| Sl No | Description | Qty | Unit | Elumalai K L1 | BALAJI P L2 |
|---|---|---|---|---|---|
| 1.00Construction of Lab building at PUM School in Kanikiluppai Panchayat in Arni Block under CFSIDS scheme 2024-2025 | |||||
| 1.01 | Earth work excavation for foundation in all classes of soils except hard rock requiring blasting with initial lead and lift etc including levelling the site etc. complete with standard specification in hard stiff cllay, black cotton soil, hard fred earth, shale murums, gravel stoneyearth, and earth mixed with 50 % fair sized boulders, and hard graveily soil, in foundation.as per SS 20 B | 59.76 | Cum | 260 ₹15,537.60 | 265 ₹15,836.40 |
| 1.02 | Earth work excavation for foundation in all classes of soils except hard rock requiring blasting with initial lead and lift etc including levelling the site etc. complete with standard specification in hard stiff cllay, black cotton soil, hard fred earth, shale murums, gravel stoneyearth, and earth mixed with 50 % fair sized boulders, and hard graveily soil, in foundation.as per SS 20 B | 5.82 | Cum | 246 ₹1,431.72 | 250 ₹1,455 |
| 1.03 | Collection and supply of gritty gravel from appd quarry including cost and conveyance of all materials to site including all labour charges for filling etc.complete, | 34.42 | Cum | 277 ₹9,534.34 | 280 ₹9,637.60 |
| 1.04 | Cement Concrete 1:4:8 Using 40mm ISS size Hand Broken granite stone jelly including labour charges for mixing concrete watering and laying the concrete in layers not more the 15 cm thick compacting etc complete complying with standard specification etc complete. | 10.95 | Cum | 5,157 ₹56,469.15 | 5,160 ₹56,502 |
| 1.05 | Brick work in CM 1:5 mix using country bricks ground moulded of size 23 x 11 x 7 Cm for the following including curing etc., complete complying with standard specifications. | 24.91 | Cum | 5,969 ₹1.5 L | 5,970 ₹1.5 L |
| 1.06Supplying and Erection centering for sides and soffiots including necessaary supports and strutting as directed by the departmental officers. Rate for 10m2 for the following items (RCC floor slab, roff slab, Rectangular / Square, Tee/ Ell beams, Lintels, | |||||
| 1.07 | Below ground level | 50.85 | Sqm | 517 ₹26,289.45 | 520 ₹26,442 |
| 1.08 | Above ground level | 144.26 | Sqm | 1,034 ₹1.5 L | 1,036 ₹1.5 L |
| 1.09 | Cement Concrete 1:1½:3 using 20 mm ISS HBG metal for all RCC item of works excluding cost of reinforcement and fabricating charges, centering and shuttering but icluding curing and providing fixtures like fan clamps in the RCC floor or roof.te. | 30.83 | Cum | 8,354 ₹2.6 L | 8,355 ₹2.6 L |
Tender Value
₹17.3 L
EMD Value
₹17,300
Closing Date
14 Oct 2024, 5:00 pmClosed
Block Development Officer(B.Pt)
Block Development Office(B.Pt) Arni
Construction of Lab building at PUM School in Kanikiluppai Panchayat in Arni Block under CFSIDS scheme 2024-2025
2024_RDTN_490721_1
Roc.No.4364/2024 Date 03.09.2024 ARNI62
Open Tender
Civil Works - Buildings
90 days
Arni
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹17,300
27 Dec 2025
4 Oct 2024
14 Oct 2024
4 Oct 2024
14 Oct 2024
4 Oct 2024
Amount
Construction of Lab building at PUM School in Kanikiluppai Panchayat in Arni Block under CFSIDS scheme 2024-2025
Earth work excavation for foundation in all classes of soils except hard rock requiring blasting with initial lead and lift etc including levelling the site etc. complete with standard specification in hard stiff cllay, black cotton soil, hard fred earth, shale murums, gravel stoneyearth, and earth mixed with 50 % fair sized boulders, and hard graveily soil, in foundation.as per SS 20 B
Earth work excavation for foundation in all classes of soils except hard rock requiring blasting with initial lead and lift etc including levelling the site etc. complete with standard specification in hard stiff cllay, black cotton soil, hard fred earth, shale murums, gravel stoneyearth, and earth mixed with 50 % fair sized boulders, and hard graveily soil, in foundation.as per SS 20 B
Collection and supply of gritty gravel from appd quarry including cost and conveyance of all materials to site including all labour charges for filling etc.complete,
Cement Concrete 1:4:8 Using 40mm ISS size Hand Broken granite stone jelly including labour charges for mixing concrete watering and laying the concrete in layers not more the 15 cm thick compacting etc complete complying with standard specification etc complete.
Brick work in CM 1:5 mix using country bricks ground moulded of size 23 x 11 x 7 Cm for the following including curing etc., complete complying with standard specifications.
Supplying and Erection centering for sides and soffiots including necessaary supports and strutting as directed by the departmental officers. Rate for 10m2 for the following items (RCC floor slab, roff slab, Rectangular / Square, Tee/ Ell beams, Lintels,
Below ground level
Above ground level
Cement Concrete 1:1½:3 using 20 mm ISS HBG metal for all RCC item of works excluding cost of reinforcement and fabricating charges, centering and shuttering but icluding curing and providing fixtures like fan clamps in the RCC floor or roof.te.
Supplying and Fabricating and placing in position MS Steel or ribbed for steel for all reinforced cement concrete works as per the design given including cost of steel and blinding wire all floors etc., complete complying with standard specification.
Plastering with CM 1:5, 12mm thick over the cement concrete for floor finish including curing etc., complete complying with standard specifications and as directed by the departmental officers.
Speical Plastering in Cement mortar 1:3 mix 10 mm thick including cost and conveyace of all materials and all labour charges,etc,
Paving the Top of roof with Solar reflective ceramic tiles of size 305 x 305 x 7mm thick of approved quality and colour laid in Cement mortar 1:3 (One cement and three M.Sand) 12mm thick and pointed with tile grout (Nitotile Grout or equivalent) and cement in the ratio of 1:3 for joint, curing etc., complete complying with standard specification and as directed by the departmental officers. (The make and brand of the tiles should be got approved by the Executive Engineer before use on works)
Paving the floor with kota stone slab of size 600 x 600 of 18 / 20mm (un-polished) in all floors laid in of cement mortor 1:3 (one cement three M.Sand), 20mm thick and pointed with colour cement neatly including polishing with polishing stone and oxalic acid etc., so as to perfectly smooth and glossy and including hire charges for polishing machine and power consumption charges etc. The kota stone slabs and other materials to be used shall be got approved by the Executive Engineer concerned before use on work, etc., complete as per standard speicification.
Paving the flooring with special type of flooring tiles (Cement based Hydraulically pressed Anti skid tiles (20mm thick) in CM 1:3, 20mm thick
Providing bala painting
Painting two coat using readymixed emulsion paint of approved quality and colour over priming coat (New) including cost and all labour charges etc. complete
Black Board Paint Two Coats with Approved Cement Paint over Cement Plastered surface including cost and conveyance of materials and labour charges etc complete.
Painting two coats over new iron works using ready mixed enamel paint with one coat of red oxide primer including cost and conveyance of paint and all labour charges etc complete
Towards the cost of steel door of size 1.20 mx2.10 m including all charges etc.
Supply of Fabrication of Steel Window Size 1.20 X 1.50 m - 6 No including cost
Light & Fan Point SD.no.20
Supply&Fixing of Tube Light SD.no.88
CFL SD.no.80
Supply & Fixing of Fan SD.no.110
Power Plug Point SD.no.39
GREEN BORD
Service Connection SD.no.64
Supplying and fixing P.V.C rainwater down fall pipe of 100mm dia with necessary shoes, bends,& clamps etc.,
Construction of Chappal Block outside the class
Brick work in CM 1:5 mix using country bricks ground moulded of size 22 x 11 x 7cm for the following including curing etc., complete complying with standard specifications.
Plastering with CM 1:5, 12mm thick.in all floors including curing etc., complete complying with standard specifications and as directed by the departmental officers.
Painting two coats with Emulsion Paint over the one coat of Priming coat including cost and conveyance of all materials to site and all labour charges etc complete
Providing cuddapah slab 38 to 40mm for shelfs etc., all complete
labour charges for fixing cuddapah slab 38 to 40mm for shelfs etc., all complete
Cup board work for Teacher
Brick work in CM 1:5 mix using country bricks ground moulded of size 22 x 11 x 7cm for the following including curing etc., complete complying with standard specifications.
Plastering with CM 1:5, 12mm thick.in all floors including curing etc., complete complying with standard specifications and as directed by the departmental officers.
Providing cuddapah slabs 20/30mm thick including curing etc.,
Painting two coats with Emulsion Paint over the one coat of Priming coat including cost and conveyance of all materials to site and all labour charges etc complete
Providing Cup Board Shutter with frame using water Proof plywood of 19mm thick over which laminated sheet of 0.8mm thick fixed inside the shutter (Sl.No 124)
Cup board work for Students
Brick work in CM 1:5 mix using country bricks ground moulded of size 22 x 11 x 7cm for the following including curing etc., complete complying with standard specifications.
Plastering with CM 1:5, 12mm thick.in all floors including curing etc., complete complying with standard specifications and as directed by the departmental officers.
Providing cuddapah slabs 20/30mm thick including curing etc.,
Painting two coats with Emulsion Paint over the one coat of Priming coat including cost and conveyance of all materials to site and all labour charges etc complete
GST Amount for providing Service to Government Contract Works for the above Construction Works. {GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
BALAJI P (BID ID -1160931)
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid