| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹81.8 LAccepted-AOC | ₹81.8 L | L-1 | Accepted-AOC Accepted as L-1 |
| 2 | L-2₹90.1 L+₹8.3 L (10.1%)Rejected-Finance CAMP VILLAGE DEVGAI POST KUDRI SHADOL MP PIN 484110 | SHAHDOL | MADHYA PRADESH | 484110 | ₹90.1 L+₹8.3 L (10.1%) | L-2 | Rejected-Finance Rejected as L-2 |
| 3 | L-3₹1.0 Cr+₹21.1 L (25.8%)Rejected-Finance NEAR BHARTIYA VIDYA MADIR CHURCHA DISTT KOREA CHHATTISGARH 497339 | CHURCHA | KOREA | CHHATTISGARH | 497339 | ₹1.0 Cr+₹21.1 L (25.8%) | L-3 | Rejected-Finance Rejected as L-2 |
| 4 | L-4₹1.3 Cr+₹44.4 L (54.3%)Rejected-Finance | ₹1.3 Cr+₹44.4 L (54.3%) | L-4 | Rejected-Finance Rejected as L-2 |
| 5 | L-5₹1.3 Cr+₹46.0 L (56.3%)Rejected-Finance A 49 10 VINDHYA COLONY PINOURA DISTRICT UMARIA MADHYA PRADESH 484555 | UMARIA | MADHYA PRADESH | 484555 | ₹1.3 Cr+₹46.0 L (56.3%) | L-5 | Rejected-Finance Rejected as L-2 |
| Sl No | Description | Qty | Unit | ABADH KISHOR SHARMA L5 | M/S D P LAHIRI L3 | RAVI KUMAR JAISWAL L2 | MAHENDRA SINGH L4 | M/S ESCAB TECNOXPERT L1 |
|---|---|---|---|---|---|---|---|---|
| 1.00PARTICULAR | ||||||||
| 1.01 | Cleaning/removal of debris/stone from galleries and stacking within 50 m distance For Drive head - 8(10.00 * 4.20 * 0.4 = 134.40 M3) Cleaning of Gallery for Installation of Belt Conveyor - 4540X4.00X0.10 = 1816.00 M3 Grand Total - 1816.00+134.40 = 1950.40 m3 | 1,950.4 | cubic mtr | 11,58,537.6 ₹13,67,074.37 | 9,36,192 ₹11,04,706.56 | 5,85,120 ₹6,90,441.6 Lowest | 11,50,736 ₹13,57,868.48 | 6,82,640 ₹8,05,515.2 |
| 1.02 | Groove cutting in solid coal/stone for foundation, manhole/duggi hole/pits and excavated material to be removed and stacked separately within 50m.distance. Cutting in soft stone by chisel & hammer = 48.00 m3
Drive head 8(2nos.*4.00*0.50*1.0 = 32.00 m3
Discharge 8(4nos.*0.50*0.50*1.0 = 8.00 m3
Looptakeup 8(4nos.*0.50*0.50*1.0 = 8.00 m3 | 48 | cubic mtr | 2,88,288 ₹3,40,179.84 | 2,32,704 ₹2,74,590.72 | 2,40,000 ₹2,83,200 | 2,88,000 ₹3,39,840 | 1,68,000 ₹1,98,240 Lowest |
| 1.03 | Loading of all kind of building materials in to tubs at incline/Pit mouth on surface with lead of 50m. (S/F)
CEMENT | 305 | Bag | 3,217.75 ₹3,796.95 | 2,562 ₹3,023.16 | 2,440 ₹2,879.2 Lowest | 3,202.5 ₹3,778.95 | 2,745 ₹3,239.1 |
| 1.04 | SAND | 21.36 | cubic mtr | 6,749.76 ₹7,964.72 | 5,446.8 ₹6,427.22 | 5,340 ₹6,301.2 | 6,621.6 ₹7,813.49 | 4,272 ₹5,040.96 Lowest |
| 1.05 | STONE | 42.72 | cubic mtr | 13,499.52 ₹15,929.43 | 10,893.6 ₹12,854.45 | 10,680 ₹12,602.4 | 13,243.2 ₹15,626.98 | 8,544 ₹10,081.92 Lowest |
| 1.06 | Transportation of all kind of building material from surface to u/g through haulages with tramming and pushing, coupling /uncoupling etc for a distance every 1.0 Km or part there of and bringing the empty tubs to surface.
CEMENT | 305 | Bag | 2,440 ₹2,879.2 | 2,013 ₹2,375.34 Lowest | 2,135 ₹2,519.3 | 2,440 ₹2,879.2 | 2,135 ₹2,519.3 |
| 1.07 | SAND | 21.36 | cubic mtr | 5,169.12 ₹6,099.56 | 4,165.2 ₹4,914.94 | 4,272 ₹5,040.96 | 5,126.4 ₹6,049.15 | 2,136 ₹2,520.48 Lowest |
| 1.08 | STONE CHIPS | 42.72 | cubic mtr | 10,338.24 ₹12,199.12 | 8,330.4 ₹9,829.87 | 8,544 ₹10,081.92 | 10,252.8 ₹12,098.3 | 4,272 ₹5,040.96 Lowest |
| 1.09 | Unloading of all kind of building materials from tubs at destination in u/g and stacking the same.
CEMENT | 305 | Bag | 2,354.6 ₹2,778.43 | 1,830 ₹2,159.4 Lowest | 1,830 ₹2,159.4 Lowest | 2,287.5 ₹2,699.25 | 2,135 ₹2,519.3 |
Tender Value
₹1.2 Cr
EMD Value
₹1.5 L
Closing Date
11 Jun 2026, 5:00 pmClosed
STAFF OFFICER MINING
OFFICE OF THE STAFF OFFICER MINING
Installation nd Dismantling of 1000 mm drive head (double drive drum ) nd Installation nd Dismantling of 1000 mm Belt conveyors in Proposed 2nd LHCM Panels of Burhar V Seam and Establishing of haulage track line and Dismantling of haulage track li
2026_SECL_360289_1
SECL/SGP/SO(M)/2026-27/NIT-733 dated 26-05-202
Open Tender
Civil Works - Others
Item Rate
365 days
DAMNI UG MINE
as per NIT
8 documents required · 8 mandatory
₹1.5 L
16 Sept 2026
26 May 2026
13 Jun 2026
26 May 2026
11 Jun 2026
27 May 2026
26 May 2026 - 4 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1PARTICULAR | |||||
| 1.01 | Cleaning/removal of debris/stone from galleries and stacking within 50 m distance For Drive head - 8(10.00 * 4.20 * 0.4 = 134.40 M3) Cleaning of Gallery for Installation of Belt Conveyor - 4540X4.00X0.10 = 1816.00 M3 Grand Total - 1816.00+134.40 = 1950.40 m3 | - | cubic mtr | 545.17 | - |
| 1.02 | Groove cutting in solid coal/stone for foundation, manhole/duggi hole/pits and excavated material to be removed and stacked separately within 50m.distance. Cutting in soft stone by chisel & hammer = 48.00 m3
Drive head 8(2nos.*4.00*0.50*1.0 = 32.00 m3
Discharge 8(4nos.*0.50*0.50*1.0 = 8.00 m3
Looptakeup 8(4nos.*0.50*0.50*1.0 = 8.00 m3 | - | cubic mtr | 5,510.07 | - |
| 1.03 | Loading of all kind of building materials in to tubs at incline/Pit mouth on surface with lead of 50m. (S/F)
CEMENT | - | Bag | 9.68 | - |
| 1.04 | SAND | 1 | cubic mtr | 290.84 | ₹290.55 |
| 1.05 | STONE | 1 | cubic mtr | 290.84 | ₹290.55 |
| 1.06 | Transportation of all kind of building material from surface to u/g through haulages with tramming and pushing, coupling /uncoupling etc for a distance every 1.0 Km or part there of and bringing the empty tubs to surface.
CEMENT | - | Bag | 7.42 | - |
| 1.07 | SAND | 1 | cubic mtr | 221.99 | ₹221.77 |
| 1.08 | STONE CHIPS | 1 | cubic mtr | 221.99 | ₹221.77 |
| 1.09 | Unloading of all kind of building materials from tubs at destination in u/g and stacking the same.
CEMENT | - | Bag | 7.05 | - |
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Tendernotice_1.pdf
PDF • 0.76 MB
Tendernotice_2.pdf
PDF • 1.48 MB
BOQ_373156.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .