| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹33.4 LAccepted-AOC | ₹33.4 L | L1 | Accepted-AOC ok |
| 2 | L2₹34.2 LRejected-AOC | ₹34.2 L | L2 | Rejected-AOC Raject |
| Sl No | Description | Qty | Unit | M/s. ALAMELU BOREWELLS L1 | B SUGUNA L2 |
|---|---|---|---|---|---|
| 1.001.ProvidingCC road at Sanguthala nagar main road and cross street in senneerkuppam Panchayat | |||||
| 2.00 | Earth work excavation and depositing on bank with initial lead and lift in hard stiff clay and hard gravelly soil as per SS20B for narrow foundations. Etc,.complete. | 13.35 | CUM | 245 ₹3,271 | 285 ₹3,805 |
| 3.00 | Construction of Granular Sub base by providing well graded material (25 mm to 4.75 mm IRC HBG metal @ 65 %,4.75 to 2.36mm IRC HBG metal @20%&2.36 mm below IRC HBG metal @15%)& (the material passing 425 microns sieve shall have liquid limit and plasticity index not more than 25 & 6% repectively) spreading in uniform layers with motor grader on prepared surface mixing by mix in place method with rotovator at OMC and compacting with three wheel 80-100 KN capacity and finished in accordance with the requirements of the specification and thickness as per approved plans or as directed by the Engineer (Mix -in - place method) . | 152.4 | CUM | 1,745 ₹2.7 L | 1,850 ₹2.8 L |
| 4.00 | Cement Concrete 1:4:8 using 40mm HBG metal including cost and conveyance of all materials to site and all labour charges etc. complete | 172.71 | CUM | 5,875 ₹10.1 L | 5,900 ₹10.2 L |
| 5.00 | CC 1:3:6 mix using 20 mm metal including cost and conveyance of all materials to site mixing, placing, curing and all labour charges etc. complete | 60.19 | CUM | 6,574 ₹4.0 L | 6,750 ₹4.1 L |
| 6.00 | CC 1:2:4 mix using 20 mm metal including cost and conveyance of all materials to site mixing, placing, curing and all labour charges etc. complete | 129.53 | CUM | 7,352 ₹9.5 L | 7,500 ₹9.7 L |
| 7.00 | Towards Centring charges for planks including rend and labour charges etc. complete. | 523.4 | sqm | 376 ₹2.0 L | 400 ₹2.1 L |
| 8.00 | Supply of Bitumen pads including cost and conveyance of all materials to site and all labour charges etc. complete. | 32.39 | Sqm | 150 ₹4,859 | 200 ₹6,478 |
| 9.00 | GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package}
(Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD) | 1 | GST Amount | 5,10,035.58 ₹5.1 L | 5,21,699.4 ₹5.2 L |
Tender Value
₹33.9 L
EMD Value
₹34,000
Closing Date
18 Sept 2025, 3:00 pmClosed
Block development Office VP
Poonamallee union
Providing CC road Sanguntha nagar main road and Cross street in Senneerkuppam Panchayat
2025_RDTN_601356_1
General fund Vp 01
Open Tender
Civil Works
Poonamallee
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹34,000
Yes
Block development Office VP
18 Dec 2025
8 Sept 2025
18 Sept 2025
8 Sept 2025
18 Sept 2025
9 Sept 2025
9 Sept 2025
Amount
1.ProvidingCC road at Sanguthala nagar main road and cross street in senneerkuppam Panchayat
Earth work excavation and depositing on bank with initial lead and lift in hard stiff clay and hard gravelly soil as per SS20B for narrow foundations. Etc,.complete.
Construction of Granular Sub base by providing well graded material (25 mm to 4.75 mm IRC HBG metal @ 65 %,4.75 to 2.36mm IRC HBG metal @20%&2.36 mm below IRC HBG metal @15%)& (the material passing 425 microns sieve shall have liquid limit and plasticity index not more than 25 & 6% repectively) spreading in uniform layers with motor grader on prepared surface mixing by mix in place method with rotovator at OMC and compacting with three wheel 80-100 KN capacity and finished in accordance with the requirements of the specification and thickness as per approved plans or as directed by the Engineer (Mix -in - place method) .
Cement Concrete 1:4:8 using 40mm HBG metal including cost and conveyance of all materials to site and all labour charges etc. complete
CC 1:3:6 mix using 20 mm metal including cost and conveyance of all materials to site mixing, placing, curing and all labour charges etc. complete
CC 1:2:4 mix using 20 mm metal including cost and conveyance of all materials to site mixing, placing, curing and all labour charges etc. complete
Towards Centring charges for planks including rend and labour charges etc. complete.
Supply of Bitumen pads including cost and conveyance of all materials to site and all labour charges etc. complete.
GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package} (Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD)
B SUGUNA (BID ID -1460820)
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_718864.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid