| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹16.0 CrAccepted-AOC | ₹16.0 Cr | L1 | Accepted-AOC L1 |
| 2 | L2₹16.7 CrRejected-Finance | ₹16.7 Cr | L2 | Rejected-Finance L2 |
| 3 | Rejected-Technical PLOT 9 BESIDES HANUMAN MANDER RAMASREYA KA PURWA GOMITI NAGAR LUCKNOW | LUCKNOW | LUCKNOW | UTTAR PRADESH | - | - | Rejected-Technical NOT QUALIFY WITH TECHNICAL SPECIFICATION |
| Sl No | Description | Qty | Unit | M/s Kaiser Construction Engineers and Contractor L2 | YADAV AND SONS L1 |
|---|---|---|---|---|---|
| 1.00 | E/w in correcting internal section & restoration of Faizabad branch including all lead and lift with proper disposal. | 24,34,908.3 | Cum | 50 ₹12,17,45,415 | 45 ₹10,95,70,873.5 Lowest |
| 2.00 | Dressing of excavated earth /silt at Faizabad Branch. | 20,69,672.06 | Cum | 10 ₹2,06,96,720.6 Lowest | 10 ₹2,06,96,720.6 Lowest |
| 3.00 | Daula dressing at Faizabad branch including manual compaction and dressing to profile including all lifts. | 2,21,862 | Sqm | 9 ₹19,96,758 | 8 ₹17,74,896 Lowest |
| 4.00 | Supplying & Fixing Boundry Pillar along Faizabad Between Km. 22.000 to Km. 126.200 at 200.00 m interval in both side. | 1,044 | No. | 5,341 ₹55,76,004 | 5,300 ₹55,33,200 Lowest |
| 5.00 | Dismantling reinforced cement concrete including stacking of dismantled materials as directed by Engineer-in-charge within a distance of 60M. | 902.37 | Cum | 816 ₹7,36,333.92 | 800 ₹7,21,896 Lowest |
| 6.00 | Centering & shutering for R.C.C. work including all cost of material, labour and T&P etc. required for porper completion of the work. | 2,093.63 | Sqm | 1,015 ₹21,25,034.45 | 1,000 ₹20,93,630 Lowest |
| 7.00 | Steel Bending, Binding, Cutting and Placing in proper position including all cost of labour and material T&P etc. required for porper completion of the work. | 71,043.79 | Kg | 79 ₹56,12,459.41 | 72 ₹51,15,152.88 Lowest |
| 8.00 | Laying RCC of concrete grade 1:1:2 with coarse sand and stone grit size 4.75 mm to 20 mm and cement , Including all cost of material, labour and T&P etc. required for porper completion of the work. | 937.17 | Cum | 11 ₹10,308.87 Lowest | 11,000 ₹1,03,08,870 |
| 9.00 | Laying CC of concrete grade 1:1.5:3 with coarse sand and stone grit size 4.75 mm to 20 mm and cement , Including all cost of material, labour and T&P etc. required for porper completion of the work. | 204.01 | cum | 645 ₹1,31,586.45 Lowest | 9,900 ₹20,19,699 |
| 10.00 | Brick masonry in 1:4 Cement and coarse sand mortar using class 150 bricks complete in all respect including all leads, lifts, all cost of material, labour and T&P etc. required for porper completion of the work. | 236.33 | Cum | 10,082 ₹23,82,679.06 | 7,500 ₹17,72,475 Lowest |
Tender Value
Refer Docs
EMD Value
₹34.9 L
Closing Date
19 May 2026, 11:00 amClosed
SUPERINTENDING ENGINEER
O/O SE XITH CIRCLE IW AYODHYA
AS PER NIT01 LOT01
2026_UPIDC_1147738_1
01/SE-XI/2026-27
Open Tender
Civil Works
Item Rate
270 days
AYODHYA
Please refer Tender documents.
2 documents required · 2 mandatory
₹8,850
₹34.9 L
O/O SE XITH CIRCLE IW AYODHYA
19 Aug 2026
13 May 2026
19 May 2026
13 May 2026
19 May 2026
13 May 2026
13 May 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | E/w in correcting internal section & restoration of Faizabad branch including all lead and lift with proper disposal. | 24,34,908.3 | Cum | - | - |
| 2 | Dressing of excavated earth /silt at Faizabad Branch. | 20,69,672.06 | Cum | - | - |
| 3 | Daula dressing at Faizabad branch including manual compaction and dressing to profile including all lifts. | 2,21,862 | Sqm | - | - |
| 4 | Supplying & Fixing Boundry Pillar along Faizabad Between Km. 22.000 to Km. 126.200 at 200.00 m interval in both side. | 1,044 | No. | - | - |
| 5 | Dismantling reinforced cement concrete including stacking of dismantled materials as directed by Engineer-in-charge within a distance of 60M. | 902.37 | Cum | - | - |
| 6 | Centering & shutering for R.C.C. work including all cost of material, labour and T&P etc. required for porper completion of the work. | 2,093.63 | Sqm | - | - |
| 7 | Steel Bending, Binding, Cutting and Placing in proper position including all cost of labour and material T&P etc. required for porper completion of the work. | 71,043.79 | Kg | - | - |
| 8 | Laying RCC of concrete grade 1:1:2 with coarse sand and stone grit size 4.75 mm to 20 mm and cement , Including all cost of material, labour and T&P etc. required for porper completion of the work. | 937.17 | Cum | - | - |
| 9 | Laying CC of concrete grade 1:1.5:3 with coarse sand and stone grit size 4.75 mm to 20 mm and cement , Including all cost of material, labour and T&P etc. required for porper completion of the work. | 204.01 | cum | - | - |
| 10 | Brick masonry in 1:4 Cement and coarse sand mortar using class 150 bricks complete in all respect including all leads, lifts, all cost of material, labour and T&P etc. required for porper completion of the work. | 236.33 | Cum | - | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.07 MB
NIT01DOCUMENT.pdf
Tender Documents • 3.33 MB
BOQ_2147745.xls
BOQ • 0.35 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].