| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 2₹98.6 L+₹2.3 L (2.37%)Accepted-AOC C BLOCK 4G YUGA KALPATARU NO 18 PILLAYAR KOIL STREET PADIKUPPAM ROAD KOYAMBEDU CHENNAI 600 107 | CHENNAI | TAMIL NADU | 600107 | 2 | Accepted-AOC Rejected | |
| 2 | 3₹98.7 L+₹2.4 L (2.45%)Accepted-AOC KAMARAJ NAGAR AVADI CHENNAI TAMIL NADU | CHENNAI | CHENNAI | TAMIL NADU | 600071 | 3 | Accepted-AOC Rejected | |
| 3 | 1₹96.3 LRejected-AOC NO 28 BAGYALAKSHMI NAGAR 1ST MAIN ROAD ALAPAKKAM CHENNAI 600 116 | CHENNAI | CHENNAI | TAMIL NADU | 600116 | 1 | Rejected-AOC Accepted |
Tender Value
₹1 Cr
EMD Value
₹1 L
Closing Date
23 Feb 2024, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
The Commissioner,Tambaram City Municipal Corporati
MRM Street , West Tambaram ,Chennai - 45
15th CFC 2023 24 Providing BT Surface to Ward No 35 to 38
2024_MAWS_422438_2
106/2024/E1
Open Tender
Civil Works
Works
90 days
Tambaram City Municipal Corporation
15th CFC 2023 24 Providing BT Surface to Ward No 35 to 38
3 documents required · 3 mandatory
₹5,000
₹1 L
Tambaram City Municipal Corporation
10 Jun 2024
10 Feb 2024
23 Feb 2024
10 Feb 2024
23 Feb 2024
10 Feb 2024
15 Feb 2024
Amount
Charges for cutting the BT surface to 5 to 7 cm depth using milling machine, conveying the milled waste materials to at least for 20 Km distance including hire and running charges for the machine, conveyance charges, unloading at unobjectionable place, cleaning the milled surface as to avoid slippery including all other incidental and unforeseen items etc., complete as per the direction of the departmental officers
Providing and laying tack coat of 2kgs/10 sqm over the BT surface treated with binder using 2 kgs of bituminous Emulsion (RS) for 10square meter area including cost of bituminous binder, including labour charges for applying the required quantity of bituminous binder as tack coat manually etc., complete as per 503 of MORTH Specifications
Providing and laying 50 mm compacted thick dense bituminous macadam using 0.24 cum of 26.5-13.2 mm graded metal and 0.25 cum of 13.2-2.36 mm graded metal and 0.23 cum of 2.36 mm & below metal with 53.20 kgs of 60/70 bitumen for premixing per 10 sqm including cost and conveyance of all materials to C M P site, heating the bitumen and agregates to required temperature and mixing them in required temperature in central hot mix plant 20- 30 tonnes capacity conveying the mix by tipper trucks to paver site,spreading the mix in required temperature for uniform thickness of 50mm with mechanical paver to the specified grades and cross sections and compaction by Vibratory roller to the required density etc.,including labour charges for loading bitumen in to bitumen tank and metal to feeder unit,labour for attending to paver site etc., including hire charges and fuel charges for 20-30t C M P with bitumen boiler,tipper trucks, paver finisher, vibratory rollers and all other tools and plants required,including all other incidental charges etc.,complete using C M P clause 505 of MORTH Rev-5 specifications.
Providing and laying Bituminous concrete to 30mm thick using 0.13 cum of 19.00-9.50 mm graded metal and 0.17 cum of 9.50-2.36 mm graded metal and 0.26 cum of 2.36 mm & below metal with 50.30 kgs of 60/70 bitumen for premixing per 10 sqm including cost and conveyance of all materials to C M P site, heating the bitumen and agregates to required temperature and mixing them in required temperature in central hot mix plant 20- 30 tonnes capacity conveying the mix by tipper trucks to paver site, spreading the mix in required temperature for uniform thickness of 40mm / 30mm with mechanical paver to the specified grades and cross sections and compaction by Vibratory roller to the required density etc., including labour charges for loading bitumen in to bitumen tank and metal to feeder unit,labour for attending to paver site etc., including hire charges and fuel charges for 20-30t C M P with bitumen boiler,tipper trucks, paver finisher, Vibratory rollers and all other tools and plants required,including all other incidental charges etc.,complete using C M P clause 507 of MORTH Rev-5 specifications.
Add GST 18%
SRI SELLIAMMAN AND CO
M Karthik
stage.html
html • 0.05 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .