying on hire basis 50 sq. mm. to 3 ½ core P.V.C. Al. Ar. cable as per IE rules incl. supply of all reqd. materials before 05.01.2019 including, earthing as per IE rules and direction of E.I.C (avg. distance from WBSEB supply main switch to panel board is 50 mtr. approx.)
Fitting fixture of 63 amps/120amps main switch and changeover switch etc. on panel board incl. electrical connection with main line and generator line etc. with supply of necessary cable as required on hire basis to complete the work as per direction of E.I.C.
Supply and fitting fixing of 2pin 5 amps [for mobile charge] and 3 pin 15 amps [for special purpose]
Maintenance of controlling station by engaging skilled labour for operation of controlling switch at different places as per direction of EIC
Guarding arrangement of the whole installation by engaging experienced guard as per direction of E.I.C. in three shifts from 03.01.2020 to 18.01.2020
Talking out the whole installation after Mela as per direction of E.I.C.
Repairing of all glow sign board by supplying necessary electrical and other materials etc as required and to complete the work as per direction of EIC [total number of glow sign board-35nos approx.]
Gas filling of SPDP type fire extinguisher[Capacity 1 Kg]
NEW APPROACH ROAD FROM NAMKHANA RAILWAY STATION TO NAMKHANA JETTY Supply on hire basis of 9 mtr long and erecting on the road side of approach road of Namkhana Railway Station as per direction of EIC from 07-01-2020 to 16-01-2020
Supply at site the following items:
D type iron clamp galvanized set with necessary G.I nuts and bolts and washer
Porcelain shackle insulator
Fitting fixing of the item no.2 on the M.S pole after completion of erecting work
Drawing of distribution line from medium pressure voltage 3 Ph 4 wire system by 25 sq.mm PVC insulated wire on hire basis
Earthing arrangement by supply 16mm dia earth spike 2 mtr long including supply of galvanized nuts bolts and washer
Drawing of street light on MS pole and erecting the same on hire basis of 400 watt S.V fixture ballast and lamp etc from 07-01-2020 to 16-01-2020 = 10 days x 25 points
JETTY AND DIFFERENT PLACES Making arrangement of 9.18 mtr [30ft] long 2.44 [8ft] bottom sq. type tower by means of salbollah and bamboo post for proper illumination of jetty ghat no. 1,2,3, 4 & 5 including supply of necessary materials to complete the tower on hire basis to provide sodium vapour as per direction with all electrical connection and necessary protection as per direction of the EIC
Drawing of distribution line from medium pressure voltage 3 Ph 4 wire system by 25 sq.mm PVC insulated wire on hire basis
Drawing flood light point on poles from different feeder line as per direction including supplying on hire basis 400 watt sodium lamp holder with light fixture as required for the work from 06-01-2020 to 18-01-2020 of 400 watt sodium vapour [13 days x 15 pts]
NARAYANPUR PRIMARY SCHOOL AND PHE COMPOUND Supply on hire basis 9 meter long steel tubular pole and erecting the same at different places of Narayanpur Primary School and PHE compound with 2 mt. deep below ground level with proper piling and all protection to avoid accident and each pole should be properly earthed as per direction of E.I.C.
Drawing L.T. distribution line 3 phase 4 wire on hire basis for medium pressure voltage as per I.E. Rules and ISS by 16 sq. mm. to 25 sq. mm PVC insulated single core wire including supplying binding wire etc. all complete as per direction of E.I.C.
Drawing flood light points on above tubular pole from different feeder line as per direction with supplying on hire basis 400 W sodium vapour lamp and Holder with light fixture as required for the work incl. guarding from 06.01.2020 to 16.1.2020 = 11 days x 10 points
Earthing arrangement by supply 16mm dia earth spike 2 mtr long including supply of galvanized nuts bolts and washer
Temporary installation of 100 A panel board consisting of main switch and all other necessary materials on hire basis with electrical connection from WBSEDCL supply main switch to panel board by 50 sq. mm. 3.50 core PVC al. ar. Cable as per IE roles and as per direction
Guarding the whole installation of the above item for the entire period round the clock i.e. for 3 shifts as per direction of E.I.C. from 07-01-2020 to 16-01-2020
Installation the High Mast pole with fitting fixing of the luminaries (9 Nos.) on the lighting tower and laying of the PVC insulated Aluminium Armoured cable with all interconnection complete with testing of the same as per direction of the EIC.
Railway math to exit of small vehicle car Supply & delivery at site on hire basis steel tubular pole (9mtr) height and erecting the same at different places of jetty ghat in any kind of soil with 2mt. Deep below ground level with proper piling and all protection to aviod accident and each pole should be properly earthed as per direction of EIC.
Supply & delivery at site on hire basis 20 sqmm ACSR conductor for LT distribution line (3 phase 4 wire system) including loading unloading and carrying complete as per direction of EIC.
Supply & delivery at site on hire basis suitable pole clamp for above supplied tubular pole with iron angle fitting complete for 3 ph 4 wire overheads lines as per ISS and IE rules including loading unloading and carrying complete as per direction of EIC. i) Size of angle=50mmx 50mmx6mm thick. ii) Size of shackle strip=61mmx25mm
Supply & delivery at site on hire basis of D type iron clamp set galvanized with necessary GI nuts and bolts washer size 3.5" X 5" dia including loading unloading and carrying complete as per direction of EIC.
Supply & delivery at site on hire basis of porcelain shackle insulator size 3.5" X 3.5” including loading unloading and carrying complete as per direction of EIC.
Fitting fixing of shackle insulator, D type iron clamp and pole clamp complete set in the Tubular pole all completion and erection as per IE rules.
Drawing of overhead line in Horizontal configuration for medium pressure line ACSR including supplying of wire for jumper & insulator and safety device etc. in road side complete as per IE rules.
Supply & drawing of continuous earth wire from end pole to recive pole by Supply on hire basis 12 SWG GI wire with all materials and earth clamp complete as per direction of EIC.
Making earthling arrangement on hire basis by supplying 5/8" dia earth spike of 2mtr long with galvanized bolts nuts sand washer etc. including supplying and fitting fixing 8 nos. SWG GI wire and restoration of the surface duly rammed as per direction and inter connection earth spike to continuous running earth on the top of the Tubular pole.
Making the stay arrangement by 7/8 SWG GI stay wire including supply on hire basis of necessary materials which will be required stone chips, cement, sand, stay rod anchor plate for stay complete as per IE rules ISS rules.
Drawing flood light points on above mention tubular pole as per direction including supplying on hire basis 400 w sodium vapour lamp and holder with light fixture as required for the work incl. guarding from 06.01.2020 to 17.01.2020 =12 Days x 16 pts.
Providing on hire basis including supplying, laying and transportation charges of 3.5 core of 25sq.mm and 50sq.mm PVC/ XLPE insulated Aluminium un armoured cable for different distribution of LT panel board from the panel board of WBSEDCL on hire basis all complete including dismantling the same after completion of Mela as per direction of EIC.
Dismantling of ACSR conductor, shackle insulator, D type iron clamp, PVC Al. Ar. Cable, stay and earthling arrangement & continuous earth wire from first pole to last pole after disconnection all jointing materials from tubular pole after completion of mela works as per direction of EIC.
Lighting Arrangement at different places Drawing LT distribution line (for 3 phase 4 wire and single phase system) on hire basis for medium pressure voltage as per IE rules and ISS by 16 sq.mm to50 sq.mm PVC insulated single cover wire including supplying binding wire etc. all complete as per direction of EIC. a) Toilet at different places (Bungalow, Pilgrim shed, Rail Math, Police barrack& Bus stand No. 1 & 2)
Fitting fixture of 63 amps/120amps main switch and changeover switch etc. including electrical connection with main line and generator line etc. with supply of necessary cable as required on hire basis to complete the work as perdirection of EIC.
Supply and fitting fixing of 2pin 5amps. (for mobile charge) and 3pin 15 amps. (for special purpose)
Drawing flood light points on tubular/PCC pole as per direction including supplying on hire basis 400 w sodium vapour/ Metal lamp and holder with light fixture as required for the work incl. guarding as perdirection of EIC. a) Toilet at different places (Bungalow, Pilgrim shed, Rail Math, Police barrack& Bus stand No. 1 & 2) from 06.01.2020 to 17.01.2020=12 Days x 14 pts.
Drawing LT distribution line (for single phase system) on hire basis for medium pressure voltage as per IE rules and ISS by 16 sq.mm to50 sq.mm PVC insulated single cover wire including supplying binding wire etc. all complete as per direction of EIC. a) 24 Hrs. electric supply for mobile charging, power backup for running different instruments of different deperatment and NGS's at (Bungalow, Pilgrim shed, Police barrack, NGO,s shed, Bus stand No. 1 & 2, different department's rest shed & Narayanpur High School)
Lighting Arrangement at different places Drawing LT distribution line (for 3 phase 4 wire and single phase system) on hire basis for medium pressure voltage as per IE rules and ISS by 16 sq.mm to50 sq.mm PVC insulated single cover wire including supplying binding wire etc. all complete as per direction of EIC.
a. Narayanpur High School (Room + Ground) and Ganeshnagar High School (Ground)
b. Toilet at different places (Bunglow, Pilgrim shed, Rail math, Police barrack & Bus stand No. 1 & 2)
c. Exit road from Rail math (New small vechical stand)
d. Gupta Petorl pump to Bus stand no.-2 Right side of black top road.
d. Parking Zone to Ganeshnagar HP Petrol pump.
Fitting fixture of 63 amps/120amps main switch and changeover switch etc. including electrical connection with main line and generator line etc. with supply of necessary cable as required on hire basis to complete the work as perdirection of EIC.
Supply and fitting fixing of 2pin 5amps. (for mobile charge) and 3pin 15 amps. (for special purpose)
Drawing flood light points on tubular/PCC pole as per direction including supplying on hire basis 400 w sodium vapour/ Metal lamp and holder with light fixture as required for the work incl. guarding as perdirection of EIC.
Narayanpur High School and Ganeshnagar High School Ground from 06.01.2020 to 16.01.2020 =11days x 10 pts.
Toilet at different places (Bunglow, Pilgrim shed, Rail math, Police barrack & Bus stand No. 1 & 2) white metal light from 08.01.2020 to 16.01.2020 = 9days x 11 pts.
Black spot at different Places (Jetty ghat, Bypass road from Bali more to PHE pump house no. -III, Tempurari hospital more to railway math black top road, Entrance of chilchiling Road & Railway Station approach road) from 10.01.2020 to 16.01.2020 =07days x 10 pts.
Gupta Petorl pump to Bus stand no.-2 Right side of black top road from 12.01.2020 to 18.01.2020 =07days x 14 pts
Parking Zone to Ganeshnagar HP Petrol pump from 13.01.2020 to 15.01.2020 =03days x 30 pts.
Supply on the hire basis 4.88 M (16') feet long 1200mm (4") dia. Bottom and 50mm(2") dia. Top salbollah post and erecting in exit road from Rail math (New small vechical stand) as per direction of EIC.
Drawing street light points on above mention post with supply on hire basis 40 watt tube light with fixture complete for illumination incl. guarding the same from 11.01.2020 to 15.01.2020 = 05days x 25 pts.
Drawing the ceiling light points in Narayanpur High School rooms and balcony with supply on hire basis 100 watt bulb, bracket holder etc. and all other necessary matrials requd. to complete the work from 06.01.2020 to 17.01.2020 = 12days x 50 pts.
Drawing the ceiling light points in Pilgrim shed at Railway Math with supply on hire basis 100 watt bulb, bracket holder etc. and all other necessary matrials requd. to complete the work from 13.01.2020 to 17.01.2020 = 05days x 20 pts.
Supply delivery and fitting fixing 16 Amp. rewirieable type kitkat on existing WBSEDCL PCC pole for temporary operating on/off lights after Parking Zone to Ganeshnagar HP Petrol pump
Guarding arrangement of the whole instalation by engaging experienced guard as per direction of EIC in three shifts from 13.01.2020 to 15.01.2020
Construction of 12” X 14’’ hogla shed for operating personal for newly department supply power distribution board by supplying bamboo, polyethin sheet, Hogla, nailon rope etc. all complete as per direction of EIC.
WATER SUPPLY Carrying of the following materials i.e submersible pump set, chlorinator, panel board etc. and all other materials from Namkhana store to Namkhana working site and back to store [Namkhana] after completion of mela including loading & unloading complete.
Carrying charges of 5 HP submersible pump from Akshaynagar store with all accessories to Namkhana working site and back to Diamond Harbour store (5 HP submersible pump) after completion of Mela including loading unloading complete as per direction.
Installation of 5 HP submersible pump motor set at P.H.E. pump house including supply of all necessary materials and withdrawing the same after completion of mela as per direction of E.I.C. including painting the column pipe before lowering the same.
Withdrawing of existing 10 HP submersible pump from the existing TW(Irrigation) as directed by providing derrick arrangement
Installation of 12.5HP submersible pump along with column pipe in well with a position of common delivery arrangement as per direction of EIC and withdrawing the same after completion of mela incl. dismantling of suction and delivery line connection as per direction.
Installation of chlorinating set with supply of all necessary materials required i.e. pits valve, flow indicator, HDPE pipe, clamp etc for the proper installation incl. interconnection with delivery main as per direction and dismantling the same after completion of mela.
Supply of generating set on hire basis and properly installed as per direction o f the EIC from 03-01-2020 to 18-01-2020 = 16 Kw x 16 days
Running and maintenance of generating set by supplying skilled operating staff, fuel, lubricants, sundries & other necessary materials as required for running generating set from 03-01-2020 to 18-01-2020 = 16 days x 16Kw x 2 hrs
Running and maintenance of submersible pump [2nos] in 3 shifts as and when required by engaging skilled operating staff including supply o f necessary sundries from 03-01-2020 to 18-01-2020 = 16 days x 20 hrs x 3 nos
Supply and delivery at site of Calcium Hypoclorite [Ca(OCL)₂] granules with minimum chlorine content 60% to 65% in air tight plastic container. (Make- Shree Rayalaseem Hi Strength Hypo Limited / Hind Pharma / Aquafit / PHE approved) N.B= Test certificate should be submitted at the time of delivery.
Guarding the whole installation of the above item for the entire period round the clock i.e. for 3 shifts as per direction of E.I.C.
Lowering of 10 HP pump in Agri-Irrigation T.W after mela by providing derrick arrangement
Operation maintenance of the 2 nos submersible pumping machinery near Narayanpure High School for the period from 09.01.2019 to 17.01.2019 from 5 PM to 6AM including supply of necessary skilled operating staff with all other necessary materials required for proper running as per direction of the EIC.
Supply and delivery of bleaching powder containing 33 % Chlorine in 25 Kg poly bag. Make- Kanoria/DCM
Drawing LT distribution line (for single phase system) on hire basis for medium pressure voltage as per IE rules and ISS by 16 sq.mm to50 sq.mm PVC insulated single cover wire including supplying binding wire etc. all complete as per direction of EIC.for illumination temporary different toilets and plug point
Supply on the hire basis 4.88 M (16') feet long 100 mm (4") dia. Bottom and 50mm(2") dia. Top salbollah post and erecting in exit road from Rail math (New small vechical stand) as per direction of EIC.for illumination temporary different toilets and plug point
Supply & delivery at site on hire basis steel tubular pole (9mtr) height and erecting the same at different places of jetty ghat in any kind of soil with 2mt. Deep below ground level with proper piling and all protection to aviod accident and each pole should be properly earthed as per direction of EIC. for illumination temporary different toilets and plug point
Drawing the ceiling light points in Narayanpur High School rooms and balcony with supply on hire basis 100 watt bulb, bracket holder etc. and all other necessary matrials requd. to complete the work from 08.01.2020 to 17.01.2020 = 10 days x 352 pts.
Supply and fitting fixing of 2pin 5amps. (for mobile charge) and 3pin 15 amps. (for special purpose)
Drawing flood light points on tubular/PCC pole as per direction including supplying on hire basis 400 w sodium vapour/ Metal lamp and holder with light fixture as required for the work incl. guarding as perdirection of EIC.
for railway math to exit of small vehicle car from 06-01-2020 to 17-01-2020 = 12 days x 9 points
for toilets at different places from 06-01-2020 to 17-01-2020 = 12 days x 8 points
Construction of 12” X 14’’ hogla shed for operating personal for newly department supply power distribution board by supplying bamboo, polyethin sheet, Hogla, nailon rope etc. all complete as per direction of EIC.
Carrying of departmental power distribution panel board, cable from store to different controlling station and return to store including storage after mela as per direction of EIC.
Installation of power distribution panel boards for power supply from WBSEDCL in different substation including electrical inter connection from departmental Panel Board to WBSEDCL Panel Board for LT. Distribution line before 06.1.2018 including proper earthing arrangement complete as per direction of EIC.
Temporary installation of controlling station with fitting of 63 amps. TPN main switch as per direction of E.I.C incl. supply of salbollah post, wooden plank on hire basis with supply of all req. materials complete incl. electrical connection as per direction of E.I.C before 05.01.2020
Departmental Panel board
Panel Board on hire basis of 100 Amps
Making electrical connection from WBSEB supply main switch to different panel board by supplying on hire basis 50 sq. mm. to 3 ½ core P.V.C. Al. Ar. cable as per IE rules incl. supply of all reqd. materials before 05.01.2018 including, earthing as per IE rules and direction of E.I.C (avg. distance from WBSEB supply main switch to panel board is 50 mtr. approx.)
ADD GST @ 12%
NITESH MANAGEMENT
Tarun Kumar Bhattacharya
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .