Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹8.8 LAccepted-AOC NATUNDANGA BANAGRAM BARDHAMAN 713381 WEST BENGAL INDIA | BARDHAMAN | BARDHAMAN | WEST BENGAL | 713381 | ₹8.8 L | L1 | Accepted-AOC L1 |
| 2 | L2₹9.0 L+₹22,192.26 (2.53%)Rejected-Finance 4 DALURBANDH PANDAVESWAR PANDAVESWAR BARDHAMAN WEST BENGAL 713346 UDYAM WB 03 0006114 | PASCHIM BARDHAMAN | WEST BENGAL | 713346 | ₹9.0 L+₹22,192.26 (2.53%) | L2 | Rejected-Finance L2 |
| 3 | Rejected-Technical | - | - | Rejected-Technical As per TCR |
| Sl No | Description | Qty | Unit | MAZUMDER ELECTRICAL L2 | ENERGY ENGINEERING L1 |
|---|---|---|---|---|---|
| 1.00Repairing of 150 HP, 550V, DOL Starter at Madhaipur Colliery . (Inclusive of EPF/CMPF) | |||||
| 1.01 | Repairing of Isolator with pro Moving contact | 1 | No | 7,587 ₹7,587 | 7,400 ₹7,400 Lowest |
| 1.02 | Bush Insulator terminal with brass stud | 12 | No | 390 ₹4,680 | 380 ₹4,560 Lowest |
| 1.03 | Amp Metre with CT ratio 200/5 A flush type | 1 | No | 820 ₹820 | 800 ₹800 Lowest |
| 1.04 | Thermal over load L&T make complete Set | 1 | No | 8,407 ₹8,407 | 8,200 ₹8,200 Lowest |
| 1.05 | CT 200/5 A | 3 | No | 1,538 ₹4,614 | 1,500 ₹4,500 Lowest |
| 1.06 | ML12 Magnatic Contractor Unit 550V | 1 | M | 41,627 ₹41,627 | 40,600 ₹40,600 Lowest |
| 1.07 | 70 SQMM Copper Flexible Cable with Socket | 15 | No | 656 ₹9,840 | 640 ₹9,600 Lowest |
| 1.08 | Push Switch | 4 | No | 231 ₹924 | 225 ₹900 Lowest |
| 1.09 | ELR Relay with Matching CBCT | 1 | No | 14,149 ₹14,149 | 13,800 ₹13,800 Lowest |
Tender Value
₹8.8 L
EMD Value
₹11,000
Closing Date
4 May 2026, 6:00 pmClosed
Area Engineer(E and M)
Office of the General Manager Pandaveswar Area , P.O. Pandaveswar, Dist.-Paschim Bardhaman, West Bengal-713346
Repairing of 150HP,550V,DOL Starter and Repairing of 250 KVA,11KV/550V Transformer at Madhaipur UG, Repairing of 250KVA,11KV/440V and 50KVA,3.3KV/440V Lighting Transformer and Repairing of 150HP,550V,1440RPM Electrical Induction Motor at MSAM UG
2026_ECL_358727_1
GM-PND/EandM/26-27/18/2023 dated 22/04/2026
Open Tender
Electrical and Maintenance Works
Item Rate
30 days
Madhaipur Colliery and MSAM Colliery
Please refer Tender documents.
4 documents required · 4 mandatory
₹11,000
2 Aug 2026
24 Apr 2026
5 May 2026
24 Apr 2026
4 May 2026
24 Apr 2026
24 Apr 2026 - 27 Apr 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Repairing of 150 HP, 550V, DOL Starter at Madhaipur Colliery . (Inclusive of EPF/CMPF) | |||||
| 1.01 | Repairing of Isolator with pro Moving contact | 1 | No | - | - |
| 1.02 | Bush Insulator terminal with brass stud | 12 | No | - | - |
| 1.03 | Amp Metre with CT ratio 200/5 A flush type | 1 | No | - | - |
| 1.04 | Thermal over load L&T make complete Set | 1 | No | - | - |
| 1.05 | CT 200/5 A | 3 | No | - | - |
| 1.06 | ML12 Magnatic Contractor Unit 550V | 1 | M | - | - |
| 1.07 | 70 SQMM Copper Flexible Cable with Socket | 15 | No | - | - |
| 1.08 | Push Switch | 4 | No | - | - |
| 1.09 | ELR Relay with Matching CBCT | 1 | No | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Tendernotice_1.pdf
PDF • 2.41 MB
BOQ_371601.xls
BOQ • 0.35 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .