| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹23.8 LAccepted-AOC A PO JANDABAHAL DHARAMPUR TALCHER DIST ANGUL ODISHA 759100 | TALCHER | ANGUL | ODISHA | 759100 | ₹23.8 L Quoted ₹20.2 L | L1 | Accepted-AOC Accepted and awarded by competent authority |
| 2 | L2₹23.4 L+₹3.2 L (16.0%)Rejected-Finance AT PO KISHOREGANJ PATNA ANAND BAZAR TALCHER TOWN DIST ANGUL ODISHA 759107 | TALCHER TOWN | ANGUL | ODISHA | 759107 | ₹23.4 L+₹3.2 L (16.0%) | L2 | Rejected-Finance Since the bidder is not L1 |
| 3 | L3₹24.2 L+₹4.0 L (19.7%)Rejected-Finance AT PO VERUBANIA KANKILI TALCHER DIST ANGUL ODISHA | ANGUL | ANGUL | ODISHA | ₹24.2 L+₹4.0 L (19.7%) | L3 | Rejected-Finance Since the bidder is not L1 |
Tender Value
₹44.5 L
EMD Value
₹55,700
Closing Date
9 Apr 2026, 5:00 pmClosed
STAFF OFFICER (CIVIL), LINGARAJ AREA
SO (CIVIL), OFFICE OF THE GM, LINGARAJ AREA TALCHER, ANGUL_759102, ODISHA, INDIA
Providing and laying Precast RCC Blocks at both sides of Silo Level Crossing (near Gate No-2) and NTPC Level Crossing, Retaining wall in the curve of Local Sale road to avoid scouring including provision of approach path to NTPC Station Building at L
2026_MCL_357683_1
MCL/GM(LA)/e-Tender/ SO(C)/25-26/138 dt.28.03.2026
Open Tender
Civil Works - Others
Percentage
60 days
Lingaraj OCP
Please refer Tender documents.
3 documents required · 3 mandatory
₹55,700
30 May 2026
30 Mar 2026
10 Apr 2026
30 Mar 2026
9 Apr 2026
30 Mar 2026
30 Mar 2026 - 2 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| - | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, for all lift, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. All kinds of soil. | - | cum | - | - |
| - | Excavation in Soil using Hydraulic Excavator and Tippers with disposal upto 1000 metres. (Excavation for roadwork in soil with hydraulic excavator including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and transporting to the embankment location with all lifts and lead upto 1000m as per relevant clauses of section - 300 of specifications) | - | cum | - | - |
| - | Supplying and filling in plinth with sand under floors, including watering, ramming, consolidating and dressing complete. | - | cum | - | - |
| - | Providing and laying in position excluding cement concrete of level: specified grade the cost of centering and shuttering - All work up to plinth. 1:3:6 (1 Cement : 3 coarse sand (zone-Ill) derived from natural sources : 6 graded stone aggregate 20mm nominal size derived from natural sources) | - | cum | - | - |
| - | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level :1:1.5:3(1 cement: 1.5 coarse sand (zone-Ill) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources) | - | cum | - | - |
| - | Providingand laying inpositionexcludingcement concreteof level: specifiedgrade thecost of centering and shuttering - All work up to plinth 1:1.5:3 (1Cement: 1.5 coarse sand (zoneIll) derived from natural sources: 3graded stone aggregate 20 mm nominal size derived from natural sources) | - | cum | - | - |
| - | Providing, hoisting and fixing above plinth level up to floor five level precast reinforced cement concrete work in string courses, bands, copings, bed plates, anchor blocks, plain window sills and the like, including the cost of required centering, shuttering but excluding cost of reinforcement with 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources). | - | cum | - | - |
| - | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level. hermo-Mechanically Treated bars | - | kg | - | - |
| - | Total impact of GST plus Labour Cess [@ 1 % (BOCW Cess to be deducted from the RA bill as per the value of the work progress)] for the purpose of CTC | - | Nos | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 2.46 MB
Tendernotice_2.pdf
PDF • 1.34 MB
BOQ_370546.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .