| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹70.6 LAdmitted-Finance R O DISKIT | LEH LADAKH | LADAKH | 194101 | L1 | Admitted-Finance | |
| 2 | L2₹70.7 L+₹10,291.40 (0.15%)Admitted-Finance | L2 | Admitted-Finance | |
| 3 | L3₹71.7 L+₹1.1 L (1.63%)Admitted-Finance BOGDANG | L3 | Admitted-Finance | |
| 4 | L4₹81.2 L+₹10.7 L (15.1%)Admitted-Finance | L4 | Admitted-Finance | |
| 5 | L5₹85.8 L+₹15.3 L (21.7%)Admitted-Finance | L5 | Admitted-Finance |
| Sl No | Description | Qty | Unit | M/S MEHDI ALI L3 | M/S TASHI ANGCHUK L1 | phunchok tundup L2 | M/S HAJI MOHAMMAD ALI L5 | M/S ALI SHAH L4 |
|---|---|---|---|---|---|---|---|---|
| 1.00 | Earth work in bulk excavation by mechanical means (hydraulic excavator) over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge.All kinds of soil | 3,227.54 | Cum | 100 ₹3,22,754 Lowest | 100 ₹3,22,754 Lowest | 100 ₹3,22,754 Lowest | 150 ₹4,84,131 | 120 ₹3,87,304.8 |
| 2.00 | Oridinary Rock | 993.88 | Cum | 150 ₹1,49,082 Lowest | 150 ₹1,49,082 Lowest | 150 ₹1,49,082 Lowest | 200 ₹1,98,776 | 270 ₹2,68,347.6 |
| 3.00 | Rard Rock. | 744.81 | Cum | 500 ₹3,72,405 Lowest | 500 ₹3,72,405 Lowest | 500 ₹3,72,405 Lowest | 620 ₹4,61,782.2 | 670 ₹4,99,022.7 |
| 4.00 | Earth work in excavation by mechanical means (hydraulic excavator) in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed, within a lead of 50 metres: All kinds of soil : | 427.5 | Cum | 200 ₹85,500 | 100 ₹42,750 Lowest | 100 ₹42,750 Lowest | 130 ₹55,575 | 200 ₹85,500 |
| 5.00 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead upto 50 m and lift upto 1.5 m.incl carriage | 1,344.25 | Cum | 80 ₹1,07,540 Lowest | 80 ₹1,07,540 Lowest | 100 ₹1,34,425 | 125 ₹1,68,031.25 | 130 ₹1,74,752.5 |
| 6.00 | Random Rubble masonry with hard stone in foundation and plinth including leveling up with cement concrete 1:6:12 (1 Cement : 6 coarse sand : 12 graded stone aggregate 20mm nominal size) upto plinth level and curing complete with: Cement mortar 1:6 (1 Cement : 6 coarse sand) incl carriage | 549.16 | Cum | 3,528.19 ₹19,37,539 Lowest | 3,750 ₹20,59,350 | 3,690 ₹20,26,400.4 | 4,900 ₹26,90,884 | 4,300 ₹23,61,388 |
| 7.00 | Dry random rubble masonry with hard stone in foundation and plinth:without bond stone incl carriage | 833.56 | Cum | 3,000 ₹25,00,680 | 2,900 ₹24,17,324 Lowest | 3,000 ₹25,00,680 | 2,900 ₹24,17,324 Lowest | 3,085.66 ₹25,72,083.4 |
| 8.00 | R R masonry with hard stone in foundation and plinth in mud mortar. incl carriage | 414 | Cum | 3,000 ₹12,42,000 Lowest | 3,000 ₹12,42,000 Lowest | 3,100 ₹12,83,400 | 4,000 ₹16,56,000 | 3,000 ₹12,42,000 Lowest |
| 9.00 | Providing & laying damp-proof Course 40 mm thick with cement concrete 1:2:4 (1 cement:2 coarse sand: 4 graded stone agg 12.5 mm nominal size) and curing complete incl carriage | 1,104 | sqm | 400 ₹4,41,600 | 300 ₹3,31,200 | 200 ₹2,20,800 Lowest | 380 ₹4,19,520 | 450 ₹4,96,800 |
| 10.00 | Felling trees of the girth (measured at a height of 1 m above ground level) including cutting of trunk and branches, removing the roots and stacking of serviceable material
and disposal of unserviceable material. Beyond 30 cm girth upto and including 60 cm girth incl carriage | 50 | no | 100 ₹5,000 Lowest | 100 ₹5,000 Lowest | 100 ₹5,000 Lowest | 350 ₹17,500 | 350 ₹17,500 |
Tender Value
₹1.0 Cr
EMD Value
₹2.0 L
Closing Date
16 Sept 2022, 4:00 pmClosed
executive engineer PWD RnB nobra
executive engineer PWD RnB nobra
Construction of link road to Ompo Gonpa via Makzing to Stogozing Sumoor
2022_PWD_7579_3
PWD RnB/N/111 2022-23
Open Tender
Civil Works - Others
Item Rate
90 days
Nubra
please read NIT
7 documents required · 7 mandatory
₹3,000
Payable To executive engineer PWD RnB nobra
₹2.0 L
Yes
28 Sept 2022
9 Sept 2022
17 Sept 2022
9 Sept 2022
16 Sept 2022
9 Sept 2022
Amount
Earth work in bulk excavation by mechanical means (hydraulic excavator) over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge.All kinds of soil
Oridinary Rock
Rard Rock.
Earth work in excavation by mechanical means (hydraulic excavator) in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed, within a lead of 50 metres: All kinds of soil :
Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead upto 50 m and lift upto 1.5 m.incl carriage
Random Rubble masonry with hard stone in foundation and plinth including leveling up with cement concrete 1:6:12 (1 Cement : 6 coarse sand : 12 graded stone aggregate 20mm nominal size) upto plinth level and curing complete with: Cement mortar 1:6 (1 Cement : 6 coarse sand) incl carriage
Dry random rubble masonry with hard stone in foundation and plinth:without bond stone incl carriage
R R masonry with hard stone in foundation and plinth in mud mortar. incl carriage
Providing & laying damp-proof Course 40 mm thick with cement concrete 1:2:4 (1 cement:2 coarse sand: 4 graded stone agg 12.5 mm nominal size) and curing complete incl carriage
Felling trees of the girth (measured at a height of 1 m above ground level) including cutting of trunk and branches, removing the roots and stacking of serviceable material and disposal of unserviceable material. Beyond 30 cm girth upto and including 60 cm girth incl carriage
Beyond 60 cm girth upto and including 120 cm girth.
phunchok tundup
M/S MEHDI ALI
M/S ALI SHAH
M/S HAJI MOHAMMAD ALI
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.80 MB
BOQ_18295.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .