Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance 23 B NEW MANDI NEW MANDI MUZAFFARNAGAR MUZAFFARNAGAR UTTAR PRADESH 251001 INDIA | MUZAFFARNAGAR | UTTAR PRADESH | 251001 | Admitted-Finance |
| 2 | Admitted-Finance 350 KAMBAL WALA BAGH NEW MANDI MUZAFFARNAGAR UTTAR PRADESH 251001 | MUZAFFARNAGAR | UTTAR PRADESH | 251001 | Admitted-Finance |
Tender Value
₹6.9 L
EMD Value
₹6,900
Closing Date
12 Nov 2021, 12:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
SE ETC MUZAFFARNAGAR
NEAR 132 KV SUB STATION BHOPA ROAD MUZAFFARNAGAR
WORK TENDER
2021_UPTCL_637791_1
ETC MU T 106 2021 22 short term tender
Open Tender
Electrical Works
Item Rate
365 days
saharanpur
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,180
EE ETD MUZAFFANRAGAR
₹6,900
15 Nov 2021
29 Oct 2021
12 Nov 2021
29 Oct 2021
12 Nov 2021
29 Oct 2021
90 days
Amount
Special patrolling and tower top patrolling whenever / whereever required of approx. 99.62 Km. following mentioned 220 KV lines. Patrolling work consists of detection of the defects like missing / theft tower members, hot points, punctured/ flashed over disc insulators, dislocation of vibration dampers/damaged conductor/ earthwire, checking of foundation/stubs and position of trees in the corridor of 35 meter of the line & removing of bird's nests from the towers. Patrolling shall be done regularly on Bi-monthly basis i.e.04 time in a year. approx. line of length as below:- A) 220 KV PGCIL - Khara Line - 63.16 Km. B) 220 KV PGCIL - Sarsawa Line-I - 10.98 Km. C) 220 KV PGCIL - Sarsawa Line-II - 10.98 Km. D) 220 KV Saharanpur-Sarsawa Line - 14.50 Km. Total= 99.62 KM. 398.48x4 Times = 398.48 Km.
Submission of patrolling report on prescribed computerised performa in 3 sets after each patrolling duly binded along with one soft copy.
Repairing of damaged Zebra conductor by using repair sleeves/ bypass defective portion by new conductor piece.
Looping, Chooping & cutting of tree branches in 35 mtr. Corridor of above lines & stacking of above tree branches at proper place far from the line.
Emergency patrolling of above mentioned lines to find out the fault in the lines.
Opening /cutting of nut-bolts of remaining cut pieces of tower members stolen by miscreants to be opened/cut safely with the help of gas cutter/ hacksaw blade including all required labour and T&P for proper completion of work satisfactory.
Fabricating & fixing of tower parts/member from scrap GI angle including cartage of steel angles from the sub station store, punching holes, proper tightening of nut & bolts, punching & chamfering of bolts at different location of above transmission line.
Tack Welding of new nut & bolts
Tightening of jumpers at tension tower per end.
Replacement of damaged/ puncture insulator string at different tower location including cartage of material from store to site and remaining /scrap material back to store. Including all associated work. A) For suspension String
RAHUL ELECTRIC ENGGINEERING WORKS
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .