Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹22.1 LAccepted-Finance RANGAT | 1 | Accepted-Finance L1 |
Tender Value
₹24.2 L
EMD Value
₹48,330
Closing Date
8 Feb 2024, 3:00 pmClosed
Executive Engineer PRI Lucknow Mayabunder
Office of the Executive Engineer PRI Mayabunder
Construction of Black Top Road from Janakpur village near Smti. Laxmi Devi house to Janakpur village ward No.10 under Gram Panchayat, Rangat. (L-192.00 mtrs.)
2024_RDPRI_13191_1
104/EE/PRI/MB/23-2024
Open Tender
Civil Works - Roads
Works
180 days
Rangat
Refer Tender Document
5 documents required · 5 mandatory
₹500
Yes
Executive Engineer PRI N and MAD Mayabunder
₹48,330
Yes
12 Feb 2024
30 Jan 2024
8 Feb 2024
30 Jan 2024
8 Feb 2024
30 Jan 2024
Amount
Excavation and Carriage of earth by Mechanical Transport for an average lead of 1 KM including loading, unloading filling, watering & leveling consiladation with roller of 8 to 10 tonne etc., complete.
Preparation and consolidation of sub grade with power road roller of 8 to 12 tonne capacity after excavating earth to an average of 22.5 cm depth, dressing to camber and consolidating with road roller including making good the undulations etc. and re-rolling the sub grade and disposal of surplus earthwith lead upto 50 metres.
Supplying and stacking at site.
90 mm to 45 mm size stone aggregate
63 mm to 45 mm size stone aggregate
Stone screening 13.2 mm nominal size (Type A)
Stone screening 11.2 mm nominal size (Type B)
Moorum
Laying, spreading and compacting stone aggregate of specified sizes to WBM specifications in uniform thickness, hand picking, rolling with 3 wheeled road/vibratory roller 8-10 tonne capacity in stages to proper grade and camber, applying and brooming requisite type of screening / binding material to fill up interstices of coarse aggregate, watering and compacting to the required density .
Providing, laying, spreading and compacting graded stone aggregate (size range 53 mm to 0.075 mm ) to wet mix macadam (WMM) specification including premixing the material with water at OMC in for all leads & lifts, laying in uniform layers with mechanical paverfinisher in sub- base / base course on well prepared surface and compacting with vibratory roller of 8 to 10 tonne capacity to achievethe desired density, complete as per specifications and directions of Engineer-in-Charge.
Providing and applying tack coat using hot straight run bitumen of grade VG - 10, including heating the bitumen, spraying the bitumen with mechanically operated spray unit fitted on bitumen boiler, cleaning and preparing the existing road surface as per specifications :
On W.B.M @ 0.75Kg/Sqm
Providing and laying Bitumen Penetration Macadam with hard stone aggregate of quality, size and grading as specified, with bitumen of suitable penetration grade, including required key aggregate as specified, spreading coarse aggregate with the help of self propelled/ tipper tail mounted aggregate spreader and applying bitumen by a pressure distributor and then spreading key aggregate with the help of aggregate spreader complete, including consolidation with road roller of minimum 8 to 10 tonne capacity to achieve specified values of compaction and surface accuracy :
For 50mm compacted thickness using coarse aggregate of size 50-20 mm graded @ 0.60 cum per 10 sqm key aggregate of size 12.5 mm graded @ 0.15 cum per 10 sqm. With paving asphalt grade VG - 10 @ 50 kg/ 10 sqm.
Providing and laying Bituminous concrete using crushed stone aggregates of specified grading, premixed with bituminous binder and filler, transporting the hot mix to work site by tippersl, laying with paver finisher equiped with electronic sensor to the required grade, level and alignment and rolling with smooth wheeled, vibratory and tandem rollerto achieve the desired compaction and density as per specification, complete and as per directions of Engineer-in-Charge. 40/50 mm compacted thickness with bitumen of grade VG-30@ 5.5% (Percentage by weight of total mix) and lime filler @ 3% (Persentage by weight of Aggregate) and waste plastic additive @8% (Percentage by weight of bitumen) prepared in batch Type Hot Mix Plant of 100-120 TPH capacity.
Routine Maintenance after completion of construction works (Lump-sum Amount for each year per Km.)
For 1st year (Rs. 8,947.49) For 2nd year (Rs. 26,340.42) For 3rd year (Rs. 35,981.62) For 4th year (Rs. 45,997.11) For 5th year (Rs. 56,402.32) Maintenance Cost (Fixed) Total 5 year maintenance cost = Rs. 1,73,668.96) (Same rate to be quoted i.e Rs. 1,73,668.96)
For Routine Maintenance, the unit rate indicated by the Authority shall apply. The bidder is requried to accept these rates, Further, the payment shall be performance based.
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .