Loading…
Loading…
Tender Value
₹1.2 Cr
EMD Value
₹1.5 L
Closing Date
11 Jun 2026, 5:00 pm6d left
STAFF OFFICER MINING
OFFICE OF THE STAFF OFFICER MINING
Installation nd Dismantling of 1000 mm drive head (double drive drum ) nd Installation nd Dismantling of 1000 mm Belt conveyors in Proposed 2nd LHCM Panels of Burhar V Seam and Establishing of haulage track line and Dismantling of haulage track li
2026_SECL_360289_1
SECL/SGP/SO(M)/2026-27/NIT-733 dated 26-05-202
Open Tender
Civil Works - Others
365 days
DAMNI UG MINE
as per NIT
8 documents required · 8 mandatory
₹1.5 L
26 May 2026
26 May 2026
13 Jun 2026
26 May 2026
11 Jun 2026
27 May 2026
26 May 2026 - 4 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | Item Code |
|---|---|---|---|---|---|---|
| 1PARTICULAR | ||||||
| 1.01 | Cleaning/removal of debris/stone from galleries and stacking within 50 m distance For Drive head - 8(10.00 * 4.20 * 0.4 = 134.40 M3) Cleaning of Gallery for Installation of Belt Conveyor - 4540X4.00X0.10 = 1816.00 M3 Grand Total - 1816.00+134.40 = 1950.40 m3 | - | cubic mtr | 545.17 | - | item1 |
| 1.02 | Groove cutting in solid coal/stone for foundation, manhole/duggi hole/pits and excavated material to be removed and stacked separately within 50m.distance. Cutting in soft stone by chisel & hammer = 48.00 m3
Drive head 8(2nos.*4.00*0.50*1.0 = 32.00 m3
Discharge 8(4nos.*0.50*0.50*1.0 = 8.00 m3
Looptakeup 8(4nos.*0.50*0.50*1.0 = 8.00 m3 | - | cubic mtr | 5,510.07 | - | item2 |
| 1.03 | Loading of all kind of building materials in to tubs at incline/Pit mouth on surface with lead of 50m. (S/F)
CEMENT | - | Bag | 9.68 | - | item3 |
| 1.04 | SAND | 1 | cubic mtr | 290.84 | ₹290.55 | item4 |
| 1.05 | STONE | 1 | cubic mtr | 290.84 | ₹290.55 | item5 |
| 1.06 | Transportation of all kind of building material from surface to u/g through haulages with tramming and pushing, coupling /uncoupling etc for a distance every 1.0 Km or part there of and bringing the empty tubs to surface.
CEMENT | - | Bag | 7.42 | - | item6 |
| 1.07 | SAND | 1 | cubic mtr | 221.99 | ₹221.77 | item7 |
| 1.08 | STONE CHIPS | 1 | cubic mtr | 221.99 | ₹221.77 | item8 |
| 1.09 | Unloading of all kind of building materials from tubs at destination in u/g and stacking the same.
CEMENT | - | Bag | 7.05 | - | item9 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Tendernotice_1.pdf
PDF • 0.76 MB
Tendernotice_2.pdf
PDF • 1.48 MB
BOQ_373156.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid