| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹3.0 LAdmitted-Finance 2142 PURBA PUTIARY DAKHIN PARA KOLKATA 700093 | 24 PARAGANAS SOUTH | WEST BENGAL | 700093 | +0.00% | ₹3.0 L | L1 | Admitted-Finance |
| 2 | L2₹3.1 L+₹11,298 (3.80%)Admitted-Finance 14 SANTOSH ROY ROAD MAIL 7 SANTOSH ROY ROAD KOLKATA 700008 | KOLKATA | WEST BENGAL | 700008 | +3.80% | ₹3.1 L+₹11,298 (3.80%) | L2 | Admitted-Finance |
| 3 | L3₹3.1 L+₹11,863 (3.99%)Admitted-Finance 17B GOBINDA GHOSHAL LANE KOLKATA 700025 | KOLKATA | WEST BENGAL | 700025 | +3.99% | ₹3.1 L+₹11,863 (3.99%) | L3 | Admitted-Finance |
Tender Value
Refer Docs
EMD Value
₹6,000
Closing Date
21 Sept 2026, 5:00 pmClosed
EE-X
28, P.A SHAH ROAD, KOL-33
MAINTENANCE OF PAVER BLOCK FOOTPATH NEAR PREM NOS-188/4,357 P.A.SHAH ROAD ETC IN WD NO- 093, BR-X.
2026_KMC_1041591_1
EEC/093/003/2026-2027
Open Tender
CIVIL WORKS
Percentage
60 days
WARD-093
Please refer Tender documents.
5 documents required · 5 mandatory
₹0
₹6,000
24 Sept 2026
10 Sept 2026
23 Sept 2026
10 Sept 2026
21 Sept 2026
10 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Box cutting or filling in Road embankment in all sorts of soil including spreading the spoils properly over the flank as necessary or on berm to approximate grade & camber and rolling the sub-grade with power roller to proper camber and grade as per direction and satisfaction of Engineer-in-charge including uprooting and removing plants and jungles when and where necessary. (a) Depth up to 150 mm. | 309.7 | SQM | 14.4 | ₹4,459.68 |
| 2 | Box cutting or filling in Road embankment in all sorts of soil including spreading the spoils properly over the flank as necessary or on berm to approximate grade & camber and rolling the sub-grade with power roller to proper camber and grade as per direction and satisfaction of Engineer-in-charge including uprooting and removing plants and jungles when and where necessary. (b) For each additional Depth of 150mm and part thereof. | 14 | SQM | 19 | ₹266 |
| 3 | Supplying, spreading and compacting Sand to required thickness, in layers not exceeding 150 mm to proper gradient and camber, inundating each layer by water and packing and ramming layer by layer to achieve desired compaction, including lighting, guarding, barricading and making adequate earthen bundh where necessary, curing with water as per direction, mending cracks and depressions by ramming wherever necessary. Note:- Add cost at site of the materials to arrive at the complete rate. The compaction factor for dry, clean sand may be taken as 0.835. (The payment is to be made on the basis of finished compacted volume). (b) For Medium Sand | 2.1 | M3 | 1,275.29 | ₹2,678.11 |
| 4 | BUILDING WORKS(D) Flooring..A. ORIGINAL WORKS..(3)Supplying and laying Polythene Sheet (150gm / sq.m.) over damp proof course or below flooring or roof terracing or in foundation or in foundation trenches. | 14 | SQM | 24 | ₹336 |
| 5 | ORDINARY CEMENT CONCRETE ( MIX 1:2:4 ) WITH GRADED STONE CHIPS ( 20 MM NOMINAL SIZE) EXCLUDING SHUTTERING AND REINFORCEMENT, IF ANY, IN GROUND FLOOR AS PER RELEVANT IS CODES | 23.23 | M3 | 5,498 | ₹1,27,718.54 |
| 6 | Laying of interlocking Paver Blocks as per approved design over 20-30mm th medium yellow sand bed with true to line,lavelling,proper compaction with vibrator etc. with jointing with kerb/edge should be made with Cement Concrete (1:2:4)etc. as per the direction of the Engineer-in-charge and including cost of materials,labour etc. complete | 807.09 | SQM | 124 | ₹1,00,079.53 |
| 7 | Taking out stone slab of kerb & channel of road side drain and stacking as directed. a) vertical kerb stone. | 30 | MTR | 8.17 | ₹245.1 |
| 8 | Taking out stone slab of kerb & channel of road side drain and stacking as directed. b) flat channel stone. | 30 | MTR | 8.17 | ₹245.1 |
| 9 | Resetting of Stone Slabs of kerb & channel of road side drain to correct line and level including cement pointing (1:2). a) Vertical Kerb | 30 | MTR | 21.34 | ₹640.2 |
| 10 | Resetting of Stone Slabs of kerb & channel of road side drain to correct line and level including cement pointing (1:2). b) flat channel stone. | 30 | MTR | 18.24 | ₹547.2 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.44 MB
TF.pdf
Tender Documents • 0.59 MB
civil_new.pdf
Additional Documents • 4.88 MB
BOQ_2557304.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .