Tender ID
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Tender Value
Refer Docs
EMD Value
₹22 L
Closing Date
30 Nov 2026, 12:00 pm3d left
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Superintending Engineer
PMGSY Circle, PWD, 15/5 Civil Line Kanpur
Construction work of the Superintendent of Police Office, Additional Superintendent of Police Office and Public Grievance Redressal Cell Offices in District Farrukhabad Fatehgarh
2026_WBEAP_1211905_1
2309/167C-pmgsy.C/2026 Date 03.11.2026
Open Tender
Civil Works - Buildings
Percentage
365 days
Farukhabad
Please refer Tender documents.
2 documents required · 2 mandatory
₹6,950
₹22 L
S.E. PMGSY Circle, PWD, 15/5 Civil Line Kanpur
24 Nov 2026
24 Nov 2026
30 Nov 2026
24 Nov 2026
30 Nov 2026
24 Nov 2026
27 Nov 2026
120 days
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, for all lift, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. All kinds of soil. DSR-2.8.1 | 2,225 | CUM | 180 | ₹4,00,500 |
| 2 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc.in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 and for all lift. DSR 2.25 | 375 | CUM | 135 | ₹50,625 |
| 3 | Supplying and filling in plinth with sand underfloor, including watering, ramming, consolidating and dressing complete. DSR 2.27 | 83 | CUM | 1,469 | ₹1,21,927 |
| 4 | Providing and laying in position cement concrete of specified gradeexcluding the cost of centering and shuttering - All work up to plinthlevel :1:4:8 (1 Cement : 4 coarse sand : 8 graded stone aggregate 40mm nominal size) (DSR-4.1.8) | 206 | CUM | 4,712 | ₹9,70,672 |
| 5 | Treatment of soil under existing floors using chemical emulsion @ one litre per hole, 300 mm apart including drilling 12 mm diameter holes and plugging with cement mortar 1 :2 (1 cement : 2 Coarse sand) to match the existing floor With Chlorpyriphos Lindane E.C. 20% with 1% concentration DSR 2.35.3.1 | 701 | SQM | 214 | ₹1,50,014 |
| 6 | Providing and laying in position ready mixed or site batched design mix cement concrete for reinforced cement concrete work; using coarse aggregate and fine aggregate derived from natural sources, Portland Pozzolana / Ordinary Portland /Portland Slag cement, admixtures in recommended proportions as per IS: 9103 to accelerate / retard setting of concrete, to improve durability and workability without impairing strength; including pumping of concrete to site of laying, curing, carriage for all leads; but excluding the cost of centering, shuttering, finishing and reinforcement as per direction of the engineer-in-charge; for the following grades of concrete. Note: Extra cement up to 10% of the minimum specified cement content in design mix shall be payable separately. In case the cement content in design mix is more than 110% of the specified minimum cement content, the contractor shall have discretion to either re-design the mix or bear the cost of extra cement. All works upto plinth level Concrete of M25 grade with minimum cement content of 330 kg /cum 5.33.1.1 | 417 | CUM | 6,574 | ₹27,41,358 |
| 7 | Providing and laying in position ready mixed or site batched design mix cement concrete for reinforced cement concrete work; using coarse aggregate and fine aggregate derived from natural sources, Portland Pozzolana / Ordinary Portland /Portland Slag cement, admixtures in recommended proportions as per IS: 9103 to accelerate / retard setting of concrete, to improve durability and workability without impairing strength; including pumping of concrete to site of laying, curing, carriage for all leads; but excluding the cost of centering, shuttering, finishing and reinforcement as per direction of the engineer-in-charge; for the following grades of concrete. Note: Extra cement up to 10% of the minimum specified cement content in design mix shall be payable separately. In case the cement content in design mix is more than 110% of the specified minimum cement content, the contractor shall have discretion to either re-design the mix or bear the cost of extra cement. Concrete of M25 grade with minimum cement content of 330 kg /cum 5.33.2.1 All works above plinth level upto floor V level | 327 | CUM | 6,820 | ₹22,30,140 |
| 8 | Add for using extra cement in the items of design mix over and above the specified cement content therein. DSR-5.35 | 245 | QTL | 507 | ₹1,24,215 |
| 9 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level. Thermo-Mechanically Treated bars of grade Fe-500D or more. DSR-5.22.6 | 1,145 | QTL | 7,460 | ₹85,41,700 |
| 10 | Centering and shuttering including strutting, propping etc. and removal of form for : Foundations, footings, bases of columns, etc. for mass concrete(DSR 2023 5.9.1) | 1,631 | SQM | 271 | ₹4,42,001 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.22 MB
T2.pdf
Tender Documents • 1.85 MB
BOQ_2304155.xls
BOQ • 0.66 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .