Loading
Loading…
Loading…
Tender Value
Refer Docs
Closing Date
13 Jul 2022, 3:00 pmClosed
PR & CC
Evaluation Criteria: Schedule wise lowest cost basisAward Criteria: As per tender document
22000182-HD-10157
22000182-HD-10157
Open Tender
Unknown (Unspecified Location)
₹0
Exempted
13 Jul 2022
22 Jun 2022
13 Jul 2022
13 Jul 2022
22 Jun 2022 - 30 Jun 2022
29 Jun 2022
| Item No | Item Title | Description | Qty | Unit |
|---|---|---|---|---|
| 1 | DESIGN&SPLY OF STORAGE | DESIGN&SPLY OF STORAGE — CNG STORAGE CASCADE MOBILE-4500 WL: DESIGN, ENGINEERING, MANUFACTURING, ASSEMBLY, SUPPLY, INSPECTION AND TESTING AT WORKS AND AT SITE (IF REQUIRED), TRANSPORTATION AND UNLOADING AT SITE OF CNG MOBILE STORAGE CASCADE OF MINIMUM 4500 WATER LITER CAPACITY AT 15 DEG.C TEMPERATURE OF SUM TOTAL OF CYLINDERS FOR FILLING AND STORING OF CNG AT 250 BAR(G) AND SUITABLE FOR OPERATIONAL TEMPERATURE RANGING FROM -10 DEG.C TO 55 DEG.C WITH SINGLE BANK AS SPECIFIED IN TECHNICAL SPECIFICATION INCLUSIVE OF SERVICES AS STIPULATED IN THE TENDER DOCUMENT ALONG WITH MANDATORY SPARE. THE CASCADE SHALL BE GIVEN WITH SINGLE INLET/OUTLET AND AN ISOLATION VALVE SHALL BE PROVIDED IN THE MANIFOLD. THE MANIFOLD SHALL BE TERMINATED WITH A 1/2 INCH QUICK CONNECT BODY (FEMALE COUPLER) AND STEM (MALE COUPLER) (END CONNECTION: 1/2 INCH NPT (F) FOR BODY MATERIAL:SS 316; RATED PRESSURE:5000 PSI AT 70 DEG F, TEMPERATURE:0 DEG F TO 400 DEG F). Schedule 2 Manadatory: No | - | Each |
| 1 | DESIGN AND SPLY OF CNG | DESIGN AND SPLY OF CNG — CNG STORAGE CASCADE 3000 WATER LITER: DESIGN, ENGINEERING, MANUFACTURING, ASSEMBLY, SUPPLY, INSPECTION AND TESTING AT WORKS AND AT SITE (IF REQUIRED), TRANSPORTATION AND UNLOADING AT SITE OF CNG STORAGE CASCADE OF MINIMUM 3000 WATER LITER CAPACITY OF SUM TOTAL OF CYLINDERS AT 15 DEG C TEMPERATURE FOR FILLING AND STORING OF CNG AT 250 BAR (G) AND SUITABLE FOR -10 DEG C TO 55 DEG C GAS TEMPERATURE WITH 3 BANK AS SPECIFIED IN TECHNICAL SPECIFICATION INCLUSIVE OF SERVICES AS STIPULATED IN THE TENDER DOCUMENT ALONG WITH MANDATORY SPARE. Schedule 3 Manadatory: No | - | Each |
| 1 | DESIGN&SPLY OF STORAGE | DESIGN&SPLY OF STORAGE — CNG STORAGE CASCADE MOBILE-4500 WL: DESIGN, ENGINEERING, MANUFACTURING, ASSEMBLY, SUPPLY, INSPECTION AND TESTING AT WORKS AND AT SITE (IF REQUIRED), TRANSPORTATION AND UNLOADING AT SITE OF CNG MOBILE STORAGE CASCADE OF MINIMUM 4500 WATER LITER CAPACITY AT 15 DEG.C TEMPERATURE OF SUM TOTAL OF CYLINDERS FOR FILLING AND STORING OF CNG AT 250 BAR(G) AND SUITABLE FOR OPERATIONAL TEMPERATURE RANGING FROM -10 DEG.C TO 55 DEG.C WITH SINGLE BANK AS SPECIFIED IN TECHNICAL SPECIFICATION INCLUSIVE OF SERVICES AS STIPULATED IN THE TENDER DOCUMENT ALONG WITH MANDATORY SPARE. THE CASCADE SHALL BE GIVEN WITH SINGLE INLET/OUTLET AND AN ISOLATION VALVE SHALL BE PROVIDED IN THE MANIFOLD. THE MANIFOLD SHALL BE TERMINATED WITH A 1/2 INCH QUICK CONNECT BODY (FEMALE COUPLER) AND STEM (MALE COUPLER) (END CONNECTION: 1/2 INCH NPT (F) FOR BODY MATERIAL:SS 316; RATED PRESSURE:5000 PSI AT 70 DEG F, TEMPERATURE:0 DEG F TO 400 DEG F). | - | Each |
| 2 | DESIGN&SPLY OF STORAGE | DESIGN&SPLY OF STORAGE — CNG STORAGE CASCADE MOBILE-4500 WL: DESIGN, ENGINEERING, MANUFACTURING, ASSEMBLY, SUPPLY, INSPECTION AND TESTING AT WORKS AND AT SITE (IF REQUIRED), TRANSPORTATION AND UNLOADING AT SITE OF CNG MOBILE STORAGE CASCADE OF MINIMUM 4500 WATER LITER CAPACITY AT 15 DEG.C TEMPERATURE OF SUM TOTAL OF CYLINDERS FOR FILLING AND STORING OF CNG AT 250 BAR(G) AND SUITABLE FOR OPERATIONAL TEMPERATURE RANGING FROM -10 DEG.C TO 55 DEG.C WITH SINGLE BANK AS SPECIFIED IN TECHNICAL SPECIFICATION INCLUSIVE OF SERVICES AS STIPULATED IN THE TENDER DOCUMENT ALONG WITH MANDATORY SPARE. THE CASCADE SHALL BE GIVEN WITH SINGLE INLET/OUTLET AND AN ISOLATION VALVE SHALL BE PROVIDED IN THE MANIFOLD. THE MANIFOLD SHALL BE TERMINATED WITH A 1/2 INCH QUICK CONNECT BODY (FEMALE COUPLER) AND STEM (MALE COUPLER) (END CONNECTION: 1/2 INCH NPT (F) FOR BODY MATERIAL:SS 316; RATED PRESSURE:5000 PSI AT 70 DEG F, TEMPERATURE:0 DEG F TO 400 DEG F). Schedule 4 Manadatory: No | - | Each |
| 1 | DESIGN&SPLY OF STORAGE | DESIGN&SPLY OF STORAGE — CNG STORAGE CASCADE MOBILE-4500 WL: DESIGN, ENGINEERING, MANUFACTURING, ASSEMBLY, SUPPLY, INSPECTION AND TESTING AT WORKS AND AT SITE (IF REQUIRED), TRANSPORTATION AND UNLOADING AT SITE OF CNG MOBILE STORAGE CASCADE OF MINIMUM 4500 WATER LITER CAPACITY AT 15 DEG.C TEMPERATURE OF SUM TOTAL OF CYLINDERS FOR FILLING AND STORING OF CNG AT 250 BAR(G) AND SUITABLE FOR OPERATIONAL TEMPERATURE RANGING FROM -10 DEG.C TO 55 DEG.C WITH SINGLE BANK AS SPECIFIED IN TECHNICAL SPECIFICATION INCLUSIVE OF SERVICES AS STIPULATED IN THE TENDER DOCUMENT ALONG WITH MANDATORY SPARE. THE CASCADE SHALL BE GIVEN WITH SINGLE INLET/OUTLET AND AN ISOLATION VALVE SHALL BE PROVIDED IN THE MANIFOLD. THE MANIFOLD SHALL BE TERMINATED WITH A 1/2 INCH QUICK CONNECT BODY (FEMALE COUPLER) AND STEM (MALE COUPLER) (END CONNECTION: 1/2 INCH NPT (F) FOR BODY MATERIAL:SS 316; RATED PRESSURE:5000 PSI AT 70 DEG F, TEMPERATURE:0 DEG F TO 400 DEG F). Schedule 5 Manadatory: No | - | Each |
| 1 | DESIGN AND SPLY OF CNG | DESIGN AND SPLY OF CNG — CNG STORAGE CASCADE 3000 WATER LITER: DESIGN, ENGINEERING, MANUFACTURING, ASSEMBLY, SUPPLY, INSPECTION AND TESTING AT WORKS AND AT SITE (IF REQUIRED), TRANSPORTATION AND UNLOADING AT SITE OF CNG STORAGE CASCADE OF MINIMUM 3000 WATER LITER CAPACITY OF SUM TOTAL OF CYLINDERS AT 15 DEG C TEMPERATURE FOR FILLING AND STORING OF CNG AT 250 BAR (G) AND SUITABLE FOR -10 DEG C TO 55 DEG C GAS TEMPERATURE WITH 3 BANK AS SPECIFIED IN TECHNICAL SPECIFICATION INCLUSIVE OF SERVICES AS STIPULATED IN THE TENDER DOCUMENT ALONG WITH MANDATORY SPARE. | - | Each |
| 2 | DESIGN AND SPLY OF CNG | DESIGN AND SPLY OF CNG — CNG STORAGE CASCADE 3000 WATER LITER: DESIGN, ENGINEERING, MANUFACTURING, ASSEMBLY, SUPPLY, INSPECTION AND TESTING AT WORKS AND AT SITE (IF REQUIRED), TRANSPORTATION AND UNLOADING AT SITE OF CNG STORAGE CASCADE OF MINIMUM 3000 WATER LITER CAPACITY OF SUM TOTAL OF CYLINDERS AT 15 DEG C TEMPERATURE FOR FILLING AND STORING OF CNG AT 250 BAR (G) AND SUITABLE FOR -10 DEG C TO 55 DEG C GAS TEMPERATURE WITH 3 BANK AS SPECIFIED IN TECHNICAL SPECIFICATION INCLUSIVE OF SERVICES AS STIPULATED IN THE TENDER DOCUMENT ALONG WITH MANDATORY SPARE. Schedule 6 Manadatory: No | - | Each |
| 1 | DESIGN&SPLY OF CASCADE- | DESIGN&SPLY OF CASCADE- — CNG STORAGE CASCADE MOBILE-4500 WL: DESIGN, ENGINEERING, MANUFACTURING, ASSEMBLY, SUPPLY, INSPECTION AND TESTING AT WORKS AND AT SITE (IF REQUIRED), TRANSPORTATION AND UNLOADING AT SITE OF CNG MOBILE STORAGE CASCADE OF MINIMUM 4500 WATER LITER CAPACITY AT 15 DEG.C TEMPERATURE OF SUM TOTAL OF CYLINDERS FOR FILLING AND STORING OF CNG AT 250 BAR(G) AND SUITABLE FOR OPERATIONAL TEMPERATURE RANGING FROM -10 DEG.C TO 55 DEG.C WITH SINGLE BANK AS SPECIFIED IN TECHNICAL SPECIFICATION INCLUSIVE OF SERVICES AS STIPULATED IN THE TENDER DOCUMENT ALONG WITH MANDATORY SPARE. THE CASCADE SHALL BE GIVEN WITH SINGLE INLET/OUTLET AND AN ISOLATION VALVE SHALL BE PROVIDED IN THE MANIFOLD. THE MANIFOLD SHALL BE TERMINATED WITH A 1/2 INCH QUICK CONNECT BODY (FEMALE COUPLER) AND STEM (MALE COUPLER) (END CONNECTION: 1/2 INCH NPT (F) FOR BODY MATERIAL:SS 316; RATED PRESSURE:5000 PSI AT 70 DEG F, TEMPERATURE:0 DEG F TO 400 DEG F). Schedule 7 Manadatory: No | - | Each |
| 1 | DESIGN AND SPLY OF CNG | DESIGN AND SPLY OF CNG — CNG STORAGE CASCADE 3000 WATER LITER: DESIGN, ENGINEERING, MANUFACTURING, ASSEMBLY, SUPPLY, INSPECTION AND TESTING AT WORKS AND AT SITE (IF REQUIRED), TRANSPORTATION AND UNLOADING AT SITE OF CNG STORAGE CASCADE OF MINIMUM 3000 WATER LITER CAPACITY OF SUM TOTAL OF CYLINDERS AT 15 DEG C TEMPERATURE FOR FILLING AND STORING OF CNG AT 250 BAR (G) AND SUITABLE FOR -10 DEG C TO 55 DEG C GAS TEMPERATURE WITH 3 BANK AS SPECIFIED IN TECHNICAL SPECIFICATION INCLUSIVE OF SERVICES AS STIPULATED IN THE TENDER DOCUMENT ALONG WITH MANDATORY SPARE. Schedule 8 Manadatory: No | - | Each |
| 1 | DESIGN AND SPLY OF CNG | DESIGN AND SPLY OF CNG — CNG STORAGE CASCADE 3000 WATER LITER: DESIGN, ENGINEERING, MANUFACTURING, ASSEMBLY, SUPPLY, INSPECTION AND TESTING AT WORKS AND AT SITE (IF REQUIRED), TRANSPORTATION AND UNLOADING AT SITE OF CNG STORAGE CASCADE OF MINIMUM 3000 WATER LITER CAPACITY OF SUM TOTAL OF CYLINDERS AT 15 DEG C TEMPERATURE FOR FILLING AND STORING OF CNG AT 250 BAR (G) AND SUITABLE FOR -10 DEG C TO 55 DEG C GAS TEMPERATURE WITH 3 BANK AS SPECIFIED IN TECHNICAL SPECIFICATION INCLUSIVE OF SERVICES AS STIPULATED IN THE TENDER DOCUMENT ALONG WITH MANDATORY SPARE. Schedule 9 Manadatory: No | - | Each |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
22000182-HD-10157.pdf
TENDER_DOCUMENT • 20.67 MB
Download all tender documents and submit your bid