| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.1 LAccepted-AOC AT SOUTARDIH DHORI BASTI PO BERMO DIST BOKARO | BOKARO | JHARKHAND | 825102 | L1 | Accepted-AOC TECHNO COMMERCIALLY QUALIFIED | |
| 2 | Rejected-Technical 268 KARGALI BAZAR BERMO BOKARO 829104 JHARKHAND | BOKARO | JHARKHAND | 829104 | - | Rejected-Technical DOCUMENTS NOT VERIFIED | |
| 3 | Rejected-Technical GROUND FLOOR HEALTH CENTRAL 1 NO RAJA BUNGLOW PO DHORI DIST BOKARO PIN 825102 JHARKHAND | DHORI | BOKARO | JHARKHAND | 825102 | - | Rejected-Technical DOCUMENTS NOT VERIFIED |
Tender Value
Refer Docs
EMD Value
₹1,400
Closing Date
29 Dec 2023, 12:00 pmClosed
AKHIL UJJWAL,PE (EnM),SDOCM
OFFICE OF THE PROJECT OFFICER,SDOCM,DHORI AREA,CCL
Rewinding and repairing of 90HP and 50HP 3 phase induction motor 440v kirlosker make installed at Kalyani river side and cromption greaves make installed at Turiyo colony pumping sub-station under SDOCM
2023_CCL_296543_1
SDOCM/PE(EnM)/NIT/23-24/24 dt.20.12.2023
Open Tender
Electrical and Maintenance Works
Item Wise
10 days
SDOCM
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,400
18 Jan 2024
20 Dec 2023
30 Dec 2023
21 Dec 2023
29 Dec 2023
21 Dec 2023
21 Dec 2023 - 29 Dec 2023
Amount
(Part – A )For 90 HP motor 440 v at kalyani river side
Part rewinding of motor with super enamel copper wire (including deducting of scrap value @ 60 %)
Insulating material cost of sl.1
Labour cost of sl no. 1
End cover bearing housing repair by CI welding and machining as per size
Providing of copper lugs as per required size
Induction motor complete dismantling after repairing and overhauling its complete assembling / commissioning with both side bearing greasing and testing at site on peak load
Add supervision & Incidental cost @ 15 % on above
(Part – B) For Repairing of 50 HP 3 phase induction motor 440 V at Turiyo colony
Complete motor dismantling and then washing by thinner and petrol stator & rotor both
Complete motor cleaning heating and varnishing
Crimping of copper lugs of 150 AMP and insulating at connection point of cable lead
Providing of ball bearing no 6409
Labour cost / overhauling charges including assembling commissioning with both side bearing greasing and fitting at site on peak load
Add supervision & Incidental cost
Total impact of GST for the purpose of CTC
M/s Kiran Electrical works
S S VIRAT & COMPANY
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .