| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹13.8 LAccepted-Finance | ₹13.8 L | L1 | Accepted-Finance FINANCIALLY ACCEPTED |
| 2 | L2₹14.2 LAccepted-Finance | ₹14.2 L | L2 | Accepted-Finance FINANCIALLY ACCEPTED |
| 3 | L3₹14.6 LAccepted-Finance MU PO JAWAHAR CHOWK RAJAPUR TA RAJAPUR JI RATNAGIRI | RAJAPUR | RATNAGIRI | MAHARASHTRA | 416702 | ₹14.6 L | L3 | Accepted-Finance FINANCIALLY ACCEPTED |
| 4 | L4₹14.8 LAccepted-Finance TALUKA RAJAPUR DISTRICT RATNAGIRI | RAJAPUR | RATNAGIRI | MAHARASHTRA | ₹14.8 L | L4 | Accepted-Finance FINANCIALLY ACCEPTED |
| 5 | L5₹15.2 LAccepted-Finance | ₹15.2 L | L5 | Accepted-Finance FINANCIALLY ACCEPTED |
Tender Value
₹16.4 L
EMD Value
₹20,000
Closing Date
7 Mar 2026, 5:00 pmClosed
Executive Engineer Works Department ZP Ratnagiri
Dr.Babasaheb Ambedkar Bhavan Ground Floor Executive Engineer Works Department Ratnagiri ZP Ratnagiri
Constructing Sakhar Ghadiwadi, Boudhawadi, Bhandarwadi to Gothivare parwadi road,V.R.214,Km 3/000 to 3/800 Tal. Rajapur, For the Year 2025 - 26.
2026_RATNA_1282769_4
RZP/WD-Ratnagiri/E-Ten Un EMP ENGR-19/25-26
Open Tender
Civil Works - Roads
180 days
Rajapur
Please refer Tender documents.
4 documents required · 4 mandatory
₹1,000
₹20,000
18 Apr 2026
28 Feb 2026
9 Mar 2026
28 Feb 2026
7 Mar 2026
28 Feb 2026
Item No. 1 :- Excavation for roadway in earth,soil of all sorts, sand, gravel or soft murum including dressing section to the required grade,camber and side slope sand conveying the excavated materials with al l lifts upto alead of 50m.and spreading for embankment or stacking as directed.
Item No. 2 :-Excavation for roadway in hard rock by wedging and chiselling or line drilling including dressing section to the required grade,camber and side slope sand conveying the excavated materials with all lifts upto a lead of 50m.and spreading for embankment o rstacking as directed.
Item No. 3 :- Conveying materials obtained from road cutting including all lifts, laying in layers of 20cm to 30cm. breaking clods, dressing to the required lines, curves, grades and section, watering and compacting to not less than 97% of standard Proctor density for a lead of over 50m. to 300m. inclusive from the site of excavation to the site of deposition as directed.
Item No. 4 :- Providing earth work in embankment with approved materials obtained from other sources upto lead of 50m. including all lifts, laying in layers of 20cm. to 30cm. thickness breaking clods, dressing to the required lines, curves, grades & section, watering and compaction with vibratory roller with V-Sat attachment to achieve not less than 97 % of standard proctor density etc. complete ( Material obtained from Other sources)
Item No. 5 :- Excavation for Catch / Side Water Gutter in Soft soil to the Specifided Section including Stacking the Excavated Stuff in a Regular Bund & Disposing Off Unsuitable or Excess Stuff as Directed all sorts of soil.
Item No. 6:- Excavation for Catch / Side Water Gutter in Hard rock to the Specifided Section including Stacking the Excavated Stuff in a Regular Bund & Disposing Off Unsuitable or Excess Stuff as Directed all sorts of soil.
Item No. 7 :- Providing & Laying Cement Concrete Pipe of IS 458:2003 NP - 2 Class of --- mm Diameter in Proper Line, Level & Slope including providing & fixing Collars in Cement Mortar 1:2 & Curing etc. complete.
SSR P/I 81 /11.09 600 mm dia. Pipe Add 10 % For Hilly Area = 2733.00 X 10 % = 3006.30
Item No.8:- Supplying of 80 mm laterite Stone Metal at the Road Side for Metal including Conveying & Stacking etc. complete. (50 mtr. Initial Lead) By Breaking Boulders (Hand Broken)
A)with Avalible material
B) with New material
Item No.9:- Supplying of 60 mm laterite Stone Metal at the Road Side for Metal including Conveying & Stacking etc. complete. (50 mtr. Initial Lead) By Breaking Boulders (Hand Broken)
A)with Avalible material
B) with New material
Item No.10 :- Supplying Soft Murum / Kankar at the Road Site including Conveying & Staking etc complete.
A)with Avalible material
B) with New material
Item No. 11 :- Spreading Oversize 40 mm / 50 mm / 60 mm / 80 mm Laterite / Trap Metal including Sectioning etc. complete.
Item No.12 :- Spreading Hard Murum for Side Width etc. complete.
Item No. 13 :- Compacting 80 mm Trap Metal with Power Roller including Necessary Labour, Materials & Artificial Watering etc. complete.
Item No. 14 :- Compacting 60 mm Trap Metal with Power Roller including Necessary Labour, Materials & Artificial Watering etc. complete.
Item No. 16:- Royalty Charges for Material Utilized for this Work
2)Laterite Stone Metal and murum
Item No. 19 :- QUALITY CONTROL MATERIAL TESTING CHARGES
A) Trap Metal for W. B. M., B. B. M., Carpet & Seal Coat & Concrete
1) Water Absorption, Specific Gravity, Impact Value / Crushing Value Test etc. Group Test
2) Sieve Analysis Test
Please Enable Macros to View BoQ information
stage.html
html • 0.05 MB
technical_2206172.pdf
techsummary_2206172.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.96 MB
Tendernotice_2.pdf
PDF • 0.19 MB
B1sakhar.pdf
Tender Documents • 2.04 MB
BOQ_2206172.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid