| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.8 LAccepted-AOC | L1 | Accepted-AOC Not awarded due to non availability of fund under respective budget head | |
| 2 | Not Admitted-Finance | - | Not Admitted-Finance Not qualified for AOC | |
| 3 | Not Admitted-Fee/PreQual/Technical | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
Refer Docs
EMD Value
₹6,294
Closing Date
25 May 2020, 5:30 pmClosed
Director CDRI
CDRI Lucknow
Rewinding of defective 11/0.415 KV 750 KVA transformer installed in 11KV Substation at Chattar Manzil building old campus of CDRI
2020_CSIR_48262_1
2/26/2019-Engg.
Open Tender
Electrical Works
Item Rate
60 days
CDRI Lucknow
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹6,294
1 Sept 2020
15 May 2020
26 May 2020
15 May 2020
25 May 2020
15 May 2020
15 May 2020 - 22 May 2020
Amount
Loading and unloading
Loading and unloading (to & fro - two times) of transformer sl. No.2 of 750KVA, 11/0.433KV installed at animal house old campus of CDRI i.e. shifting from CDRI to workshop for dismantling, etc as required (Rate is inclusive of GST @18%).
Opening of top cover plate, dismantling of all connection of HV & LV side from winding to transformer terminal then lifting of core and washing assembly then shifting of core & winding core assembly in the safe place for the checking & testing, etc as required (Rate is inclusive of GST @18%).
Repairing/rewinding/replacement of all HV leg coil, complete with insulating material & backing of coil assembly complete in all respect (for DPC covering charge), etc as required (Rate is inclusive of GST @18%).
Reconditioning of LT coil strip type 03 nos. complete with insulating material & backing of coil assembly complete in all respect (for DPC covering charge), etc as required (Rate is inclusive of GST @18%).
Replacement of complete conical washers with new HV&LV metal parts & new bushing, etc as required (Rate is inclusive of GST @18%).
Replacement of complete gasket of HV/LV top cover plate & inspection plate, etc as required (Rate is inclusive of GST @18%).
Complete fitting of dismantled coil in the core with help of separator & other insulation segment by properly making all open joint with coil,HV,LV side with tap charger, etc as required (Rate is inclusive of GST @18%).
Labour charge for complete transformer refitting assembly of core then trial & testing within workshop, etc as required (Rate is inclusive of GST @18%).
Centrifuging / dehydration and filtration of existing/old oil of transformer, as per IS & oil should with stand 40 KV for one minute at 4mm electrode gap for transformer No. 2, etc as required (Rate is inclusive of GST @18%).
Supply of new / fresh transformer oil for transformer No. 2, etc as required (Rate is inclusive of GST @18%).
Painting of complete transformer after cleaning the body surface of transformer by rubbing with emery paper to removal oil sustain, dust etc & applying 2 coat of synthetic enamel paint by spray paint (internal & external), etc as required (Rate is inclusive of GST @18%).
Scrap / defective copper winding of HV coil, etc as required (Rate is inclusive of GST @18%).
Other metal part/scrap materials dismantled from transformer, etc as required (Rate is inclusive of GST @18%).
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .