Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹58.5 LAdmitted-Fee/PreQual/Technical/Finance | -35.65% | ₹58.5 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹60.3 L+₹1.7 L (2.91%)Admitted-Fee/PreQual/Technical/Finance | -33.78% | ₹60.3 L+₹1.7 L (2.91%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | L3₹60.4 L+₹1.9 L (3.19%)Admitted-Fee/PreQual/Technical/Finance | -33.60% | ₹60.4 L+₹1.9 L (3.19%) | L3 | Admitted-Fee/PreQual/Technical/Finance |
| 4 | L4₹62.1 L+₹3.5 L (6.03%)Admitted-Fee/PreQual/Technical/Finance | -31.77% | ₹62.1 L+₹3.5 L (6.03%) | L4 | Admitted-Fee/PreQual/Technical/Finance |
| 5 | L5₹67.5 L+₹9.0 L (15.4%)Admitted-Fee/PreQual/Technical/Finance | -25.77% | ₹67.5 L+₹9.0 L (15.4%) | L5 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹91.0 L
EMD Value
₹1.8 L
Closing Date
3 Jul 2026, 4:00 pmClosed
Executive Engineer RnB Division Budgam
Engineering complex Budgam
Construction of Sr. Secondary Art and Craft Library ,Science Lab and Computer Room At Govt. Higher Sec. School Shogpora and Construction of Sr. Secondary Physics, Chemistry and Biology Lab at Govt. Higher Sec. School Shogpora.
2026_PWDJK_313694_1
NIT_No_38_DB_2026-27
Open Tender
Civil Works
Percentage
183 days
Shogapora Budgam
Please refer Tender documents.
3 documents required · 3 mandatory
₹1,600
Executive Engineer RnB Division Budgam
₹1.8 L
7 Jul 2026
25 Jun 2026
4 Jul 2026
25 Jun 2026
3 Jul 2026
25 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (hydraulic excavator) in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed, within a lead of 50 metres:
2.9.1 All kinds of soil : | - | cum | 256.85 | - |
| 2 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead upto 50 m and lift upto 1.5 m. | 1 | cum | 218.4 | ₹218.18 |
| 3 | Supplying and filling in plinth with fine sand under floors including watering, raming consolidation and dressing complete | 13.76 | cum | 1,204.5 | ₹16,573.92 |
| 4 | Providing supplying and stacking of soling including laying ramming complete as per engineer incharge | - | cum | 1,000 | - |
| 5 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: M7.5 | 1 | cum | 5,202.9 | ₹5,197.7 |
| 6 | Providing and laying in position specified grade of reinforced cement concrete including curing but excluding the cost of centering, shuttering, finishing and reinforcement. All works upto plinth level (M20) | 1 | cum | 7,788.4 | ₹7,780.61 |
| 7 | Reinforced cement concrete work in walls (any thickness) including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and
struts upto floor five level including curing but excluding cost of centering shuttering, finishing and reinforcement.
1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) | - | cum | 9,395.7 | - |
| 8 | Reinforced cement concrete work in beams, suspended floors, roofs having slope upto 15°, landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases upto five level including curing but excluding the cost of centring, shuttering, finishing and reinforcement with 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) | 1 | cum | 9,821.85 | ₹9,812.03 |
| 9 | providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: M15 | 1 | Cum | 6,591.25 | ₹6,584.66 |
| 10 | Brick work with common burnt clay (non-modular) bricks of class designation 7.5 in super structure including all carriages | 1 | cum | 9,027.2 | ₹9,018.17 |
stage.html
html • 0.03 MB
finance_1015444.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.24 MB
BOQ_1015444.xls
BOQ • 0.71 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .