| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹5.9 LAdmitted-Fee/PreQual/Technical/Finance | +0.00% | ₹5.9 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹6.5 L+₹53,389.92 (9.00%)Admitted-Fee/PreQual/Technical/Finance | +9.00% | ₹6.5 L+₹53,389.92 (9.00%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
Refer Docs
EMD Value
₹5,932
Closing Date
19 Aug 2026, 5:00 pmClosed
Commissioner, Brahmapur Municipal Corporation
Brahmapur Municipal Corporation, Brahmapur
Const. of Community center near Om Public School at Baikuntha Nagar -2nd line, Ward No. 24, BeMC, near Om Public School at Baikuntha Nagar -2nd line, Ward No. 24, BeMC, MPLAD Fund-2023-24 (S.O. No.
2026_ORULB_137887_13
BMC(BAM)/331/2026-27
Open Tender
Civil Works - Others
Percentage
75 days
BRAHMAPUR
Please refer Tender documents.
2 documents required · 2 mandatory
₹4,720
₹5,932
Yes
24 Aug 2026
4 Aug 2026
20 Aug 2026
4 Aug 2026
19 Aug 2026
4 Aug 2026
4 Aug 2026 - 12 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantlling and removing R.C.C. columns beams slab, staircase landing, lintels including stacking the useful materials for re-use and removing the debries within 50mtr lead. (Data for 1 Cum) | - | Cum | 1,475.61 | - |
| 2 | Earth work Excavation in all kind of soil in F&P within intial lead and lift including rough dressing and levelling the ground etc. complete. | - | Cum | 266.09 | - |
| 3 | Conveying the excavated earth by mechnical carriage from the site where it has been deposited after excavation & disposal of the same within 5 km. distance at suitable locations as per direction of Engineer-in-Charge etc. complete. | - | Cum | 276.01 | - |
| 4 | Supply and filling the F & P with filling sand of approved quality with well watered & rammed including cost, conveyance, royalty & all taxes, etc., complete. | - | Cum | 1,538.19 | - |
| 5 | C.C. (1:4:8) using 40 mm size cbhg metal including laying, compacting, curing, with all cost, conveyance, royalty & taxes, etc., complete. | - | Cum | 5,261.69 | - |
| 6 | R.C.C M20 using 12 mm to 20 mm size HG Crusher Broken chips including centering and shuttering for RCC works including hoisting and laying, compacting, curing with all cost, conveyance, royalty & taxes, etc., complete.
Column foundation | - | Cum | 6,765.52 | - |
| 7 | Lintel | - | Sqm | 12,754.43 | - |
| 8 | Column | - | SQm | 16,351.16 | - |
| 9 | Roof slab | - | SQm | 13,683.56 | - |
| 10 | Supplying, fitting & placing uncoated HYSD reinforcement including cutting, bending,binding & placing the steel rods as per drawing & technical specifications with cost of binding wire 18 to 20 gauges, etc., complete. work.) | - | Cum | 8,075.08 | - |
stage.html
html • 0.02 MB
finance_604615.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.55 MB
DTCN.pdf
Tender Documents • 1.63 MB
BOQ_604615.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .