Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹310.6 CrAccepted-AOC 409 4TH FLOOR ISCON ELEGANCE NR JAIN TEMPLE PRAHALADNAGAR CROSS ROAD S G HIGHWAY AHMEDABAD 380015 | AHMEDABAD | AHMEDABAD | GUJARAT | 380015 | 1 | Accepted-AOC 1st lowest | |
| 2 | 2₹317.1 Cr+₹6.5 Cr (2.11%)Rejected-AOC 101 TO 104 PRABHAT CENTRE ANNEX SECTOR THANE 410614 | THANE | THANE | MAHARASHTRA | 410614 | 2 | Rejected-AOC 2nd lowest | |
| 3 | 3₹524.2 Cr+₹213.6 Cr (68.8%)Rejected-AOC 1 7 80 TO 87 MITHONA TOWERS 1 PRENDERGHAST ROAD SECUNDERABAD HYDERABAD TELANGANA 500003 | HYDERABAD | TELANGANA | 500003 | 3 | Rejected-AOC 3rd lowest | |
| 4 | Rejected-Technical | - | Rejected-Technical NOT QUALIFIED IN TECHNICAL BID | |
| 5 | Rejected-Technical BK NO 758 BEHIND CHOPRA COURT ULHASNAGAR 421003 DIST THANE MAHARASHTRA | THANE | THANE | MAHARASHTRA | 421003 | - | Rejected-Technical NOT QUALIFIED IN TECHNICAL BID |
Tender Value
₹361.6 Cr
EMD Value
₹3.6 Cr
Closing Date
21 Jan 2023, 2:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Superintending Engineer
Office of SE, UPJN (Urban), Charu Chandrapuri Colony near DIG Bungalow Gorakhpur
Rejuvenation of Gordhaiya nala and Ramgarhtal Lake including I and D and treatment under AMRUT 2.0
2022_UPJNM_747096_1
541/V-15/78 DT 08.11.2022
Open Tender
Construction Works
Turn-key
730 days
Gorakhpur
Please refer Tender documents.
2 documents required · 2 mandatory
₹23,600
Project Manager, C U, UPJN (U)
₹3.6 Cr
office of CE, U.P. Jal Nigam (Urban), Gorakhpur
6 Apr 2023
10 Nov 2022
21 Jan 2023
10 Nov 2022
21 Jan 2023
10 Nov 2022
24 Nov 2022
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Work | |||||
| 1.01 | Excavation in foundation in ordinary soil (loam, clay or sand) including lift upto 1.5 m and lead upto 50 m including filling, watering and ramming of excavated earth into the trenches or into the space between the building and side of foundation trenches or into the plinth and disposal of surplus earth upto a distance of 50 m from the centre of the foundation trenches.
0 - 1.5 m | 1,38,548.55 | cum | 173.55 | ₹2,40,45,655.05 |
| 1.02 | Excavation in foundation in ordinary soil (loam, clay or sand) including lift upto 1.5 m and lead upto 50 m including filling, watering and ramming of excavated earth into the trenches or into the space between the building and side of foundation trenches or into the plinth and disposal of surplus earth upto a distance of 50 m from the centre of the foundation trenches.
1.5 - 3 m | 1,27,556.18 | cum | 178.76 | ₹2,28,02,070.29 |
| 1.03 | Excavation in foundation in ordinary soil (loam, clay or sand) including lift upto 1.5 m and lead upto 50 m including filling, watering and ramming of excavated earth into the trenches or into the space between the building and side of foundation trenches or into the plinth and disposal of surplus earth upto a distance of 50 m from the centre of the foundation trenches.
3 - 4.5 m | 1,00,182.99 | cum | 185.7 | ₹1,86,04,281.79 |
| 1.04 | Excavation in foundation in ordinary soil (loam, clay or sand) including lift upto 1.5 m and lead upto 50 m including filling, watering and ramming of excavated earth into the trenches or into the space between the building and side of foundation trenches or into the plinth and disposal of surplus earth upto a distance of 50 m from the centre of the foundation trenches.
4.5 - 6 m | 9,017.49 | cum | 194.38 | ₹17,52,828.72 |
| 1.05 | Desludging / cleaning of nalla, earth inside of retaining wall by manual/mechanical means including all labour material T&P etc complete in all respect. | 2,46,182.2 | cum | 173.55 | ₹4,27,25,905.54 |
| 1.06 | Disposal of malva /dredged earth upto 5 K.M. including loading , unloading ,T&P ,labour material etc complete in all respect. (Assuming only 70 % quantity which is excavated is required to be disposed off) | 1,23,091.1 | cum | 86.36 | ₹1,06,29,531.94 |
| 1.07 | Construction of coffer dam by supplying gunny bags (new E.C. bag) filled with earth (available at site), its seweing, placing at proper location to stop the flow of sewage/water in construction zone, its dismentaling after construction and disposal of malva/bags upto a distance of 1 k.m. including all labour material T&P etc completye in all respect. | 60,512.5 | cum | 332.59 | ₹2,01,26,033.91 |
| 1.08 | Providing and erecting 1.00 metre high temporary barricading at site; each panel of size 2.50mx2.00m made of 40x40x6mm angle iron or 50x50x3mm hollow MS tube posts/horizontal members/bracings covered with 1.63mm thick MS sheet. The sheet shall be fixed with 30x5mm MS flat by suitable welding/riveting. The panels shall be made so that gap of 50cm above the ground is available making overall height as 2.5m. MS channel ISLC 75 @ 5.70 kg/m, 50cm long shall be provided at the bottom having oval shaped holes of size 50x25mm at both ends with 50cm long MS angle 40x40x6mm bracing. Suitable arrangement shall be made to fix the barricading to avoid from overturning by providing 250mm long SUB HEAD : 16- ROAD WORK 1340 expansion fasteners at both ends. The work shall be executed as per drawing/direction of Engineer-in-Charge hich includes writing and painting, arrangement for traffic diversion such as traffic signals during construction at site for day and night, glow lamps, reflective signs, marking, flags, caution tape as directed by the Engineer-in-Charge. The barricading provided shall be retained in position at site continuously i/c shifting of barricading from one location to another location as many times as required during the execution of the entire work till its completion. Rate include its maintenance for damages, painting, all incidentals, labour materials, equipments and works required to execute the job. The barricading shall not be removed without prior approval of Engineer-in-Charge. (Note: - One time payment shall be made for providing barricading from start of work till completion of work i/c shifting. The barricading provided shall remain to be the property of the contractor on completion of the work). | 1,500 | RM | 1,720.97 | ₹25,81,453.5 |
| 1.09 | Pumping of sub soil including making necessery bores of dia. 150 mm upto minimum 10 m depth,lowering of PVC pipe of 150 mm ( 6kg/cm2), hiring and lowering of 2/3 hp submersible pumps,hiring of D.G. set with fuel,operator,its maintenance including all labour material T&P etc complete in all respect upto satisfaction of engineer in charge. | 19,364 | RM | 9,131.56 | ₹17,68,23,566.57 |
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
recovered-award.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
BOQ_1218991.xls
BOQ Document • 0.40 MB
108623061.pdf
Tender Document • 5.88 MB
tenderdoc.pdf
Tender Document • 2.67 MB
108623066.html
Tender Document • 0.03 MB
110304055.pdf
Tender Document • 0.39 MB
111061705.pdf
Tender Document • 0.65 MB
111565262.pdf
Tender Document • 0.46 MB
112209505.pdf
Tender Document • 0.49 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .